Projects      TOP

Each Bercha Group project description is preceded by its project number. Although the work carried out for many of the projects spans a number of years, most are listed according to project number.

 

Consulting Services

Since 1975

Site Navigation

construction signProjects will be updated on an ongoing basis. When first added, new projects will be indicated as      

About Us

Services

Projects

Photo Gallery

Publications

Software

Links

Contact Us
 

 Projects that are currently underway are indicated "ongoing" as

  Links to Projects by Year

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

1998

1997

1996

1995

1994

1993

1992

1991

1990

1989

1988

1987

1986

1985

1984

1983

1982

1981

1980

1979

1978

1977

1976

1975

 
2023

To Top of Page

P2305 Quantitative Risk Assessment (QRA) for Proposed Residential Development in SW Edmonton
CLIENTS: Cantiro Charles Communities Ltd. & S.E. Developments Ltd.      DATE: 2023.
DESCRIPTION: A Quantitative Risk Assessment (QRA) for a new development (the Development) shown in Figure 1 proposed in the City of Edmonton in the vicinity of the Pembina High Vapour Pressure Ethane and the ATCO Natural Gas Pipeline (the Pipelines) shown in Figure 2. The Development addresses are 203B 34th Street SW and 102 17th Street SW. The QRA was done in accordance with the requirements of the COE regarding risk based setbacks of development in the vicinity of hazardous facilities, including evaluation of both Individual Risk Intensity (IRI) and Individual Specific Risk (ISR) levels and their tabular and graphic presentation. The Development proposed land use is planned to be low and high density residential.
Figure 1 - Development Plan Figure 2 - Locations of Pipelines near Development
P2304 Quantitative Risk Analysis (QRA) for a Proposed Development adjacent to Edmonton Cargill Granary
CLIENT: The City of Edmonton, Land Development Planning / Real Estate Branch.     DATE: 2023
DESCRIPTION: Quantitative Risk Assessment (QRA) for a new residential development proposed in the vicinity of the Cargill Granary (Figure 1) in Edmonton located at 13020 127 Avenue NW. The Granary operates year round, 24/7, unloading, storing, and loading grain shipments to and from trains and trucks as indicated in Figure 2. The QRA was done in accordance with the requirements of the COE regarding risk based setbacks of development in the vicinity of hazardous facilities, including both Individual Risk Intensity (IRI) and Individual Specific Risk (ISR) levels determination and tabular and graphic presentation.
Figure 1 - The Cargill Edmonton Granary Figure 2 - Granary Loading, Unloading, and Storage
2022

- 2023                                                                                                                                                                    To Top of Page

P202.2

 

Bow River Flood and Drought Mitigation Project

CLIENT: Confidential      DATE: 2019-2023

DESCRIPTION: Continuation of previous project support (P202.2). Options to a new dam were studied by Bercha. The principal option investigated and recommended is dredging the reservoir to increase capacity to the required volume.

2021

To Top of Page

P203.1

 

Port Edward LNG HAZID, QRA, and Site Safety Optimization

CLIENT: Port Edward LNG      DATE: 2020-2021

DESCRIPTION: Port Edward LNG (PELNG) retained the Bercha Group Limited (BG)  to provide a quantitative risk analysis (QRA), HAZID, and site safety assessment services in support of the safe development of the PELNG facility and the permit application to the BC Oil and Gas Commission (BCOGC). The QRA report and the Site Safety Optimization report were submitted and accepted by the client in September 2020 and submitted to the BCOGC for their review. In 2021, BCOGC provided a list of further requirements which were dealt with by BG to the client’s satisfaction. Subsequently, the BCOGC provided a permit to PELNG to proceed to the next phase, detailed engineering, of the LNG project development.

2020

To Top of Page

P203.1

 

 

Port Edward LNG HAZID, QRA, and Site Safety Optimization

CLIENT: Port Edward LNG      DATE: 2020

DESCRIPTION: Port Edward LNG (PELNG) retained the Bercha Group Limited (BG) to provide quantitative risk analysis (QRA), HAZID, and site safety assessment services in support of the safe development of the PELNG facility and the permit application to the BC Oil and Gas Commission (BCOGC). The QRA report details the methodology used, the definition of hazard scenarios including conduct of a HAZID assessment, the frequency and consequence evaluation for the principal credible hazards defined, and the resultant risk and ways of mitigating it. The site safety assessment used the QRA results to provide recommendations on optimizing the safety of workers at the facility and public in the vicinity, including BC hydro workers at an adjacent facility, recreational individuals in the vicinity on land and on the sound waters, and occupants of vehicles on the nearby Yellowhead Highway. The proposed project was at the pre-front end engineering and design (pre-FEED) stage of its potential development, and the HAZID, QRA, and Site Safety Optimization Study were used as part of the PELNG application to the BC Oil and Gas commission. 

Click on map thumbnail for enlarged view.

P202.1 \ P1908

 

 

Bow River Flood and Drought Mitigation Project

CLIENT: Confidential      DATE: 2019-2021

DESCRIPTION: The continuation of P1908. In January 2020, it appeared the currently preferred option is to build a new dam roughly 2.5 km downstream of the existing one and to demolish the existing dam built in 1929. A Conceptual Assessment (CA) on three options was commissioned to, and undertaken by Wood Environment & Infrastructure Solutions in November of 2018, and made available after considerable delays to Bercha in September 2020. Work in 2020 to date has included review of the CA resulting in identification of deficiencies including the neglect of any consideration to the option of upgrading the existing dam and increasing the reservoir capacity by a combination of dredging, increasing the dam height, and installing a lower level outlet, all potentially increasing the reservoir capacity by approximately 40,000dam3.

P201.1

 

Heritage Valley Town Centre QRA

CLIENT: The CIty of Edmonton      DATE: 2020

DESCRIPTION: The City of Edmonton (COE), is planning to develop a multipurpose development, the Heritage Valley Town Centre (the Development) currently characterized by a Neighbourhood Area Structure Plan (NASP) shown below in Figure 1. As required by the City, a quantitative risk analysis (QRA) is required to assure acceptable locations of different land uses relative to risk sources. The principal risk sources are an ATCO high pressure natural gas pipeline and a Pembina crude oil pipeline, passing diagonally NE to SW through the subject location. The work was done in accordance with the requirements of the COE regarding individual specific risk (ISR) based setbacks of development in the vicinity of hazardous operations, generally as conducted by Bercha in the recent NASP 14 Health Centre Risk Analysis and other previous COE risk projects for Individual Specific Risk (ISR) setback evaluation.  Click on map thumbnail to view.

2019

To Top of Page

P1908 \ P202.1

 

Bow River Flood and Drought Mitigation Project

CLIENT: Confidential      DATE: 2019

DESCRIPTION: The work to end of 2019 has consisted of assisting landowners (the Residents) in their dealings with and understanding of the Bow River flood and drought mitigation studies, with focus on the Ghost Dam relocation project apparently under serious consideration. The Residents’ premises are east of the Ghost Dam, on the north side of the Bow River. One of the currently preferred options is to build a new dam roughly 2.5 km downstream of the existing one, and to demolish the existing dam built in 1926. A preliminary review of available information was conducted in 2019. A Conceptual Assessment on three options was commissioned to, and undertaken by Wood Environment & Infrastructure Solutions in November of 2018. Bercha will review this and advise on risk and impact aspects of current and potential options in 2020.

Click on map thumbnail to view enlarged image.

P1907

 

PhD Thesis External Examiner Services

CLIENT: University of Stavanger      DATE: 2019-2020

DESCRIPTION: External examiner for a PhD thesis” including detailed review and critique of the thesis, attendance at the thesis defence, and final recommendations. A review of the thesis was carried out, with consideration of the following main areas:
     • Relevance to theme and objectives of the Thesis
     • Quality of work
     • Originality of work
     • Use of or reference to previous work
     • Value of contribution to state of art

P1906

Motor Vehicle Accident Investigation

CLIENT: Confidential      DATE: 2019

DESCRIPTION:  Bercha in association with the Highway Institute of Canada, conducted an assessment of the architecture, as well as vehicular and pedestrian transportation provisions relevant to the accident.

P1905

ISO 35102 Arctic Offshore EER Petroleum and Natural Gas Industries – Arctic operations offshore installation escape, evacuation and rescue - Country Committee Comments DIS Edit (Related to P1801)

CLIENT: International Standardization Organization, ISO DC/67 Technical Committee -London, UK      DATE: 2019

DESCRIPTION: Review and assimilation of Country Committee comments for the Final DIS ISO 35102 of Sections 9, A.9, and B.1 setting out the requirements and recommended procedures for on EER Risk Analysis including a detailed illustration, in Section B.1, of the procedures as exemplified in its Probabilistic EER Simulator, a comprehensive risk analysis model for offshore EER for any specific location, operation, and operator, as well as final drafting of selected areas in various sections as required by the organizing committee.

     In mid-2019, the working group completed its final draft, and it was submitted to the ISO country committee. Bercha was largely responsible for the sections on risk analysis of EER, with a detailed description of a recommended procedure in Annex B. The final approval 1906 voting is was completed on December 16, 2019, and the final standard is due to be published in early 2020. Click on cover thumbnail to view enlargement.

P1904

Building Safety Architecture - Textbook preparation

CLIENT: Bercha Group      DATE: 2020

DESCRIPTION: Dr Bercha's second book, Building Safety Architecture, was completed in early 2020.

The book is intended to assist architects, engineers, and contractors to better understand, design, and construct buildings and other structures to protect occupants from natural and manmade threats to building safety. Subjects covered include:  a review of historical and current provisions, an examination of human behaviour in life threatening conditions, details of contemporary building emergency design provisions, documentation of current codes and design practices, and presentation of quantitative methods for evaluating the risk and reliability of different combinations of emergencies, building designs, and occupant characteristics. The subject matter is relatively unique because it is based on a meld of architectural and structural design and reliability engineering experience of the author acquired through five decades of practice.

P1903

CN Milton Logistics Intermodal Hub (related to P1805)

CLIENT: Halton Municipalities      DATE: 2019

DESCRIPTION: Canadian National Railways (CN) has proposed to construct and operate an intermodal (truck to rail) logistics hub in the town of Milton, generally as depicted below (image to come). The region of Halton, in which Milton is located, in 2016 retained the Bercha Group to assist with its intervention opposing the development on the basis of the generation of risks and various damages to the town and region. Bercha has and continues to provide expert risk analytic services including the review and assessment of CN submissions to the Canadian Environmental Assessment Panel, review of the original EIS, and Panel requests for additional information and CN replies thereto.

     In the period from May to July 2019, hearings on the proposed project were staged by the Canadian Environmental Assessment Panel, which were actively attended by Dr. Bercha on behalf of the Halton Municipalities. Extensive evidence on the risks and impacts of the proposed project was prepared and presented at the panel sessions in June. The recommendations of the panel are pending at and expected in early 2020.

2018

To Top of Page

P1805

CN Milton Logistics Intermodal Hub

CLIENT: Halton Municipalities      DATE: 2018

DESCRIPTION: Canadian National Railways (CN) has proposed to construct and operate an intermodal (truck to rail) logistics hub in the town of Milton, generally as depicted below (image to come). The region of Halton, in which Milton is located, in 2016 retained the Bercha Group to assist with its intervention opposing the development on the basis of the generation of risks and various damages to the town and region. Bercha has and continues to provide expert risk analytic services including the review and assessment of CN submissions to the Canadian Environmental Assessment Panel, review of the original EIS, and Panel requests for additional information and CN replies thereto. Click on thumbnail to view image.

P1803

 

Edmonton Development Site Quantitative Risk Analysis

CLIENT: City of Edmonton, subcontract to Associated Engineering Alberta Ltd.      DATE: 2018

DESCRIPTION: The work includes the conduct of a quantitative risk analysis (QRA) of a potential development site in the City of Edmonton (COE), including future sensitive uses including a major hospital and health campus, to assess risk based setbacks of development in the vicinity of hazardous facilities and operations within and near the development site. Potential risks to the site are generated from numerous oil and gas pipelines within and adjacent to the site, a proposed pipeline and a pipeline interchange facility, and a dangerous goods (DG) route on Anthony Henday Drive north of the site. Based on the COE development bylaw 12800 individual risk intensity (IRI) transects were developed for each of the five hazardous corridors affecting the site, mitigation measures including sheltering effects from different hazards (flash and jet fires) and applied, and transformed to plan views of risk contours spatially positioned on the potential development plan for two principal annual risk levels, 1 in 1 million, high density residential, and 3 in 10 million, for sensitive facilities such as hospitals. The project is currently ongoing.

P1802

QRA of Development Adjacent to Natural Gas Pipeline and CN Railway Line

CLIENT: Westbrook Developments Limited      DATE: 2018

DESCRIPTION: Westbrook retained the Bercha Group to conduct a quantitative risk analysis (QRA) in accordance with the requirements of the City of Regina (COR) regarding risk based setbacks of development in the vicinity of a proposed SaskEnergy natural gas pipeline and a CN Railway Branch Line between Regina and Moose Jaw at the southern extremity of the proposed development, to ensure that the development complies with the risk based setback criteria set by the City of Regina. Following risk mitigation measure assessment to reduce risks, cumulative risk contours indicating the low and high density residential development setbacks were established and used as a guide for the development plan.

P1801

ISO 35102 Arctic Offshore EER Petroleum and Natural Gas Industries – Arctic operations offshore installation escape, evacuation and rescue - Country Committee Comments DIS Edit

CLIENT: International Standardization Organization, ISO DC/67 Technical Committee -London, UK      DATE: 2015-2016, 2018

DESCRIPTION: Review and assimilation of Country Committee comments for the Final DIS ISO 35102 of Sections 9, A.9, and B.1 setting out the requirements and recommended procedures for on EER Risk Analysis including a detailed illustration, in Section B.1, of the procedures as exemplified in its Probabilistic EER Simulator, a comprehensive risk analysis model for offshore EER for any specific location, operation, and operator, as well as final drafting of selected areas in various sections as required by the organizing committee.

2017

To Top of Page

P1705

Indoor Air Quality (IAQ) Safety Assessment of Maui Condominium

CLIENT: Specific units in condominium, Maui, Hawaii, USA     DATE: 2017

DESCRIPTION: The work entailed collection of indoor air samples, lab analysis for impurities, and risk assessment, and recommendations for remediation. Hawaii Inspection Group (HIG) provided a sub- atmospheric pressure collection canister to Bercha to collect sample air from separate areas suspected of impure air. Sample canisters were then returned to HIG and shipped to a NIOSH-approved lab for analysis using USEPA: Compendium Method TO-15, “Determination of Volatile Organic Compounds (VOCs) in Air" and analyzed by Gas Chromatography/Mass Spectrometry (GC/MS). Results were assessed for occupant safety both chronic and acute, and recommendations for relief of chronic effects were made. Recommendations included increase in air changes (depending on unit air volumes) and air purifier installation. The project continues to be monitored.

P1703

Milton CN Intermodal Hub Risk Analysis

CLIENT: Halton Region, Planning and Development      DATE: 2017

DESCRIPTION: The CN Town of Milton Logistics Hub Development EIS and associated appendices were reviewed to assess the adequacy of information to form a basis of a quantitative risk analysis (QRA) of public safety during the construction and operation of the proposed facility. The information provided in the documents reviewed was found to be inadequate for input into a QRA. The principal risk sources from operations are the release of Dangerous Goods (DG) and traffic accidents from the increase of DG truck traffic in the area, DG releases can occur as a result of a malfunction or accident involving train derailment, collision, DG transfer to trucks, truck accident, and other release events. Risk from the construction is likely to be restricted to machinery operations and truck traffic. Qualitative and detailed quantitative information on all aspects of the operation related to DG’s is being generated to conduct the public safety QRA, which has been initiated.

P1702

ISO 35102 Arctic Offshore EER Petroleum and Natural Gas Industries – Arctic operations offshore installation escape, evacuation and rescue - Detailed CED Edit

CLIENT: International Standardization Organization, ISO DC/67 Technical Committee - London     DATE: 2017

DESCRIPTION: Detailed editing of Sections 9, A.9, and B.1 setting out the requirements and recommended procedures for on EER Risk Analysis including a detailed illustration of the procedures as exemplified in its Probabilistic EER Simulator a comprehensive risk analysis model for offshore EER, in the DIS and country Committee reviewed draft.

2016

To Top of Page

P1605

Updates to Fault Tree for Oil Spill Occurrence Estimators - Liberty Development Project Oil Spill Risk Analysis Subsea Pipeline

CLIENT: BSEE/BOEM     DATE: 2015-2016

DESCRIPTION: Project objectives include: assimilation of North Sea and U.S. OCS oil spill statistics, and evaluate their applicability; develop the fault trees for estimating oil spill occurrences from the proposed Project associated with spills of different size categories; use the fault tree approach in a Monte Carlo simulation, develop alternative oil spill indicators and assess their variability, including effect of variability of both the historical data and the future development scenario parameters; and evaluate the variability of alternative oil spill indicators for a similar development scenario in a non-Arctic location. Following the general risk analysis in P1508, the subsea double walled (pipe in pipe) oil production pipeline was analyzed for oil spill risk. As this had not been done before (anywhere) further development of fault tree application to this analysis was carried out, resulting in both a single point variable and distribution (using Monte Carlo) of spill risk, integrated into the integrated project spill risk evaluation.

           Click on thumbnails to view enlarged images.

Pipeline Spill Frequency

Island Spill Frequency

P1604

ISO 35102 Arctic Offshore EER Petroleum and Natural Gas Industries – Arctic operations offshore installation escape, evacuation and rescue - Initial Draft

CLIENT: International Standardization Organization, London, UK     DATE: 2016

DESCRIPTION: The escape, evacuation and rescue (EER) system promotes the successful escape from the incident, subsequent emergency or precautionary evacuation from the installation and the ultimate rescue of installation personnel. The EER provisions should be used as part of a continuous improvement process for managing risks and the safety of personnel working offshore in Arctic and cold regions. Bercha is responsible for the preliminary CD drafting and editing of Sections 9, A.9, and B.1 setting out the requirements and recommended procedures for on EER Risk Analysis including a detailed illustration of the procedures as exemplified in its Probabilistic EER Simulator a comprehensive risk analysis model for offshore EER.

P1603

Regina Risk Based Setbacks

CLIENT: City of Regina     DATE: 2015-2016

DESCRIPTION: The City of Regina (City) engaged Bercha to conduct an investigation of existing documents used in determining land use requirements in the vicinity of hazardous facilities such as gas pipelines, dangerous goods (DG) routes, and chemical and oil and gas plants. This work objective is to enhance the City’s understanding of methods for doing risk and hazard assessments and setting risk based setbacks for development in the vicinity of hazardous installations.
     Over 200 risk based threshold documents used worldwide were assembled and reviewed and of these 90 documents setting out such thresholds were selected for in depth study. Of the 90, 37 apply generally to all hazard sources. More specific threshold documents for different hazard sources compiled included 36 for oil and gas pipelines and facilities, 8 for railways, 10 for dangerous goods (DG) routes, and 8 for airports. From a review of the 27 most location-relevant documents, it was evident that the most rigorous approach to thresholds is to have a set of risk based criteria which applies to all risk sources, rather than having ones dedicated to each of the specific applications. A consistent threshold target for all applications (ie, railways, pipelines, facilities), whether individual or collective risk or both, was deemed favourable. A summary of specific conclusions follows:

1.      Consider the use of general thresholds applicable to all applications but only with performance based standards rather than prescriptive standards.

2.      Consider the 27 most location-relevant items identified as a basis for options for the City to consider for risk based setbacks. There is a trade-off between the documentable rigorous realism and ease of use of the threshold.

3.      Consider the comparison of individual risk intensity (IRI (MIACC)) and individual specific risk (ISR (actual risk)) thresholds which showed considerably higher ISR potential for the MIACC criteria for certain land uses such as outdoor workers which would be subjected to unacceptably high risk under the MIACC IRI criteria.

P1602

Risk Analysis for Urban Setbacks from Oil and Gas Pipelines in Proposed Subdivision

CLIENT: Harvard Developments, Regina     DATE: 2015-2016

DESCRIPTION: Risk based setbacks using both the MIACC and exposure factored individual risk guidelines were evaluated for two natural gas and one oil pipeline within the proposed development location.

2015

To Top of Page

P1508

Liberty (Mod 0005) – Updates to Fault Tree for Oil Spill Occurrence Estimators

CLIENT: BSEE/BOEM     DATE: 2015-2016

DESCRIPTION: Project objectives include: assimilation of North Sea and U.S. OCS oil spill statistics, and evaluate their applicability; develop the fault trees for estimating oil spill occurrences from the proposed Project associated with spills of different size categories; use the fault tree approach in a Monte Carlo simulation, develop alternative oil spill indicators and assess their variability, including effect of variability of both the historical data and the future development scenario parameters; and evaluate the variability of alternative oil spill indicators for a similar development scenario in a non-Arctic location. This work will be carried out within the context of the Liberty development and production plan (DPP).

P1507

Integration of Emergency Human Survival Provisions in Residential and Commercial Building Design

CLIENT: AIR     DATE: 2015-2016

DESCRIPTION: Publication of building safety textbook. Research and data collection on indoor air quality hazards.

P1506

Orlan EER System Risk Analysis

CLIENT: EXXON MOBIL Development Corp (EMDC)     DATE: 2015-2016

DESCRIPTION: Following Bercha review of planned Orlan-type EER study locations (identified by EMDC), approaches, and parameters, feedback and guidance on input values and approach was provided to EMDC. Following assimilation of operational and environmental conditions for 3 potential locations of the Orlan platform, current and potential configurations of the EER system were assembled. Each of the 3 cases for several different accident scenarios including blowouts, fires, ice, and extreme sea-state were risk analyzed for EER system reliability.

    Specific services included pre-study consultation, including determination of 6 sets of 6 Orlan environmental conditions (open water calm, open water Beaufort 8, moderate ice calm, moderate ice stormy, heavy ice static, heavy ice dynamic), and an annual average for 3 locations, and conduct of full EER reliability modeling of 7 accident scenarios using the Bercha PEERS software Version 10.1, including software documentation and EER escape, evacuation (4 EER systems), and rescue (3 rescue modes) and integrated EER reliability result generation.

P1503

Risk of Alternative TMPL Route Options in W Edmonton

CLIENT: City of Edmonton      DATE: 2015

DESCRIPTION: Investigation of TransMountain Pipeline risks to Edmonton locations. As part of the investigation, risk contours were developed using Cumulative Risk Analysis (CRA) methodology.

P1502

ISO 35102 Arctic Offshore Operations EER

CLIENT: ISO    DATE: 2015-2016

DESCRIPTION: Development and drafting of ISO 35102 Arctic operations escape, evacuation, and rescue (EER).

P1501

High Arctic EER Study

CLIENT: ExxonMobil Development Company     DATE: 2015-2016

DESCRIPTION: ExxonMobil Development Company (EMDC) is carrying out an evaluation of feasibility and effectiveness of Evacuation, Escape and Rescue (EER) systems in the high Arctic to provide recommendations on areas that require further improvement. Bercha conducted a quantitative study using Event Tree analysis to calculate the probability of successful evacuation under various conditions. A new version of Bercha’s Probabilistic Escape Evacuation and Rescue Simulator (PEERS) software, which includes fault and event trees, was developed and used.

2014

To Top of Page

P1410

 

High Arctic EER Study

CLIENT: ExxonMobil Development Company     DATE: 2014-2015

DESCRIPTION: ExxonMobil Development Company (EMDC) was carrying out an evaluation of feasibility and effectiveness of Evacuation, Escape and Rescue (EER) systems in the high Arctic to provide recommendations on areas that require further improvement. Bercha conducted a quantitative study using Event Tree analysis to calculate the probability of successful evacuation under various conditions. Bercha’s Probabilistic Escape Evacuation and Rescue Simulator (PEERS) software, which includes fault and event trees, shall be redeveloped.

P1409

TransMountain Pipeline Spill Risks

CLIENT: Gowlings LLP     DATE: 2014

DESCRIPTION: Review of proposed TransMountain pipeline spill risks and countermeasures.

P1408

ICETECH 2016 – International Conference and Exhibition on Performance of Ships and Structures in Ice

                conference feasibility

CLIENT: n/a   DATE: 2015-2016

DESCRIPTION: No conference was held in 2016. The ICETECH conferences focus on the general  theme of performance of ships and structures in ice, covering a wide range of specialty topics including icebreaking ships, ice resistant structures, and operations in ice. Technical papers are presented by experts from around the world. A small commercial exhibition for industry and related organizations is always well attended. The most recent ICETECH conference to date was held in 2014, with the sub-theme: looking to the future in a warming world. For more details refer to the website: www.icetech16.org.

P1407

Foxtail Grove Subdivision QRA

CLIENT: Stantec-Dundee     DATE: 2014

DESCRIPTION: An earlier QRA (P1305) of the proposed Foxtail Grove development and adjoining potentially developable lands was carried out. A further risk assessment associated with future rail and highway bypass locations adjacent to the area was attempted, but appropriate DG data were not available for either the road or railway.

P1406

Addendum to Analysis of Risks to Proposed Harbour Landing West Development from Existing Oil and Gas Pipelines

CLIENT: Stantec Consulting Ltd     DATE: 2014

DESCRIPTION: Stantec retained Bercha Group Limited (Bercha) to conduct a quantitative risk analysis (QRA) of certain oil and gas pipelines to assess the risks they pose to the proposed Harbour Landing West development in 2012, resulting in a comprehensive final report based on the QRA issued in May 2013. There are two east west pipeline corridors passing through the proposed development. Corridor 1 is the southern one, containing six TransCanada Pipelines (TCPL) lines, and Corridor 2 is the northern one, with two TransGas (TG) lines. Recently, TCPL has issued notice of the energy east pipeline project involving the conversion of one of the TCPL lines, Line 4, from natural gas to crude oil, and Bercha has been asked to re-assess the risks with this future pipeline conversion in place. An Addendum report was prepared, giving details of this risk re-assessment.

P1405

Development of ISO 18819 Arctic Operations - Escape, Evacuation and Rescue from Offshore Installations

CLIENT: International Association of Oil and Gas Producers     DATE: 2014-2017

DESCRIPTION: Assistance with coordinating input from WG2 “task group” leaders or other WG2 members and prepare drafts of the standard (CD, DIS, FDIS) and to the extent possible, use ISO format. The goal is to develop a new international standard “Petroleum, petrochemical and natural gas industries. Arctic operations. Escape, evacuation and rescue” using expertise from countries with interests and experience from work in arctic conditions, including the following Arctic specific aspects:

·        EER in cold climate: health aspects of EER in extreme arctic conditions;

·        Human performance in life-threatening conditions-effect of perceptual narrowing and cognitive dysfunction on EER reliability, training specific aspects

·        Winterization issues to improve EER conditions in cold climate including,

o       Mechanical provisions for motor performance, lubricant changes, gas volumes for inflation

o       Enhancement for human performance including slip free and deicing of surfaces, clothing, thermal protection,

o       Integration of design aspects for mechanical (equipment) and human process reliability;

·        Analysis of applicability of the evacuation methods in extreme arctic conditions and optimal systems for both open water and ice conditions;

·        Emergency response vessels specifications for the Arctic.

o       Combination standby and rescue and/or evacuation vessels

o       Dedicated vessels off platform and launching from platform optimization

P1404

Updates to Fault Tree Methodology and Technology for Risk Analysis Chukchi Sea Sale 193 Leased Area

CLIENT: United States Department of the Interior, Bureau of Ocean Energy Management     DATE: 2014

DESCRIPTION: Oil spill occurrence estimates were generated for the future hypothetical oil and gas development scenario, the Anchor A and Satellite A-2 (the Project), in the Chukchi Sea Outer Continental Shelf (OCS) Sale 193 Leased Area. Because sufficient historical data on offshore oil spills for this region do not exist, an oil spill occurrence model based on fault tree methodology was developed and applied. Using the fault trees, base data from the Gulf of Mexico and Pacific OCS including the variability of the data, were modified and augmented to represent expected Arctic offshore oil spillage frequencies.

P1403 Risk Analysis Methods and Applications - BOOK - 2nd printing
CLIENT: n/a   DATE: published in 2012, 2nd printing 2014
DESCRIPTION:
This book encapsulates Dr. Bercha’s unique expertise gained throughout his professional career which spans over 40 years. This book will benefit those working in the field of risk analysis, and is of value to decision makers, land use planners, operators, and others. Part 1 lays out a clear methodology and approach to solving complex risk analysis problems. Part 2 presents practical application of this methodology in a variety of settings. Follow the links below to purchase or for more detailed information.

View the book cover           >> Go to "About Us" for current ordering information >>            

P1402 Risk Analysis and Land Use Planning Applications
CLIENT: City of Oakville DATE: 2014
DESCRIPTION: To provide an introduction to risk analysis and its applications to land use planning in the context of the proposed Union Gas natural gas pipeline in Oakville, Ontario.

P1401

Building Safety Architecture – Book
CLIENT: n/a     DATE: 2014
DESCRIPTION: This book, by Dr Bercha, is about architectural provisions to enhance the safety of building occupants. The provisions entail protection from natural and manmade threats. The main areas covered are the identification and detailed characterization of natural and manmade threats or hazards, description of human behaviour under life threatening emergency conditions, a description and analysis of existing regulatory and physical provisions for the protection of building occupants, a look to future threats from global warming and possible ways of protecting against it, and finally ways of enhancing the design of new buildings and retrofit of existing buildings to provide optimal protection to building occupants. Preparation of the manuscript began in 2014.
2013

To Top of Page

P1306

 

Westerra Subdivision QRA

CLIENT: Harvard Developments     DATE: 2013

DESCRIPTION: Quantitative Risk Analysis including risks to potential development occupants from adjacent gas storage caverns and an industrial waste processing plant. The QRA is carried out under Regina planning protocol, utilizing the Regina interpretation of MIACC guidelines as land use planning thresholds.

P1305

 

Foxtail Grove Subdivision QRA

CLIENT: Stantec-Dundee     DATE: 2013

DESCRIPTION: QRA of the proposed Foxtail Grove development and adjoining potentially developable lands. An earlier QRA covered part of the Foxtail Grove development in 2009; an update of that QRA is carried out, as well as further risk assessment associated with future rail and highway bypass locations adjacent to the area. The QRA is carried out under Regina planning protocol, utilizing the Regina interpretation of MIACC guidelines as land use planning thresholds.

P1304

 

Escape, Evacuation, and Rescue (EER) Assessments for the Amauligak Development

CLIENT: ConocoPhillips Canada     DATE: 2013

DESCRIPTION: Work involves the development of a conceptual assessment of the reliability of various EER systems for various options for the proposed Amauligak development. The work includes general EER system description and conceptual evaluation, quantitative EER options evaluation using probabilistic model, and the conduct of a HAZ-EER and workshop sessions. Principal evacuation systems evaluated include ice resistant TEMPSC, ARKTOS, and gangways to and from ice breaking SBVs.

P1303

 

ATCO Urban Pipeline Relocation Risk Issues

CLIENT: Carscallen LLP     DATE: 2013

DESCRIPTION: Technical advice to legal firm representing intervenors regarding the proposed relocation of urban natural gas pipelines in Transportation Utility Corridors in Calgary and Edmonton. The advice was based on risk related assessments carried out by the proponent, and included suggestions on improving the scope and coverage of such risk analyses.

P1302

 

Historical Pipeline and Tanker Failure Frequency and Consequence Study

CLIENT: ConocoPhillips Canada     DATE: 2013

DESCRIPTION: The purpose of the work was to provide a quantitative historical comparison and trending of accidents involving applicable types of pipelines and tankers with an indication of the frequencies and consequences of accidents resulting in oil spills. Accordingly, the work consisted of the assimilation of worldwide statistics on buried, above grade, and subsea pipelines and crude oil tanker spills, with as much detail as available to provide information on spill causes and spill consequences. It is important to emphasize that the objectives did not include the consideration of specific Arctic or other project-specific effects on the oil spill statistics; rather, the work was restricted to the use of historical data largely from non-Arctic regions, except for above grade pipelines, although a section describing methodology applicable to Arctic projects was included.

P1301

 

ICETECH 2014 – International Conference and Exhibition on Performance of Ships and Structures in Ice

Looking to the Future in a Warming World

CLIENT: n/a   DATE: July 28-31, 2014

DESCRIPTION: ICETECH 2014, the 11th International Conference and Exhibition on Performance of Ships and Structures in Ice was held July 28-31, 2014 in Banff, Alberta Canada. Frank Bercha and Merv Edgecombe co-chair the 2014 Organizing Committee. Again, the focus was on the general theme of performance of ships and structures in ice - but with emphasis and special sessions on looking to the future in a warming world. There were 7 plenary and 50 technical presentations – covering a wide range of specialty topics within our theme of performance in ice, with emphasis on icebreaking ships, ice resistant structures, and operations in ice. These were presented during the conference by authors from around the globe. ICETECH hosted a small commercial exhibition for organizations in the industry. An all inclusive meal and social program for all delegates as well as tours and activities for accompanying persons was offered. See www.icetech16.org for more.

2012

To Top of Page

P1208

Analysis of Risks to Proposed Harbour Landing West Development from Existing Oil and Gas Pipelines

CLIENT: Stantec Consulting Ltd     DATE: 2013

DESCRIPTION: Stantec retained Bercha to conduct a quantitative risk analysis of oil and gas pipelines to assess the risks to the proposed Harbour Landing West development, including the two east-west pipeline corridors. Corridor 1 is the southern one, containing six TransCanada Pipelines (TCPL) lines, and Corridor 2 is the northern one, with two TransGas (TG) lines. The City of Regina requires a risk assessment report on possible risks from hydrocarbon pipelines to any proposed subdivision in support of the permitting process.

P1207

Gas Release Evaluation

CLIENT: EnCana     DATE: 2013

DESCRIPTION: The modeling of the characteristics of a gas release from the subsea pipeline and on-land pipeline rupture. The work included the use of the proprietary blowdown and dispersion models to evaluate flammable gas cloud characteristics for selected release scenarios.

P1206

Loss of Well Control Occurrence and Size Estimators for the Alaska OCS

CLIENT: Bureau of Ocean Energy Management  (BOEM), United States Department of the Interior    DATE: 2012-2014

DESCRIPTION: A multiyear study of historical data and statistics on offshore losses of well control including blowouts, to provide quantitative input to future Arctic offshore well control accident probability and characteristic predictions. The objectives of this study were to:  (1) Update offshore loss of well control frequency information through 2012 for the US, Canadian and Australian offshore regions, the North Sea, and other areas with a comparable regulatory regime, including acquisition and analysis of the SINTEF blowout data base. Exposure variable information was also collated.  (2) Apply statistical procedures to develop loss of well control occurrence rates for different operational phases and product spilled - eg, gas, crude and condensate, drilling mud, as well as an outrider (small sample) analysis applicable to major events such as the Macondo blowout.  (3) Estimate issues of occurrence rates, size estimator(s) and confidence intervals related to this study and study results. Results and methodologies will be reviewed by a third party scientific panel of appropriate experts; submission of the study findings to peer reviewed publications is encouraged. The study was initiated in 2012, and completed in 2014.

P1205

Analysis of Sour Water Pipeline Release

CLIENT: Osler et al LLP     DATE: 2012

DESCRIPTION:  Review and analysis of facts and evidence relating to a sour water pipeline release in 2010.

P1204

Northern Gateway Project NEB Hearing Support

CLIENT: Northern Gateway Pipelines    DATE: 2012-2013

DESCRIPTION: Provision of technical services related to risk assessment and provision of expert testimony at National Energy Board (NEB) hearings on the permissibility of the proposed Northern Gateway Project, which consists of pipelines between Alberta and Kitimat, a transhipment terminal in Kitimat, and marine transportation of incoming condensate and outgoing crude oil to and from foreign locations. Risk analysis evidence was generated by the Bercha Group on various aspects of the project, including public safety of the pipelines, pump stations, terminal, and aspects of the marine transportation system, over several years during the project preparation phase. Dr Bercha was the expert witness in the pipeline operations panel at NEB hearings, supporting the evidence his company had generated, as well as other evidence filed through responses to Information Requests (IRs). In addition, technical support including quantification of potential release volumes associated with any location along the proposed pipelines was provided to support other studies, including spill trajectory modeling, and environmental impact assessments.

P1203

E&B Oil Development Project Quantitative Risk Analysis

CLIENT: E&B Natural Resources Management Corporation     DATE: 2012

DESCRIPTION: E&B Natural Resources Management Corporation (E&B) is proposing the development of the E&B Oil Development Project (the Project) on a site within the City of Hermosa Beach. The Project provides for the development of an onshore drilling and production facility that would utilize directional drilling techniques to access crude oil and natural gas reserves in the tide lands granted by the State of California to the City, and in an onshore area known as the “uplands”. The Project is divided into four phases as follows: Phase 1:  Site Preparation, Phase 2:  Drilling and Testing, Phase 3:  Final Design and Construction, and Phase 4:  Development and Operations. Only Phases 2 and 4 are dealt with in this report, because these are the only phases which include hydrocarbon drilling and production operations.

     To support the design and regulatory process, E&B has commissioned Bercha to carry out a quantitative risk analysis (QRA) to assess public safety and environmental risks resulting from the Project. The public QRA considers only acute risks to people from accidental hydrocarbon releases; it does not cover chronic health risks. The environmental QRA only considers acute environmental risks from oil spills offsite.

P1202 Analysis of Risks to Proposed Hawkstone Subdivision from Adjacent Hydrocarbon Multi-Pipeline Corridor
CLIENT: Hawkstone Developments Ltd.   DATE: 2012
DESCRIPTION: Bercha conducted a quantitative risk analysis of the multi-pipeline corridor adjacent to the proposed Hawkstone subdivision. The multi-pipeline corridor is located at the south boundary of the proposed development. The City of Regina requires a risk assessment report on possible risks from pipelines to the proposed subdivision in support of the permitting process.
P1201 Analysis of Risks to Dundee Regina Lands from Multi-Pipeline Corridor and Future Regina Bypass Road
CLIENT: AECOM  DATE: 2012
DESCRIPTION: Bercha conducted a quantitative risk analysis of the multi-pipeline corridor and future Regina west bypass to assess the risks as they may affect the Dundee Realty Corporation Lands. The City of Regina requires a risk assessment report on possible risks from pipelines and dangerous goods roads to any proposed subdivisions in support of the permitting process.
2011

To Top of Page

P1108

 

Escape, Evacuation, and Rescue (EER) Support Services
CLIENT: ConocoPhillips   DATE: 2011
DESCRIPTION: Provision of EER R&D, reliability analysis, and modeling services in support of Arctic offshore oil and gas development.

P1105

 

Enbridge Training
CLIENT: Enbridge   DATE: 2011
DESCRIPTION: The work under this project consists of provision of training services in quantitative risk analysis applications to both project integrity and public safety, as well as facilitation services for project risk reviews. The training component involves both these two phase workshops as well as distance learning including document transmissions, emails, and teleconversations.

P1104

Updates to Fault Tree for Oil Spill Occurrence Estimators. UPDATE OF GOM AND PAC OCS STATISTICS TO 2012
CLIENT: US Department of the Interior, Bureau of Ocean Energy Management,    DATE: 2013
DESCRIPTION: Historical data and their statistical analyses are used as a starting point for fault tree application to oil spill indicator quantification for the Alaska Arctic Outer Continental Shelf (OCS). In the initial fault tree analysis, data from the Gulf of Mexico (GOM) OCS were analyzed for the period from 1972 to 1999. In 2008, a more refined publication of the data characteristics by MMS (now BOEM) has made it possible to conduct a more thorough statistical analysis as well as an update of the GOM data and its analysis to 2006. The current report generally discusses and gives data summaries as well as detailed statistical results from the re-analysis of the data, including an update of the GOM and Pacific (PAC) OCS data for platform and pipeline hydrocarbon (crude oil, diesel oil, condensate and refined petroleum products) spills, and an update of blowout and well release spill frequencies to 2012. The work is covered by BOEM contract number M11PC00013, and it is the first update under Task 2

P1103

Building Safety Research
DATE: 2011-2014
DESCRIPTION:
The project consists of research directed at the optimization of building design provisions for occupant safety under emergency conditions. Both hazards associated with natural phenomena such as hurricanes and tsunamis and man-made hazards such as fires and explosions are considered. The work consists of the review of incident data and data bases, review of existing building code provisions in both North America and worldwide locations, and the development of economic and risk-benefit algorithms to balance between the various safety provisions and associated costs of these provisions, and potential probabilistic cost of the consequences with and without the provisions.

P1101 

Alternative Oil Spill occurrence Estimators for the Beaufort and Chukchi Seas - Fault Tree Method
CLIENT: U.S. Bureau of Ocean Energy Management Regulation, and Enforcement (BOEM)   DATE: 2011
DESCRIPTION: The BOEM Alaska Offshore Continental Shelf (OCS) Region needs estimates of oil spill occurrences for the development of environmental impact statements for possible future offshore developments resulting from the sale of leases for the US Beaufort Sea Outer Continental Shelf. Since 2000, a series of studies carried out by Bercha were directed at the development of a realistic method of predicting oil spill occurrences, including source, size distribution, location, and timing for potential future development scenarios associated with offshore OCS lease sales.

Due to the embryonic state of offshore oil development in this region, it was not possible to base these oil spill probability estimates on empirical data from that region. Rather, statistically significant non-Arctic empirical data from the US Gulf of Mexico (GOM) and world-wide sources, together with their variance, were used as a starting point. Next, both the historical non-Arctic frequency distributions and spill causal distributions were modified to reflect specific effects of the Arctic setting, and the resultant fault tree model was evaluated using Monte Carlo simulation to adequately characterize uncertainties treated as probability distribution inputs to the fault tree. A series of studies, associated with successive lease sale scenarios between 2000 and 2006, was carried out directed at developing and applying the fault tree methodology. In addition, a study directed solely at updating the GOM data was carried out. The series of studies consisted of five Beaufort and/or Chukchi application studies and the GOM data update studies. This report summarizes the methodology and gives results of its application to the prediction of oil spill probabilities and their characteristics for the Chukchi and Beaufort Seas region based on the most recent studies using the most recent statistics.

P1100

Risk Analysis Methods and Applications - book
CLIENT: n/a   DATE: first printing 2012
DESCRIPTION:
This book encapsulates Dr. Bercha’s unique expertise gained throughout his professional career which spans over 40 years. This book will benefit those working in the field of risk analysis, and is of value to decision makers, land use planners, operators, and others. Part 1 lays out a clear methodology and approach to solving complex risk analysis problems. Part 2 presents practical application of this methodology in a variety of settings. See P1403.
2010

To Top of Page

P1010

NORTHERN GATEWAY KITIMAT TERMINAL QUANTITATIVE RISK ANALYSIS
CLIENT: Northern Gateway Pipelines Inc  DATE: 2011
DESCRIPTION:
Northern Gateway Pipelines Inc. (NGPL) is designing and preparing regulatory applications for its proposed Northern Gateway Project (NGP), which consists of an oil pipeline, a condensate pipeline, and the Kitimat Terminal (the Terminal). To support the Terminal design and regulatory process, NGPL has commissioned Bercha Group Limited (Bercha) to carry out a quantitative risk analysis (QRA) to assess personnel safety at the Terminal and public safety in its vicinity. The QRA considers only acute risks to people; it does not cover chronic health risks or environmental risks.

P1009

 

CUMULATIVE RISK ASSESSMENT AND LAND USE PLANNING PROJECT
CLIENT: City of Edmonton   DATE: 2011
DESCRIPTION: The purpose of the cumulative risk assessment (CRA) and Land Use Planning Project is to provide a characterization, analysis, and quantification of the risks to the community from multiple risk sources in the designated study areas, and to develop and implement risk based land use guidelines to provide support for the COE planning process. Accordingly, the results of the work are intended to support the COE planning process so that any alternative use of these results is not intended or valid.
     The scope of work in Phase 1 covers areas that are relatively highly developed in the City of Edmonton in terms of industrial facilities and adjacent public, residential, and commercial uses. Phase 2 concentrated on a developing area, the Horsehills area, with the focus shifted from the analysis of existing facilities to planned and potentially developing facilities.
     Work was dedicated to each of the main tasks as follows: data assimilation, cumulative risk analysis, Geographic Information System (GIS), risk communication and workshops, risk based land use guideline and bylaw, and conclusions and recommendations. These tasks are applicable to both phases, with distinct characteristics of each phase pointed out as needed.
P1008 UPDATE TO ANALYSIS OF RISKS TO PROPOSED LAND DEVELOPMENT IN SW REGINA FROM EXISTING NATURAL GAS PIPELINES
CLIENT: Stantec Consulting Ltd     DATE: 2009-10 (See also P2905)
DESCRIPTION: An analysis of the risks to proposed land development in southwest Regina from existing natural gas pipelines was carried out by Bercha (P2505) based on the preliminary concept plan of 2005. It was found that the risk to residents were at acceptable levels for the proposed plan. Subsequently, a revised plan has been generated. As requested by Stantec, Bercha reviewed its previous risk assessment in the context of the new proposed development plan and advised on risk acceptability in an Addendum Report.

P1007

ICETECH 2012 - INTERNATIONAL CONFERENCE & EXHIBITION on Performance of Ships and Structures in Ice
CLIENT: n/a   DATE: September 17-20, 2012
DESCRIPTION:
ICETECH 2012 was held September 17-20, 2012 in Banff, Alberta Canada. Frank Bercha and Alex Brovkin co-chaired the 2012 Organizing Committee. 60 technical and plenary presentations covered a wide range of specialty topics within the theme of performance in ice, with emphasis on icebreaking ships, ice resistant structures, and operations in ice. Post-Conference Proceedings include the papers and presentations from the conference, as well as information from Monday's session: World Maritime Day Observance: One Hundred Years after the Titanic, hosted by the North American Marine Environment Protection Association (NAMEPA) and Transport Canada. Conference photos and other information generated during the panels are also included.

P1005

 

NORTHERN GATEWAY RISK ANALYSIS
CLIENT: Northern Gateway Limited Partnership   DATE: 2010
DESCRIPTION: Provision of specialist services in support of National Energy Board application for the Northern Gateway Project.
P1006 HERMOSA BEACH PROPOSED OIL PROJECT LITIGATION
CLIENT: Bird Marella et al, PC      DATE: 2012
DESCRIPTION: A lawsuit by the original proponents of the proposed Hermosa Beach Oil Project was launched some years following the refusal by the City of Hermosa Beach to grant a permit to proceed with the project. Bercha Group had carried out the original risk analysis for the City in 1998, providing partial grounds for the City’s refusal to proceed with the project. Subsequently, MacPherson Oil, the original proponents of the project, initiated a lawsuit for lost profits due to the failure to proceed with the project. The work by Bercha consisted of review of various filings and documents and the preparation of a defense based on the facts available regarding the project safety and other aspects of the project in 1998. The matter was, however, settled out of court when E&B Natural Resources acquired the rights to MacPherson Oil and are currently proceeding with a new project proposal.

P1003

 

SOMERSET DEVELOPMENT RISK FACTOR REVIEW
CLIENT: McElhanney   DATE: 2010
DESCRIPTION: A mixed residential and commercial development adjacent to NE Regina is proposed. As the development is next to a CP railway and near an Enbridge multipipeline corridor, Regina planning requested that a risk analysis be carried out to ensure compliance with their risk-based planning guidelines. The work consisted of a qualitative study to define the relevant risk factors and their possible risk impacts and to indicate whether the land is likely to be “suitable for the uses intended” by the developer.
P1002 WATERTON 68 & CASTLE RIVER DEVELOPMENT RISK ANALYSIS
CLIENT: Shell Canada Energy  DATE: 2010
DESCRIPTION: Provision of risk assessment work for Shell on the Waterton 68 & Castle River Development projects.

P1001

 

EDMONTON CUMULATIVE RISK ASSESSMENT AND LAND USE PLANNING PROJECT
CLIENT: City of Edmonton   DATE: 2010
DESCRIPTION: The purpose of this cumulative risk assessment (CRA) and Land Use Planning Project was to provide a characterization, analysis, and quantification of the risks to the community from multiple risk sources in the study areas. Results formed recommendations for improved land use management, municipal land use policies and regulations, will provide improved assurance for industry, and promote ensured public safety. Accordingly, the emphasis in the work was on the technical risk analysis execution in a form and context amenable to application to the development of land use management, policies, and regulations to enhance compliance by industry and ensure public safety.

Generally, the scope of work in Phase 1 covered areas that were relatively highly developed in the City of Edmonton, in terms of industrial facilities and adjacent public, residential, and commercial uses. The risk analysis of these existing areas constituted the focus of Phase 1. Phase 2 concentrated on a developing area, the Horsehills Study Area. Here, the focus shifted from the analysis of existing facilities to the application of the knowledge gained from Phase 1 (and elsewhere) to planned and potentially developing facilities for the Horsehills area.

See also P1009 for current work relating to this project.

A facility in the study area

Dr. Bercha presents

Meetings throughout the project

2009

To Top of Page

P2911

PIPELINE INSPECTION AND SURVEILLANCE REQUIREMENTS AND PRACTICES IN CANADA
CLIENT: Emera Brunswick Pipeline  DATE: 2009-2010
DESCRIPTION: This work generated a summary of the requirements for pipeline inspection and surveillance practices to ensure the integrity of a pipeline in Canada for the purpose of transporting sweet natural gas. Actual practices of some operating pipeline companies were included, along with discussion of practices utilized for the subject pipeline.

P2910

ARKTOS GENERAL EVALUATION AND DEVELOPMENT
CLIENT: Transport Canada    DATE: 2009
DESCRIPTION: The work consisted of the full-scale evaluation of the performance characteristics of the ARKTOS shear zone vehicle. Tests were carried out in full-scale in the Fraser River, and included maneuverability, acceleration, and emergency operation without power from the leading unit. Generally, adequate performance was noted under normal operations; the emergency operation was satisfactory but not recommended under real emergency conditions.

P2909

ARCTIC EER SEMINAR
CLIENT: DBC Technologies   DATE: 2009
DESCRIPTION: A seminar on the general problems and solutions of operational and developmental for escape, evacuation and rescue, with emphasis on evacuation, for installations and ships in Arctic ice conditions was presented. In addition, a novel chute design for evacuation under toxic atmospheric conditions was reviewed and discussed.

P2908

TERMPOL VAPOUR CLOUD MODELING AND CONDITIONAL QRA
CLIENT: Northern Gateway Limited Partnership   DATE: 2009
DESCRIPTION: Bercha was contracted to conduct condensate vapour cloud modeling and a conditional quantitative risk analysis (QRA) to help fulfill the TERMPOL requirements for marine traffic associated with the Enbridge Northern Gateway Project. To help meet Transport Canada TERMPOL 3.15 requirements associated with marine shipping of liquid hydrocarbons in Canadian waters, the client requested Bercha conduct an accidental spill vapour cloud analysis and a conditional general risk assessment, on project-specified spill occurrence scenarios. The final report described in detail the vapour cloud dispersion, consequence, and conditional risk modelling carried out to assist in compliance with the stated TERMPOL requirements, and provide support for the environmental effects assessment for the project

P2906

NORTHERN GATEWAY PIPELINE OIL SPILL OCCURRENCE FREQUENCY ANALYSIS
CLIENT: Northern Gateway Limited Partnership   DATE: 2009-2010
DESCRIPTION: A key aspect in determining potential environmental and socio-economic effects of accidents and malfunctions that might occur during the construction and operation of an oil pipeline project is an indicator of the likelihood and magnitude of the occurrence of a spill. This report documents the methodology used and results generated on oil spill indicators for the proposed Northern Gateway Oil Pipeline.

P2905

ANALYSIS OF RISKS TO PROPOSED LAND DEVELOPMENT IN SOUTHWEST REGINA FROM EXISTING NATURAL GAS PIPELINES
CLIENT: Stantec Consulting Ltd   DATE: 2009
DESCRIPTION: An analysis of the risks to proposed land development in southwest Regina from existing natural gas pipelines was carried out by Bercha based on the preliminary concept plan of 2005. It was found that the risk to residents were at acceptable levels for the proposed plan. Subsequently, a revised plan has been generated. The client requested Bercha review its previous risk assessment in the context of the new proposed development plan and advise on risk acceptability.

P2903

DEMAND MODEL
CLIENT: ATCO Gas   DATE: 2009
DESCRIPTION: The work involved the development of a probabilistic gas supply demand model for northern Alberta. Monte Carlo simulation was utilized as a basis for the demand distribution estimates generated.

P2902

NORTHERN GATEWAY PIPELINE OIL SPILL RISK ANALYSIS
CLIENT: Northern Gateway Limited Partnership   DATE: 2009-2010
DESCRIPTION: To support the pipeline design and regulatory process, Bercha conducted an oil spill risk analysis for the pipeline, as well as specified regions and locations along the proposed route.

P2901

JOINT INDUSTRY PROJECT: ESCAPE, EVACUATION, AND RESCUE
CLIENT: Joint Industry Project    DATE: 2009
DESCRIPTION: Although there are numerous arctic offshore drilling and production operations, and numerous in the planning stage, no comprehensive quantitative feasibility and reliability evaluation of operational and developing escape, evacuation, and rescue Arctic and open water (EER) systems has been conducted.

     This work in the JIP has been structured to allow participation by different numbers of partners. Thus there is a common portion of the work, with generic results for all relevant EER technologies, and a partner-specific component which will allow each partner to designate a specific development scenario and location, to which two alternate EER designs, reliability analyses, sensitivities to accident scenarios, and technology gap analyses and conceptual gap rectifications will be carried out.

     As part of this project, an EER strategy workshop held in July of 2009 in conjunction with ConocoPhillips. The EER Strategy Workshop generated two general types of results, as follows:

     (1) Conceptual results regarding the EER systems and combinations considered, captured in the notes to the minutes and in the worksheets. These conceptual results represent the opinions of experts, not necessarily in agreement among themselves, but have been recorded regardless of consensus or dissention.

     (2) Numerical ranking results, giving some indication of the compliance with individual EER system criteria and average relative rankings among the systems considered.

2008

To Top of Page

P2816

 

ICETECH 2010 - INTERNATIONAL CONFERENCE & EXHIBITION on Performance of Ships and Structures in Ice
CLIENT: n/a   DATE: September 20-23, 2010
DESCRIPTION:
ICETECH 2010 took place September 20-23, 2010 in Anchorage, Alaska, USA. Frank Bercha, Lawson Brigham, and Nils Andreassen co-chaired the Organizing Committee. The Arctic Section of the Society of Naval Architects and Marine Engineers (SNAME) together with Alaska’s Institute of the North worked together to stage a very successful ICETECH 2010, the premiere international conference on ships and structures in ice. The theme of the conference is "Performance of Ships and Structures in Ice", but included the hot topics of global warming, geopolitics, and future expectations for the Arctic through participation of Arctic Marine Shipping (AMSA) and other experts.

P2815

See P1403 for most recent

 

METHODS AND APPLICATIONS OF RISK ANALYSIS - book preparation
CLIENT: n/a    DATE: 2008-2009
DESCRIPTION: The drafting and computations for a practical textbook providing guidance on methodologies and applications of risk analysis forms the bulk of this project. Started in 2006, by the end of 2009, the work had advanced to a draft manuscript consisting of over 20 chapters. The manuscript included methodology,  representative examples, and a detailed series of applications. Specific areas covered include pipelines (natural gas, sour gas, hydrocarbon liquids),  refineries and gas plants, road, rail, air and intermodal transportation systems, offshore facilities, sub-sea pipelines, escape, evacuation and rescue modeling, offshore marine oil spills, and other applications from the large repertoire of projects carried out by the Bercha Group.

P2814

MUSQUASH AREA QRA

CLIENT: Brunswick Pipeline     DATE:  2008

DESCRIPTION:  One of the undertakings of the National Energy Board hearings for the Brunswick Pipeline under P2608 was to carry out a risk analysis for the pipeline as it passes through a region of frequented with various hydraulic structures, including concrete and earth dams and pen stocks to hydroelectric plants. Utilizing the results of a hydraulic structure failure probability analysis by others, the risks from the Brunswick Pipeline in the vicinity of the hydraulic structures was assessed utilizing a modified version of the 2006 risk model adopted by the NEB.

P2813

DEMAND MODEL

CLIENT: ATCO     DATE:  2008

DESCRIPTION:  A preliminary design for the demand model from gas storage caverns in northern Alberta was developed. The model is to utilize the results of a statistical analysis of the volume flows correlated with ambient temperatures at roughly 80 gate or supply stations. Its purpose is to be able to predict the likely gas demand from the cavern for predicted user population under very cold winter temperatures. The project consisted of the review of previous work, data analysis, and a preliminary model design.

P2812

DEPOSITION

CLIENT: Confidential Client     DATE:  2008

DESCRIPTION: Consisted of attendance and deposition of expert evidence regarding the safety of a major trans-mountain crude oil pipeline. Evidence was based on a series of studies carried out by the Bercha Group over the previous four years.

P2811

QUANTITATIVE MAJOR RISK ANALYSIS OF AN OIL PIPELINE MARINE TERMINAL

CLIENT: Confidential Client     DATE:  2008

DESCRIPTION:  Consists of the quantitative risk analysis of a proposed major hydrocarbon liquids pipeline system, together with a marine terminal. Both onshore spills from the pipeline system and marine terminal facilities and offshore spills that could be generated through terminal operations, as well as approach and egress of hydrocarbon liquid tankers were studied and quantified.

P2810

LEAHEY QRA

CLIENT: DM Leahey & Associates Limited     DATE:  2008

DESCRIPTION:  Work consisted of the review of risks associated with the operation of a sour oil battery within the potential impact zone of the proposed residential subdivision.

P2809

 

MOLIKPAQ HAZEER

CLIENT: Sakhalin Energy Investment Corporation (SEIC)     DATE:  2008

DESCRIPTION:  The work consisted of a critical evaluation of the Molikpaq Escape, Evacuation, and Rescue (EER) systems and procedures. The Molikpaq is a former Beaufort Sea platform now located  off the east coast of Sakhalin Island at the Lun-A Field. Activities carried out included a review of previous studies and available information, implementation of a HAZOP type workshop at head offices in Yuzhno, as well as onsite at the Molikpaq, inspection and data collection at the Molikpaq platform including staging of various EER drills and their detailed documentation, and final reliability matrix, HazEER, and PEERS simulation analysis to assess the reliability of the system. Both an onsite and a final post-visit summary report were generated, giving short-term and long-term recommendations to improve the reliability of the system and associated procedures. The work was carried out by two senior Bercha Group experts on site with appropriate engineering support at home office.

Figure 1: Molikpaq in Ice

Figure 2: Molikpaq in Open Water

P2808

BATTERY QRA

CLIENT: DM Leahey & Associates Limited     DATE:  2008

DESCRIPTION:  The work was conducted jointly with Leahey, and consisted of a risk analysis of an existing sour oil battery being encroached by a residential subdivision. It was concluded that the proposed setback was adequate to assure only insignificant risk to members of the public.

P2807

CLUBROOT

CLIENT: Enbridge    DATE: 2008

DESCRIPTION:  The project was a combined risk and geomatics project involving the development of methodologies for the detection of clubroot infected canola fields. The primary application of the detection is the protection of uninfected fields from possible transmission of infected soils through pipeline construction machinery movements along the pipeline route.

P2806

PROPOSED ATCO VALVE INSTALLATION QRA

CLIENT: ATCO Pipelines     DATE: 2008

DESCRIPTION: The client proposed to install two new sets of block valves on their transmission line, located in the Canadian Pacific (CP) railway right-of-way in the Canmore area. The need for additional valves on this transmission line had been precipitated by the increase in population density in the vicinity of the pipeline. Although the addition of block valves to the transmission line will assist in reducing the amount of natural gas which could be released from a possible transmission line failure, the block valve installations themselves add risk as an additional potential release source. In order to assess the risks associated with the addition of the proposed valve installations, Bercha was retained to carry out a quantitative risk analysis (QRA). The general conclusion regarding risks from the proposed installations, was that risks to any members of the public, including workers, are all within acceptable and insignificant levels.

P2805

 

ICETECH 2008 INTERNATIONAL CONFERENCE & EXHIBITION WRAP UP
CLIENT: n/a    DATE: July 20-23, 2008
(see also P2615)

DESCRIPTION: Dr. Bercha chaired the Organizing Committee for ICETECH 2008. The conference positively exceeded expectations with over 175 delegates attending, full sponsor and exhibitor subscription, over 50 technical papers presented, and an exciting social and accompanying persons program. The technical program, the events, the setting, and the attendees made it a very enjoyable and technically sound event! The technical program each day began with two plenary papers, including: the changing Arctic; evolution of offshore safety regulations and practices; naval architecture developments for the Arctic; escape, evacuation, and rescue (EER); and current major offshore Arctic projects and developments. Workshops on EER and Arctic Marine Shipping Assessment (AMSA) rounded out the technical program. ICETECH 2008 Post-Conference Proceedings are available in CD format; see www.icetech16.org for ordering information.

P2804

SHELL HOIST INTERCONNECT PIPELINE QRA

CLIENT:  Shell Canada Products    DATE: 2008

DESCRIPTION: A quantitative risk analysis (QRA) was conducted of the proposed HOIST pipelines. The risk assessment included consideration of the engineering and operational parameters of the proposed project within the context of the current location. The risk source was a proposed multi-pipeline complex consisting of over 10 pipelines in a common corridor, transporting a variety of products ranging from heavy crude oil to LPGs and hydrogen. The primary focus of the risk assessment was quantification of acute risks to the public. The key results of the work are estimates of individual risks to the public for all representative individuals and conditions along the pipeline.

P2803

 

ALBERTA CLIPPER

CLIENT: Enbridge     DATE: 2008

DESCRIPTION: Provision of support risk services during the design and construction stages of a major crude oil pipeline from the Edmonton area to a location in southern Manitoba, south of St. Leon, where it crosses into the United States. Support services have included probabilistic analysis of various bid components and bids for construction of the various portions of the pipeline, general risk services, and detailed analysis of bids for each of the main segments, utilizing Monte Carlo simulation in order to provide probabilistic distributions of the likely outcomes in economic terms of these bids. The methodology utilized was a risk factor approach in which weighing factors were attributed to all significant factors associated with the likely economic performance of each bidder, to provide a risked cumulative distribution function of the probable capital cost distribution.

P2802

HARDISTY MERCHANT TANKS COST TO COMPLETION RISK

CLIENT: Enbridge     DATE: 2008

DESCRIPTION: In this study Bercha assessed risks to capital costs for a large industrial project. Cost distributions were calculated using selected risk factors, as well as the entire array of risk factors. The analysis was conducted on the basis of historical performance since the inception of the system, considering various economic factors, to provide a probable capital cost distribution using Monte Carlo simulation. Pertinent conclusions were generated and recommendations offered.

P2801

 

JOINT INDUSTRY PROJECT FEASIBILITY OF ARCTIC INSTALLATION EER

CLIENT:  ConocoPhillips (Canada) and StatoilHydro (Norway)     DATE:  2008-2010

DESCRIPTION:  The project consists of the analysis of existing EER systems for Arctic applications, their evaluation, and ranking according to reliability and overall feasibility, and the design and reliability analysis of new EER systems for locations selected by each of the partners. The site-specific analysis consists of the development of two alternative EER system configuration and its reliability analysis using the Bercha Probabilistic Escape, Evacuation, and Rescue Simulator (PEERS) to assess the absolute and relative reliability under a range of site-specific environmental and installation-specific operational and accident conditions.

2007

To Top of Page

P2713

TURNER VALLEY RESERVOIR CONTAMINATION RISK ANALYSIS

CLIENT: Town of Turner Valley     DATE:  2007-2008

DESCRIPTION:  The Town of Tuner Valley proposed to utilize the raw water storage reservoir to supply the Town’s potable water treatment plant, which provides the municipal water supply to the town residents. The plans for the conversion of this reservoir to provide potable water distribution had been developed and included a variety of provisions to assure that the water supply remained pure. Subsequently, interveners had expressed concern regarding the possible inadequacies of the proposed measures to maintain water purity, should such measures prove inadequate. In order to clarify the risk that may be posed by the reservoir conversion, Bercha was retained by the Town of Turner Valley to carry out a quantitative risk analysis (QRA), to provide perspective on the possible risk factors and their impact on reservoir and water distribution contamination.

P2712

QRA OF PROPOSED SAINT JOHN RIVER ALTERNATIVE CROSSING

CLIENT: Brunswick Pipeline     DATE: 2007

DESCRIPTION: At the time the study was conducted, the Brunswick Pipeline was proposed to extend from the Canaport LNG Facility at Mispec Point in St. John, New Brunswick, to the international border near St. Stephen, New Brunswick, where it would interconnect to facilities owned and operated by Maritimes and Northeast Pipelines. The preferred route for the pipeline crosses the Saint John River, between a location close to Spar Cove, to a southwest bank location at the Millford area. The preferred crossing method was a horizontal directional drill (HDD), which was analyzed in the QRA of the entire proposed pipeline, and publicly reviewed and generally approved at NEB hearings in Saint John in November 2006. Because there existed a possibility that the HDD may not be feasible or successful due to geotechnical conditions, an alternative crossing method – involving an open cut system – was considered. The open cut crossing was the subject of the P2712.

P2711

RISK ANALYSIS OF PROPOSED GAS DISTRIBUTION FACILITY

CLIENT:  Heritage Gas     DATE:  2007

DESCRIPTION: Heritage Gas proposed to locate a gas distribution centre in the vicinity of the Macdonald Bridge Halifax approaches. The Bridge Commission was concerned with possible damage from a failure at the distribution centre that could affect the structural integrity of the MacDonald Bridge and approaches. Heritage Gas requested Bercha to carry out a quantitative risk analysis (QRA) of the proposed facility at the proposed location, as well as the incoming pipeline in order to assess risk levels to the bridge and adjacent members of the public. Bercha provided results of the investigation carried out, as well as pertinent conclusions and recommendations.

P2710

NEW BRUNSWICK PIPELINE EPZ DESIGNATION

CLIENT: New Brunswick Pipeline     DATE: 2007-2008

DESCRIPTION:  An Emergency Planning Zone (EPZ) is an area in the vicinity of a hazardous installation, for which an Emergency Response Plan (ERP) is developed and implemented. The development of the plan requires the designation of an EPZ.  In this study, Bercha considered and made recommendations for an appropriate EPZ designation, for which an Emergency Response Plan (ERP) will be developed and implemented.

P2709

PROPOSED NORTH EAST REGINA RESIDENTIAL DEVELOPMENT RISK ANALYSIS

CLIENT: Stantec  DATE: 2007

DESCRIPTION: Bercha carried out a QRA to assess risks to residents in a proposed subdivision in north east Regina from an adjacent pipeline array and railway. The Bercha study followed the risk analysis steps and presented risk results as annual individual risks to resident.

P2708

MAJOR HYDROCARBON LIQUIDS PIPELINE AND TERMINAL SYSTEM

CLIENT:  Confidential Client     DATE:  2007

DESCRIPTION:   A risk analysis of a major hydrocarbon liquids pipeline system traversing mountainous territory was conducted. In addition, selected loading and unloading spill scenarios at a marine terminal were analyzed for probability and consequences, including worker and public safety and marine oil spills.

P2707

ARKTOS EER SYSTEM

CLIENT: Transportation Development Centre (TDC) of Transport Canada     DATE: 2007

Linked projects: P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001

DESCRIPTION:  The Final Report to project P2701, entitled “Escape, Evacuation, and Risk Research Project:  Phase III”, summarized the work conducted in the subject area from January 2000 to February 2006, and was published under TP14600E in March 2006. In 2007, additional information and data were obtained on the ARKTOS evacuation system, referred to in Sections 2.2.4 and 2.5 of the Phase III Final Report. Because these data, obtained through both direct experiment and from the manufacturer and various third party sources, provides a better representation of the ARKTOS system and its capability, an Addendum Report was generated under this project P2707. It specifically updated Sections 2.2.4 and 2.5 of the Phase III final report, and provided additional information on the ARKTOS system.

P2706

REVIEW OF HALIFAX HARBOR CROSSING QRA AND LAND USE EFFECTS STUDY

CLIENT: Heritage Gas     Date: 2007

DESCRIPTION: A review of current geotechnical findings confirmed that the existing QRA remained adequate and did not require changes. Additionally, Bercha addressed the question:  "What type of restriction will the pipeline place on future land development directly above or in the vicinity of the pipeline?". The Bercha study concluded the following:  The presence of a pressurized natural gas pipeline requires diligent use of space in its vicinity. The proposed line is well protected and has a high level of integrity by virtue of its deep location and high quality design, construction, and operation. Nevertheless, a zone delineating a 15 m vertical and 10 m horizontal separation from the is considered to be its vicinity. Within this location, although land use is practically unrestricted, certain guidelines to assure adequate protection to and from the pipeline have been recommended. With these guidelines, resultant risks are very low, and low enough to be considered insignificant.

P2705

PIPE TESTS

CLIENT: Confidential Client    DATE: 2007

DESCRIPTION:  Bercha provided advice and analysis of the statistical significance of a pipe testing program, including a future test configuration to provide adequate statistical significance on the integrity of pipemill produced line pipe.

P2704

 

Alternative Oil Spill Occurrence Estimators

CLIENT: United States Department of the Interior, Minerals Management Service, Alaska

DATE: Ongoing continuation of P2407 – contracted to Year 2010

DESCRIPTION: Oil spill occurrence estimates were generated for several expected future oil and gas development scenarios (including exploration, production, and abandonment) in the Alaska Offshore Continental Shelf (OCS) lease sale regions. Because sufficient historical data on offshore oil spills for these regions do not exist, an oil spill occurrence model based on fault tree methodology was developed and applied. Using the fault trees, base data from the Gulf of Mexico including the variability of the data, were modified and augmented to represent expected Arctic offshore oil spillage frequencies. Three principal spill occurrence indicators, as follows, were quantified:

§         Spill frequency

§         Spill frequency per barrel produced

§         Spill index, the product of spill size and spill frequency

 

These indicators were quantified for the following spill sizes:

§  

Small (S):

≥50 to <100 bbl

§  

Medium (M):

≥100 to <1,000 bbl

§  

Large (L):

≥1,000 to <10,000 bbl

§  

Huge (H):

≥ 10,000 bbl

 

Quantification was carried out for each future year for principal development scenarios, with a range of development parameters, in duration up to 40 years. In addition, a comparative scenario for non-Arctic locations was formulated and analyzed for oil spill occurrence. Generally, it was found that the non-Arctic spill indicators were likely to be significantly higher than those for similar scenarios in the Arctic. The computations were carried out using a Monte Carlo process to permit the inclusion of estimated uncertainties in the base and scenario data and Arctic effects. A wide range of details for each scenario was generated, including the following:

§         Expected time history of spill occurrences over the scenario life.

§         Spill occurrence variations by spill volumes in the above spill size ranges.

§         Spill occurrence variation by spill cause such as boat anchoring or ice gouging.

§         Spill occurrence contribution from each main facility type, including pipelines, platforms, and wells.

§         Comparison of spill occurrence predictions between Arctic and non-Arctic scenarios.

§         Life of field averages of spill occurrence estimators.

§         The variability in the results due to uncertainties in the inputs was expressed as cumulative distribution functions and statistical measures.

 

In the final report, a detailed description of the methodology, results, and conclusions and recommendations will be given, as well as a section on limitations of the study.

P2703

 

 

HOPEWELL QRA
CLIENT: DM Leahey & Associates Limited  DATE: 2007
DESCRIPTION: Quantitative risk analysis to assure safety of residential development in the vicinity of a low H2S sour gas pipeline, production wells, and battery in the Greater Edmonton area.

P2702

 

 

RISK ANALYSIS OF TEST HOLE ARCO#34 OPERATIONS

CLIENT: Petro-Canada      DATE: 2007
DESCRIPTION:
A quantitative risk analysis of the location and abandonment operations for an existing test hole in close proximity to the Petro-Canada steam assisted gravity drainage (SAGD) operation in the Athabasca Tar Sands. Because of numerous unknowns and uncertainties associated with the current condition of the existing, but undocumented test hole, it was necessary to establish risks based on current knowledge, and to refine these risk estimates as additional information became available from probes in the vicinity of the test hole. The purpose of the risk analysis was to assure operational personnel safety and SAGD project integrity maintenance.

Schematic illustration of SAGD Underground Test Facility

(Source: Pilot Testing of Post-Steam Bitumen Recovery from Mature SAGD Wells in Canada, 1998)

 

P2701

 

 

ESCAPE, EVACUATION, AND RESCUE (EER) R&D - PHASE III-B
CLIENT: Transportation Development Centre, Transport Canada     DATE: 2004-2006

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
DESCRIPTION: As part of EER Phase III, Bercha carried out focused R&D leading to the development of performance-based standards and guidelines for the offshore industry. Project P2701 is the continuation of and completion of the work started under project numbers P2601 and P2501. 
Please refer to P2501 for more detailed information. Further work has been conducted under P2707.

2006

To Top of Page

P2615

ICETECH 2008 INTERNATIONAL CONFERENCE & EXHIBITION on Performance of Ships and Structures in Ice
CLIENT: n/a   DATE: July 20-23, 2008
DESCRIPTION:
ICETECH-08 took place July 20-23, 2008 in Banff, Alberta, Canada. Dr. Bercha chaired the Organizing Committee for this international conference and exhibition on performance of ships and structures in ice. The theme and subject areas of the conference complemented and derived impetus from contemporary rapid growth of development and associated resurgence of interest in oil and gas exploration and production in Arctic offshore regions. Updated information and conference details were available on the conference website.

P2614

 

ASSESSMENT OF CONSEQUENCES AND RISKS ASSOCIATED WITH SOUR GAS FACILITIES LOCATED IN WEBBER GREENS NEIGHBOURHOOD
CLIENT: Lewis Estates Communities Inc.      DATE: 2006 
DESCRIPTION: This study was carried out jointly by DML Leahey & Associates Limited and the Bercha Group. This report specifically assessed operations at Advantage Energy Income Trust’s Battery at 07-31-052-25W4 and associated pipelines, wells and satellite batteries as they relate to sour gas production. The 7-31 Battery, previously operated by Suncor Inc., is situated in the Lewis Farms Area about 100 m north of the proposed Webber Green Land Development.  The assessment considered hazards, consequences and risks pertaining to the uncontrolled release of the gas in terms lethality and nuisances. It evaluated the risks attending the toxic effects of the gas as well as potential harm associated with fires and explosions. The potential for odour nuisances was also addressed.
P2613 REVIEW OF PIPELINE CORRIDORS AND PROPERTY DEVELOPMENT
CLIENT: Wintergreene Estates     DATE: 2006 
DESCRIPTION: An investigation of public risks associated with the development of Wintergreene Estates as proposed adjacent to existing pipeline corridors was carried out. The assessment involved quantitative risk modeling for various pipeline parameters utilizing Bercha Group proprietary consequence and risk integration models, and review of guidelines relating to development in the vicinity of pipeline systems. This work built on P2012.

P2611

DEEP PANUKE OFFSHORE AND ONSHORE RISK ANALYSIS

CLIENT: EnCana    DATE: 2006

DESCRIPTION: The work entailed a quantitative risk analysis of the onshore NPS20 high pressure natural gas pipeline, as well as consequence analyses for sub-sea facilities, including the sour gas injection pipelines, offshore production flowline, and NPS20 export line. The detailed quantitative risk assessment of the onshore facilities was presented to the National Energy Board in support of EnCana’s application for development and expert testimony was provided at the NEB hearings (March 2006) in support of the application.
Figure 1: As shown, the landfall area is characterized by sparsely treed terrain of medium gradient Figure 2: The inland area is interspersed with gravel roads left over from the mining operations that were conducted in the Goldboro area some decades ago.

P2610 ICETECH 2006 INTERNATIONAL CONFERENCE & EXHIBITION WRAP UP
CLIENT: n/a  DATE: July 16-19, 2006 (see also P2315)
DESCRIPTION: Dr. Bercha chaired the Organizing Committee for ICETECH 2006. The conference positively exceeded expectations with over 150 delegates attending, full sponsor and exhibitor subscription, 60 technical papers presented, and an exciting social and accompanying persons program. The presentation program, the events, the setting, and the attendees made it a very enjoyable and technically sound event! The technical program each day began with two plenary papers, including: the northern sea route; the changing Arctic; evolution of offshore safety regulations and practices; naval architecture developments for the Arctic; escape, evacuation, and rescue (EER); and current major offshore Arctic projects. Workshops on EER and the future of the Arctic rounded out the technical program.The conference was such a success that delegates requested a repeat in 2008, rather than the originally planned 2010. ICETECH 2006 Post-Conference Proceedings are available in CD format via www.icetech16.org.

P2609.1

QUANTITATIVE RISK RANKING OF SOUTHERN EXTENSION NATURAL GAS PIPELINE
CLIENT: ATCO Pipelines    DATE: 2006
DESCRIPTION: The work entailed an interactive development (with ATCO engineers) of a feasible risk ranking system for all ATCO natural gas transmission lines. The ranking system, once developed, was applied to selected natural gas lines, including the southern extension NPS8 pipeline running from the Edmonton area, south, to the City of Red Deer. The risk ranking took into consideration existing pipeline data, pipeline integrity characteristics, and population and property exposure.

P2609.2

QUANTITATIVE RISK ANALYSIS OF SOUTHWEST EDMONTON PIPELINE CORRIDOR
CLIENT: ATCO Pipelines    DATE: 2006
DESCRIPTION: ATCO Pipelines (ATCO) retained Bercha Engineering Limited (Bercha) to conduct a quantitative risk analysis of the risks from the ATCO pipeline in southwest Edmonton to surrounding populated locations. The proximity of the pipelines to existing and proposed high density locations, as well as to parallel crude oil Pembina pipeline, motivated ATCO to carry out this risk analysis.

 

A quantitative risk analysis was carried out to evaluate individual risk levels associated with the ATCO pipeline. A quantitative risk analysis includes the following principal steps:

  • Data assimilation,

  • Hazard definition,

  • Frequency analysis,

  • Consequence analysis,

  • Risk assessment, and

  • Conclusions and recommendations on risk mitigation.

 

Specifically, the risk results include the evaluation of individual risk at the pipeline location, together with its variation over the subject location, and a detailed analysis of mitigation measures.

P2608

NEW BRUNSWICK PIPELINE QUANTITATIVE RISK ANALYSIS
CLIENT: Emera    DATE: 2006
DESCRIPTION: In the project P2509, Bercha conducted a quantitative risk analysis of the preferred route for the Emera Pipeline (earlier proposed by M&NP). This risk assessment was subjected to detailed scrutiny by various interveners, including Friends of Rockwood Park, as well the City of Saint John First Responders including the fire department and other emergency responders. Under the current project, Bercha provided liaison activities with the First Responders, including numerous meetings, a series of short reports providing explanations and clarifications, and other informal communications. In preparation for the
National Energy Board (NEB) hearings held in November 2006, in Saint John, Bercha provided responses to numerous government, intervener, and Board information requests (IR’s), and assisted Emera in the preparation of their NEB hearing evidence. Finally, Bercha experts participated on a hearing panel during the NEB hearing for five days, and subsequently followed up with two undertakings. The work was particularly challenging due to the high level of concern regarding public safety associated with the proposed route passing partially through the City of Saint John.

The proposed pipeline route was of concern to local residents, as described on page B3 of the New Brunswick Telegraph-Journal (November 15, 2006).
P2607

ANALYSIS OF RISKS TO PROPOSED COCHRANE RESIDENTIAL DEVELOPMENT FROM ADJACENT HYDROCARBON PIPELINES
CLIENT: Timko Developments Limited    DATE: 2006
DESCRIPTION: Timko Developments Limited (Timko) retained Bercha Engineering Limited (Bercha) to conduct a quantitative risk analysis of the risks from hydrocarbon pipelines to Timko’s proposed development on Lot 2, Block 1, Plan 9411880 located in south west Cochrane. The proximity of the pipelines to the proposed high density residential complex has motivated Timko to carry out this risk analysis.

A quantitative risk analysis was carried out to evaluate individual risk levels associated with the proposed development from the adjoining pipelines. A quantitative risk analysis includes the following principal steps:

  • Data assimilation,

  • Hazard definition,

  • Frequency analysis,

  • Consequence analysis,

  • Risk assessment, and

  • Conclusions and recommendations on risk mitigation.

 

Specifically, the risk results include the evaluation of individual risk at the proposed development location from each of the pipelines individually, in pairs, and the combined risk from all four pipelines, together with its variation over the subject location.

P2606

 

QUANTITATIVE RISK ANALYSIS FOR CALGARY RING ROAD
CLIENT: Alberta Infrastructure and Transportation (AIT)    DATE: 2006
DESCRIPTION: The southwest Calgary ring road is proposed to pass through the drainage basin for the Glenmore Reservoir, which is the principal source of drinking water for the City of Calgary. Concern regarding the potential for spills of dangerous goods (DG) from traffic accidents on the proposed ring road predicated a need for a quantitative risk assessment of such spills. The QRA entailed the analysis of traffic patterns, historical DG accident causes and frequencies, derivation of ring road specific accident causes, frequencies and volumes, and a risk analysis considering the road drainage system and containment ponds to quantify the probabilities and volumes of DG spills that may reach the Glenmore Reservoir. The results indicated that, due largely to the containment systems proposed, there is an extremely low probability that spills can reach the Glenmore Reservoir, with a probability of a significant spill (in the order of 10 bbl) reaching the reservoir over a period of 100 years being less than 1%.
P2605 HAZID OF WELL DRILLING OPERATION IN LIBYA
CLIENT: Adams Pearson and Associates   DATE: 2006
DESCRIPTION: Hazard identification (HAZID) was facilitated by Bercha for the logistic and drilling operations associated with a development well in a frontier region in Libya. The primary purpose of the HAZID was to provide guidance to operational and design personnel on hazard foci and develop hazard mitigation and risk mitigation plans to assure successful completion of the well. The well was subsequently successfully completed.
P2603 GENERAL REGULATORY ADVICE
CLIENT: ATCO Pipelines    DATE: 2006
DESCRIPTION: Bercha, together with a legal firm, reviewed the significance of various CSA Z662 Class provisions, and assisted in a pragmatic interpretation of these within the context of ATCO natural gas transmission lines in different class locations.
P2602 UNDER BALANCED DRILLING INDUSTRY GUIDELINES
CLIENT: Canadian Association of Drilling Contractors (CAODC)        DATE: 2006
DESCRIPTION: Bercha assisted in the development of an under balanced drilling industry recommended practice (IRP) by facilitating various hazard identification sessions together with members of the IRP-24 sub-committee.
P2601

ESCAPE, EVACUATION, AND RESCUE (EER) R&D - PHASE III-B
CLIENT: Transportation Development Centre, Transport Canada    DATE: 2006

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
DESCRIPTION:
As part of EER Phase III, Bercha carried out focused R&D leading to the development of performance-based standards and guidelines for the offshore industry. Project P2601 is the continuation of and completion of the work started under project number P2501.  Please refer to P2501 for more information.

2005

To Top of Page

P2509

QUANTITATIVE RISK ANALYSIS OF THE PROPOSED BRUNSWICK NATURAL GAS PIPELINE

CLIENT: Maritimes and Northeast Pipeline on subcontract to Jacques Whitford Limited   DATE: February 2006
DESCRIPTION:
Maritimes and Northeast Pipeline (M&NP) retained Bercha International Inc. (Bercha) to perform a quantitative risk analysis of the proposed natural gas transmission pipeline linking the CanaportTM Liquefied Natural Gas (LNG) terminal in Saint John, New Brunswick to the US border exit point. The proposed pipeline is called the Brunswick Pipeline, and would be owned and operated by Maritimes and Northeast Pipeline. The goal of the work was to evaluate the risks associated with operating the proposed pipeline, and, if required, to identify any appropriate mitigative measures to minimize the risks to acceptable levels. The work supports M&NP’s development application that was to be submitted before the National Energy Board (NEB), as well as to provide risk management information in support of M&NP risk management programs.

Figure 1:  Existing M&NP Saint John Lateral posting including operator toll free number

Figure 2:  West of the City of Saint John; the proposed corridor would pass through rural surroundings

P2508

QUANTITATIVE RISK ANALYSIS OF THE PROPOSED SHELL SIBBALD DEVELOPMENT

CLIENT: Shell Canada Limited    DATE: 2006

DESCRIPTION: Shell Canada Limited proposed to drill a sour gas well, and – if the well is successful in terms of production – to construct and operate a gathering line for a distance of approximately 4 km north of the well location. Accordingly, Shell Canada Limited (Shell) retained Bercha Engineering Limited (Bercha) to perform a quantitative risk analysis of the proposed Shell Sibbald Development (SSD). The work was intended to support Shell’s energy development application to be submitted to the Alberta Energy and Utilities Board (EUB), as well as to provide risk management information in support of Shell risk management programs.

P2507

Alternative Oil Spill Occurrence Estimators and their Variability for the Chukchi Sea – Fault Tree Method

CLIENT: United States Department of the Interior, Minerals Management Service    DATE: ongoing (2006)

DESCRIPTION: Oil spill occurrence estimates were generated for several expected future oil and gas development scenarios (including exploration, production, and abandonment) in the Chukchi Sea Offshore Continental Shelf (OCS) lease sale regions. Because sufficient historical data on offshore oil spills for these regions do not exist, an oil spill occurrence model based on fault tree methodology was developed and applied. Using the fault trees, base data from the Gulf of Mexico including the variability of the data, were modified and augmented to represent expected Arctic offshore oil spillage frequencies. Three principal spill occurrence indicators, as follows, were quantified:

§         Spill frequency

§         Spill frequency per barrel produced

§         Spill index, the product of spill size and spill frequency

 

These indicators were quantified for the following spill sizes:

§  

Small (S):

≥50 to <100 bbl

§  

Medium (M):

≥100 to <1,000 bbl

§  

Large (L):

≥1,000 to <10,000 bbl

§  

Huge (H):

≥ 10,000 bbl

 

Quantification was carried out for each future year for one principal Chukchi Sea development scenario, with a range of development parameters, in duration up to 39 years. In addition, a comparative scenario for non-Arctic locations was formulated and analyzed for oil spill occurrence. Generally, it was found that the non-Arctic spill indicators were likely to be significantly higher than those for similar scenarios in the Arctic. The computations were carried out using a Monte Carlo process to permit the inclusion of estimated uncertainties in the base and scenario data and Arctic effects. A wide range of details for each scenario was generated, including the following:

§         Expected time history of spill occurrences over the scenario life.

§         Spill occurrence variations by spill volumes in the above spill size ranges.

§         Spill occurrence variation by spill cause such as boat anchoring or ice gouging.

§         Spill occurrence contribution from each main facility type, including pipelines, platforms, and wells.

§         Comparison of spill occurrence predictions between Arctic and non-Arctic scenarios.

§         Life of field averages of spill occurrence estimators.

§         The variability in the results due to uncertainties in the inputs was expressed as cumulative distribution functions and statistical measures.

 

In the final report, a detailed description of the methodology, results, and conclusions and recommendations was given, as well as a section on limitations of the study.

P2506 EXPERT TESTIMONY AND TECHNICAL SUPPORT
CLIENT: Confidential Client    DATE: 2005
DESCRIPTION: Bercha assisted the law firm retained by a confidential client in the development of technical evidence for various aspects of the client's pipeline integrity and operation. The work covered interpretations of regulatory provisions in the United States and international regime as well as review of specific operating and design procedures.

P2505

ANALYSIS OF RISKS TO PROPOSED LAND DEVELOPMENT IN SOUTH WEST REGINA FROM EXISTING NATURAL GAS PIPELINES
CLIENT: Stantec Consulting, Ltd.    DATE: 2005

DESCRIPTION: Stantec Consulting Ltd. (Stantec) retained Bercha Engineering Limited (Bercha) to conduct a quantitative risk analysis of the natural gas pipeline network relative to the proposed land development. The City of Regina required a risk assessment report on possible risks from the pipelines to the proposed development in support of the permitting process.

P2504

RED DEER PIPELINE SYSTEM OPTIMIZATION
CLIENT: ATCO Pipelines Limited   DATE: 2005

DESCRIPTION: Bercha assisted ATCO in the development and application of a system for ranking the rehabilitation priority of its pipelines. The work included a helicopter and walkabout inspection of the Southern Extension pipeline and meetings with ATCO personnel to discuss possible risk-based approaches to the rehabilitation ranking.

P2503

FAULT TREE ANALYSIS OF ALBERTA SOUR GAS FACILITIES

CLIENT: Alberta Energy and Utilities Board    DATE: March 2006

DESCRIPTION: The Alberta Energy and Utilities Board (AEUB) required a comprehensive frequency analysis of operating sour gas facilities throughout the province. By sour gas facilities under this project, are meant all sour gas well drilling, production well, pipeline, and other facility operations. Other facilities include those not covered by the three specified types of operations and included, but are not restricted to, items such as above grade metering, pig trap, valve, compressor station, and gas plant facilities. These latter facilities are referred to herein as “Other Facilities”.

P2502

HIGH CONSEQUENCE AREAS IDENTIFICATION AND RANKING
CLIENT: Confidential Client    DATE: 2005

DESCRIPTION: In risk assessment two principal aspects are addressed - the probability of occurrence and the magnitude of adverse  consequences of an undesired event such as an oil spill. Regardless of probability of occurrence, if the consequences are high, such as multiple fatalities, the location where this can happen is termed a High Consequence Area (HCA). The client has undertaken to identify all such areas along its pipeline in order to undertake mitigation of these high consequences through appropriate mitigation methods. In this study, the following principal areas are addressed:

     - A working definition of HCAs is developed

     - A methodology for identification of the HCAs is defined

     - An identification of HCAs for the pipeline is conducted

     - Approaches to HCA mitigation are developed.

Figure 1: HCAs were identified in the study area, utilizing maps, census information, and other data.

Figure 2: Possible adverse impacts to population, environment, and commercial navigation were considered in relation to the study area.

P2501

ESCAPE, EVACUATION, AND RESCUE (EER) R&D - PHASE III-B
CLIENT: Transportation Development Centre, Transport Canada     DATE: 2004-2006

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
DESCRIPTION: As part of EER Phase III, Bercha will carry out focused R&D leading to the development of performance-based standards and guidelines for the offshore industry.
     The goal of the program is to develop a prioritized and focused R&D program specific to EER, which will lead to the implementation of performance standards for the offshore industry. The Canadian Petroleum Boards have indicated that they will administer the Standards and implement them as Board Guidelines under the Accord Act. The Boards support the continuation of the EER research program and in parallel, the Boards, in co-operation with industry, have initiated a process to review the draft standard by the regulator. The results of this work will provide the rationale for the Regulators to evaluate design standards for EER systems employed in the offshore industry. The performance-based guidelines will address all relevant Human Factors/Ergonomic considerations with respect to the usability of the systems, training and other associated elements.
    Current work which is underway or has been carried out to support the R&D program under P2501, Phase III-B,  includes the following:

  • Further development of the EER simulator, the risk and performance tool (RPT). The risk and performance tool (RPT) was developed for the assessment of reliability and performance characteristics of different escape, evacuation, and rescue (EER) components and their integrated performance as an EER system for different offshore installations and operating conditions. The Risk and Performance Tool (RPT), uses an optimal combination of risk analysis and simulation. Essentially, the RPT simultaneously models the evolution of risks and times of performance for each of the activities, operations, and components, comprising an EER process under given operational, environmental, and accident conditions. This document gives a detailed description of the methodology utilized in the development of the RPT including the basis for input data, algorithms, and results. Several typical offshore EER configurations for different conditions are analyzed and representative results are presented.

  •  Intermediate drafting of integrated ice and open water Canadian offshore petroleum installations escape, evacuation, and rescue (EER) performance-based standards.
  • Details of the research carried out throughout the EER Research Project since Year 2000 by Bercha were reported in a series of 29 technical reports. These research results have been integrated into the current version of the RPT, and may generally be summarized as the earlier results with enhancements and refinements carried out under Phases I and II, and the Phase III results. The earlier results have now been extended to cover ice and cold regions performance, and although the basic research was carried out under Phases I and II, they have also been incorporated in the Integrated Ice and Open Water RPT. The principal areas of these early results generally fall under human and mechanical performance.

EER R&D projects Phases I, II, and III-B are described under project numbers: P2001, P2101, P2201, P2301, and P2401. Photos below are from all Phases of the project. Click on thumbnails to view enlarged images.

 

Figure 1: RPT opening screen (Phase III-B).

Figure 2: Sample RPT graphical output. Figure 3: Human Factors studies were conducted for RPT input and validation (Phases 1-3). Figure 4: Trials staged at Survival Systems' Skyscape facility in Dartmouth, Nova Scotia in November 2000.
Figure 5: In February of 2001, further trials were staged to assess the effects of winter weather. Figure 6: TEMPSC evacuation trials were conducted using the Galaxy II jack-up rig in Halifax Harbor, in January 2004. Figure 7: Stakeholder information workshops were staged. Figure 8: EER Task Force members worked together as part of the Standards development process. (F. Bercha, C. Brooks, and F. Leafloor shown here during a meeting in Dartmouth, Nova Scotia).
Figure 9: Various evacuation systems were studied for incorporation into the RPT.  The PROD system is an adaptation of the davit-launch system intended to give the lifeboats an impetus away from the platform. The PROD boom is shown here. Figure 10: The PROD system comprises a long, tapered, flexible GRP boom attached at right angles to the offshore structure by a hydraulic hinge. The boom may be a single length one-piece construction or hydraulically articulated to reduce storage space. The boom’s outboard end is connected to the bow of the lifeboat by a fixed-length wire tag line incorporating an automatic release coupling. Figure 11: The Seascape system was analyzed and incorporated into the RPT. Figure 12: The Seascape system consists primarily of a launch structure and a TEMPSC. The launch structure is a hinged arm, which places the TEMPSC on the water surface.
 
Figure 13: ARKTOS system was incorporated into the RPT. Here ARKTOS is seen operating in broken ice.  

Figure 14: Instrumented full-scale lifeboat in ice test results: light ice pack, March 2003, Northumberland Strait.

2004

To Top of Page

P2414

SAKHALIN 2 OFFSHORE SAFETY PLAN

CLIENT: SHELL INTERNATIONAL E&P PROJECTS

DATE: 2004
DESCRIPTION: The reliability of Escape Evacuation and Rescue from offshore facilities is dependent on the time and spatial location, availability, and capability of appropriate EER personnel, procedures, and equipment in the context of environmental, operational, and accident credible configurations associated with a given project. For the offshore component of the Sakhalin Phase 2 LNG project producing almost 2,000 MMscf per day, a key variable that can be controlled is the location and availability of standby vessels in the vicinity of the offshore production and the terminal tanker loading facilities. Using the Bercha Probabilistic EER Software (PEERS) various configurations of safety systems and procedures were simulated for credible accident and environmental conditions including ice conditions to define an envelope of optimal EER configurations giving high reliabilities. 

P2411 INTEGRATED QUANTITATIVE RISK ASSESSMENT OF ONSHORE PIPELINE
CLIENT:  OCENSA Pipelines  DATE: 2004
DESCRIPTION: Bercha Group performed an integrated quantitative risk assessment (QRA) of an existing crude oil pipeline from Cusiana to Cove
ñas. The general goal of the work was to evaluate the integrated risks associated with operating the pipeline throughout representative regions along its route. The work was generally intended to provide risk management information in support of pipeline integrity and safety programs for the pipeline.

P2410

WELL DRILLING
CLIENT:  Law Firm    DATE: 2004
DESCRIPTION: Review of Vaquero sour gas well drilling application on behalf of intervenors.

P2409

 

QUANTITATIVE RISK ASSESSMENT OF THE SHELL CAROLINE INTERCONNECT PIPELINE
CLIENT: Shell Canada Limited    DATE: 2004
DESCRIPTION: Bercha Group performed a risk assessment of the proposed Caroline interconnect pipeline system, with focus on risks from the segment adjacent to section 7-34-7W5. The goal of the work was to analyze and evaluate the risks at the above location associated with operating the proposed interconnect pipeline.

P2408

 

CRUDE OIL PIPELINE INCIDENT, REGULATION, AND PRACTICE REVIEW
CLIENT: Confidential Client    DATE: 2004
DESCRIPTION: A confidential review of information relevant to the location of hydrocarbon pipelines, with specific emphasis on crude oil pipelines, in relation to urban centres of population  was carried out.

P2407

 

ALTERNATIVE OIL SPILL OCCURRENCE ESTIMATORS FOR THE BEAUFORT SEA - FAULT TREE METHOD - Extension to Include Variability of Non-Arctic Effects
CLIENT: U.S. Department of the Interior, Minerals Management Service, Alaska Outer Continental Shelf Region      DATE: 2005
DESCRIPTION: Progress Report #1 was issued March 7, 2005, providing preliminary comprehensive and possibly final results for oil spill occurrence indicator (OSOI) from Monte Carlo calculations for Sale 1 and Sale 2. The method used was a combination of the proposed approaches #1 and #2, essentially utilizing high level distributions from historical data under approach #1, and refining them using approach #2 by adjusting the confidence intervals for causal distribution components, as required for expected conditions. Spill volume distributions within each spill size category were also used.

Figure 1: Winter sea ice on the Beaufort Sea

(image courtesy of NOAA: www.photolib.noaa.gov)

Figure 2: Sunset on the Beaufort

(image courtesy of NOAA: www.photolib.noaa.gov)

P2406 SOUR GAS BLOWOUT IGNITION STUDY
CLIENT: Alberta Energy and Utilities Board (EUB)     DATE: 2004
DESCRIPTION: The requirements for blowouts occurring during the drilling of critical sour gas wells is the ignition of the blowout in order to reduce the risk from H2S through combustion to SO2. However, there is not currently a clear understanding of exactly how long it will take and how reliable it will be to ignite the blowout under real life threatening conditions. Bercha has developed software that takes into account human performance under life threatening conditions in its studies of onshore and offshore emergencies. Under this contract, Bercha has been retained to simulate both the time and the reliability of ignition of sour gas blowouts under different weather and operational and accident conditions. Results will be used as part of the requirements for development of emergency planning zones at critical sour gas wells.
P2405 QUALITATIVE RISK ASSESSMENT OF HALIFAX HARBOUR NATURAL GAS PIPELINE CROSSING OPTIONS
CLIENT: Heritage Gas     DATE: 2004
DESCRIPTION: A risk assessment was carried out in support of Heritage Gas feasiblity studies on construction of a pipeline connecting the Dartmouth side of Halifax Harbour (where natural gas is supplied from the Maritimes and Northeast Pipelines Halifax Lateral), across the Halifax Harbour Narrows to terminate on the Halifax Peninsula within the City of Halifax. Preliminary estimates indicated that an NPS 10 pipeline with an MOP of 275 psig, approximately 1 km in length, would provide the required capacity.
   The Bercha risk assessment focused on two crossing options:
          a. Under-Harbour Crossing using Horizontal Directional Drilling (HDD);
          b. Suspended Bridge Crossing (SBC) using the Macdonald Bridge.
   The general objective of the work was to provide Heritage Gas with a comprehensive but high level and qualitative picture of the risk of exposure that would be encountered both during construction and subsequent pipeline operation for the HDD and the SBC crossing options. The assessment addressed the risks in two distinct phases; namely, the construction phase and the operating phase.

Figure 1: The Angus L. MacDonald Bridge

Figure 2: Bottom view of the suspended span on Dartmouth side.

 P2404 REVIEW OF RISK AND ENVIRONMENTAL IMPACT ASSESSMENTS FOR THE PROPOSED CANNONBALL DEVELOPMENT
CLIENT: Environmental Management Authority, Government of Trinidad and Tobago     DATE: 2004
DESCRIPTION: Bercha International Inc. was retained through Jacques Whitford for the review of documents supporting an application to the Environmental Management Authority of the Government of Trinidad and Tobago. This application was made by British Petroleum for a Certificate of Environmental Clearance (CEC) to develop the oil and gas reserves of the Cannonball Field that is located in the South East Galeota Block, 60km offshore the East Coast of Trinidad. Essentially, the proposed project would contain both offshore and onshore segments. The offshore segment would consist of a proposed wellhead protector platform, and a new 26” pipeline running from the platform to an existing pipeline to an onshore facility. The onshore development would consist of a modification of an existing onshore gas processing facility to increase its capacity. 
     Bercha’s work consisted of reviewing the hazard and consequence assessment, a quantitative risk assessment, and an environmental impact assessment (EIA)), and assessing the validity and appropriateness of the methodology, running check calculations, and making recommendations in relation to the methodology and in relation to the results. The standards applied in the review were those standards normally applied to similar developments in western countries such as Canada and the USA. Generally, the methodology of the onshore facility QRA is compatible with existing standards, while no QRA was done for the offshore segment. The EIA is compatible with standards for preliminary EIA with respect to public and environmental risks. 
P2403 QUANTITATIVE RISK ASSESSMENT OF THE SHELL MOOSE MOUNTAIN TO JUMPING POUND INTERCONNECT PIPELINE
CLIENT: Shell Canada Limited     DATE: 2004
DESCRIPTION: Bercha performed a risk assessment of Shell’s proposed Interconnect Pipeline (IP) system, from the Moose Mountain Compressor Station (MMCS) to the Jumping Pound Gas Plant (JPGP). The goal of the work was to evaluate the risks associated with operating the proposed interconnect pipeline. The work was used to support an EUB application for the construction of the proposed interconnect pipeline and assist in the Shell risk management program development for the proposed system.
     A quantitative risk assessment (QRA) was conducted including consideration of the engineering and operational parameters of the proposed project within the context of the current location. The primary focus of the risk assessment was quantification of acute risks to the public. The key results of the work were estimates of individual and collective risks to the public. Both individual and collective risks were found to be sufficiently low to be considered acceptable.
P2402 RISK ASSESSMENT OF PROPOSED ATCO PIPELINE RELOCATION
CLIENT: ATCO Pipelines, Edmonton, Alberta     DATE: 2004
DESCRIPTION: ATCO Pipelines proposed to relocate an NPS-4 high-pressure sweet natural gas pipeline along a 6-km segment of Highway 40 in the vicinity of the Smoky River Mine. A risk analysis was carried out to support engineering and management decisions and the application to the AEUB for licensing of the project.
     The principal results of the risk assessment were individual specific risk (ISR) transects describing the risks from the proposed pipeline to public and worker personnel in its vicinity. Risk mitigation measures were also investigated qualitatively, and several key risk mitigation measures were recommended.
P2401

ESCAPE, EVACUATION, AND RESCUE (EER) R&D - PHASE III-A
CLIENT: Transportation Development Centre, Transport Canada     DATE: 2004-2005

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
DESCRIPTION: As part of EER Phase III, Bercha will carry out focused R&D leading to the development of performance-based standards and guidelines for the offshore industry.
     The goal of the program is to develop a prioritized and focused R&D program specific to EER, which will lead to the implementation of performance standards for the offshore industry. The Canadian Petroleum Boards have indicated that they will administer the Standards and implement them as Board Guidelines under the Accord Act. The Boards support the continuation of the EER research program and in parallel, the Boards, in co-operation with industry, have initiated a process to review the draft standard by the regulator. The results of this work will provide the rationale for the Regulators to evaluate design standards for EER systems employed in the offshore industry. The performance-based guidelines will address all relevant Human Factors/Ergonomic considerations with respect to the usability of the systems, training and other associated elements.
    Current work which is underway or has been carried out to support the R&D program under Phase III-A  includes the following:

  • Full-scale single point lifeboat evacuation tests utilizing the Galaxy II semi-submersible. The tests were carried out with the full cooperation of Global Santa Fe and participation of the Galaxy II crew in launches and recoveries of lifeboats in a location in Halifax Harbour.
  • Reliability analysis of the proposed Seascape system. The work has consisted of participation in the Seascape launch trials, review of data and reports, and analysis of the reliability of this system, and incorporation into the risk and performance tool, a computer simulator of EER. 
  • Expansion of the EER simulator, the RPT, to incorporate various evacuation systems, as well as specific systems including Seascape and ARKTOS. 
  • Expansion of the RPT to cover EER in ice covered waters for sub-Arctic and Arctic conditions.

EER R&D projects Phases I, II, and III-B are described under project numbers: P2001, P2101, P2201, P2301, and P2501.

 

2003

To Top of Page

P2315 ICETECH-06 INTERNATIONAL CONFERENCE & EXHIBITION
CLIENT: n/a    DATE: 2006
DESCRIPTION:
Dr. Bercha chaired the Organizing Committee for ICETECH 2006, an international conference and exhibition on performance of ships and structures in ice held in Banff, Alberta, Canada, July 16-19, 2006. The theme and subject areas of the conference complemented and derived impetus from contemporary rapid growth of development and associated resurgence of interest in oil and gas exploration and production in Arctic offshore regions. Updated information and conference details were available on the conference website.

P2314

ISO ARCTIC STRUCTURES STANDARD TP2a – RELIABILITY
CLIENT: International Standards Organization    DATE: 2004-2008
DESCRIPTION: Dr. Bercha chairs the ISO Technical Panel 2a drafting this Standard. ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is carried out through ISO technical committees. International Standard TP 2a was prepared by WG8 AS 25B Arctic Structures, Subcommittee TP 2a Reliability. TP2a is part of a series of standards for arctic offshore structures.

Figure 1 - ISO meeting in Beijing, 2004.

Dr. Bercha lectures on reliability.

Figure 2 - ISO meeting in Beijing, 2004.

P2313

WG8 TECHNICAL PANELS ISO 2G8 AS25B ARCTIC STRUCTURES STANDARD - ESCAPE, EVACUATION, AND RESCUE - 8B
CLIENT: International Standards Organization    DATE: 2004-2008
DESCRIPTION: Dr. Bercha is a member of the ISO Technical Panel 8b drafting this Standard. ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is carried out through ISO technical committees. International Standard TP 8b was prepared by WG8 AS 25B Arctic Structures, Subcommittee TP8b Escape, Evacuation, and Rescue. TP8b is part of a series of standards for arctic offshore structures.

Figure 1 - ISO meeting in Paris.

Figure 2 - Panel members.

P2311

RISK RISK RE-ASSESSMENT OF SHELL MOOSE MOUNTAIN MAINLINE BETWEEN MOOSE MOUNTAIN AND WHISKEY CREEK COMPRESSOR STATIONS

CLIENT: Shell Canada Limited    DATE: 2003
DESCRIPTION: Shell Canada Limited (Shell) retained the Bercha Group (Bercha) to perform a risk re-assessment of the Moose Mountain Mainline (MMM) system, from the Moose Mountain Compressor Station (MMCS) (Figure 1) to the Whiskey Creek Compressor Station (WCCS). The goal of the work was to re-evaluate the risks associated with operating the existing pipeline to its full design capacity, beyond the present operational restrictions associated with the existing conditions that act to cap the operating H2S release volumes to values well below Alberta Energy and Utilities Board (EUB) license values. The work was used to support an EUB application for ‘review and variance’ of the supplemental conditions. A quantitative risk assessment (QRA) was conducted of the Moose Mountain Mainline from MMCS to WCCS operating at full capacity. The risk assessment included consideration of the engineering and operational parameters of the proposed project within the context of the current location. The primary focus of the risk assessment was quantification of acute risks to the public. The key results of the work are estimates of individual and collective risks to the public. Both individual and collective risks were found to be sufficiently low to be considered acceptable. A typical line block valve is shown in Figure 2. Figures 3 and 4 show the pipeline right of way.

Figure 1:  View of the Moose Mountain Compressor Station

Figure 2: Typical line block valve - enclosed by chain link fence with posted warning signs

Figure 3: View of Elbow River crossing south of Highway 66 Figure 4: View of pipeline right-of-way northwest of Whiskey Creek

P2310 LINE 96 LEAK DETECTION SYSTEM (LDS) REVIEW
CLIENT: Energy Division, County of Santa Barbara, USA     DATE: 2004
DESCRIPTION: At the request of the County of Santa Barbara Energy Division, Bercha reviewed the Line 96 pipeline integrity program and leak detection system. The review was based on a study and analysis of documentation and data requested by Bercha in September, 2003 and substantially provided by the Line 96 operator between November 4, 2003 and January 14, 2004. 
      It has been noted in the review that leak detection constitutes only a small portion of the pipeline integrity management program. The pipeline integrity management program objective is the prevention of any leaks or ruptures of the pipeline through an integrated set of provisions. Only if all these provisions fail, does leak detection come into action. It has also been noted that small leaks in hydrocarbon pipelines are usually due to internal or external corrosion. On the other hand, ruptures of pipelines are usually a result of defects in the manufacture of the line pipe, construction damage or external impacts such as third party damage or earth movement caused by seismic activity, gravity effects, or soil erosion. 

Figure 1: An aerial view of the area under study.

  Click on image to enlarge

 

P2308 QUATAR FACILITY FREQUENCY ESTIMATES
CLIENT: Jacques Whitford Environmental Limited     DATE: 2003
DESCRIPTION: As part of a facility assessments, Bercha Group conducted frequency estimates for the following:
    - Total Plant Emergency Depressurization to Flare 
    - Emergency Flare Flameout
    - Marine Terminal Fire or Explosion
    - Tanker Fire and Explosion During Loading
P2307 SHELL MOOSE MOUNTAIN MAINLINE RISK RE-ASSESSMENT
CLIENT: Shell Canada Limited     DATE: 2003
DESCRIPTION: Shell Canada Limited (Shell) has retained the Bercha Group (Bercha) to perform a risk re-assessment of the Moose Mountain Mainline (MMM) system, from the Moose Mountain Compressor Station to the Imperial Oil Quirk Creek Gas Plant (QCGP). The goal of the work is to re-evaluate the risks associated with operating the existing pipeline to its full design capacity, beyond the present operational restrictions associated with the existing conditions that act to cap the operating H2S release volumes to values well below Alberta Energy and Utilities Board (EUB) license values. It is anticipated that the work will be used to support an EUB application for ‘review and variance’ of the supplemental conditions.
P2306 GAS RESOURCES & CONCEPTUAL DEVELOPMENT WITHIN MUSKWA-KECHIKA MANAGEMENT AREA, NE BRITISH COLUMBIA
CLIENT: APA Petroleum Engineering     DATE: 2003
DESCRIPTION: Bercha work constituted part of APA’s development application for regulatory assessment and approval for a proposed project within the Muskwa-Kechica Management area. Bercha carried out a detailed risk analysis, studying facility risks to public safety and the environment. Bercha work also generated project-specific public safety and environmental risk mitigation measures, and contributed to the Environmental Impact Statement (EIS). 
View of the Muskwa-Kechika area

 

P2305 HAZARD ANALYSIS FUNDAMENTALS AND APPLICATIONS
CLIENT: Plains Marketing Canada    DATE: 2003
DESCRIPTION: This two-day training course, conducted by Dr. Bercha, focused on hazard analysis fundamentals and applications. The program included technical theory as well as practical experience through use of Hazop software, enriched through guided study including application of Hazop software on select case studies.
P2304 SHELL MOOSE MOUNTAIN RISK RE-ASSESSMENT
CLIENT: Shell Canada Limited     DATE: 2003
DESCRIPTION: Shell Canada Limited (Shell) was evaluating a line looping project for the canyon section of the existing Moose Mountain infield Gas Gathering System. Shell retained the Bercha Group (Bercha) to perform a risk re-assessment of the Moose Mountain Infield Gas Gathering System based on the proposed line looping design basis. The re-assessment considered the impact of the five planned future wells that will be tied into this pipeline system, based on a range of potential well volumes and compositions. The purpose of the risk re-assessment is to provide support for engineering and design functions and to support an Energy and Utilities Board (EUB) energy development application expected to be filed in the near future. The figures below highlight some of the unique aspects of this area.

Figure 1: The project setting is shown in this photo. General terrain types include: valleys, mountains, and steep cliffs. Note the gravel road.

Figure 2: H2S gas naturally seeps out of the ground

Figure 3: H2S is not the only natural hazard! The rock fall potential associated with the steep topography is a potential hazard.

Figure 4: Posted speed limit for portion of access road on which public vehicles are prohibited.

   P2303 BLUE ATLANTIC PROJECT ONSHORE FACILITY RISK ASSESSMENT
CLIENT: Jacques Whitford Environment Limited     DATE: 2003
DESCRIPTION: Bercha carried out a quantitative risk assessment of proposed onshore facilities. Generally, the work was subdivided into two principal risk analytic components as follows: Risk analysis of the pipelines, and a high-level risk analysis of the proposed gas plant.
   Because of their location in a rural populated area, the pipeline risk assessment was to be carried out to a relatively high level of detail and comprehensive quantification. The gas plant, however, was restricted in risk analysis scope to a much more general level, with focus on quantitative risk assessment on major releases with potential offsite damaging effects. 
P2302 SD283 HUMBER PLACE SUBDIVISION - SAFETY ASSESSMENT
CLIENT: TransCanada Pipelines Limited    DATE: 2003
DESCRIPTION: Bercha conducted a review of the risk and safety implications of two alternative subdivision configurations in the vicinity of the subject pipeline. Tasks included information review, conduct of a quantitative accident probability analysis, and generation of conclusions and recommendations on the preferred pipeline route. 
P2301

 ESCAPE, EVACUATION, AND RESCUE (EER) R&D PHASE 3

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
CLIENT: Transportation Development Centre, Transport Canada     DATE: 2003-2004
DESCRIPTION: As part of EER Phase III, Bercha will carry out focused R&D leading to the development of performance-based standards and guidelines for the offshore industry. Work carried out under Phases 1 and 2 (P2101 and P2201) is the foundation for Phase 3.
     The goal of the program is to develop a prioritized and focused R&D program specific to EER, which will lead to the implementation of performance standards for the offshore industry. The Canadian Petroleum Boards have indicated that they will administer the Standards and implement them as Board Guidelines under the Accord Act. The Boards support the continuation of the EER research program and in parallel, the Boards, in co-operation with industry, will initiate a process to review the draft standard by the regulator. The results of this work will provide the rationale for the Regulators to evaluate design standards for EER systems employed in the offshore industry. The performance-based guidelines will address all relevant Human Factors/Ergonomic considerations with respect to the usability of the systems, training and other associated elements.

 

2002

To Top of Page

P2204 STATISTICAL AND NUMERICAL ANALYSIS OF OIL SPILL PERSISTENCE ON OPEN WATER
CLIENT: On Subcontract to: S.L. Ross Environmental Research Ltd., Ottawa, Ontario, Canada DATE: 2003
For: U.S. Department of the Interior, Minerals Management Service, Alaska Outer Continental Shelf Region
DESCRIPTION: This project was carried out and reported by Bercha International Inc. (Bercha), on subcontract to S.L. Ross Environmental Research Limited (SLR) the prime contractor to MMS for the project “Persistence of Crude Oil Spills on Open Water”. The objective of the project is to study the relationships between spill persistence and spill size, and to refine the spill persistence and size relationship in terms of other variables while providing possible predictive relationships such as cumulative distribution functions.
Essentially, the approach utilized by Bercha following receipt of the spill data from SLR, was to inspect the data for possible approaches, identify a series of statistical and numerical methods which could be used to study the relationships among the principal data variables, apply these methods, select the most statistically significant approaches, and further utilize these approaches to generate certain predictive algorithms and results.
P2203 RISK AND COST BENEFIT ANALYSIS OF UTILITY CROSSINGS OF ROADS
CLIENT: Alberta Transportation     DATE: 2002
DESCRIPTION: As part of the decision making process on the possible requirement of casings on municipal utility pipes crossing roadways, a risk and cost benefit analysis input has been identified as a desirable input by Alberta Transportation. Generally, such a risk and cost benefit analysis will take into consideration the costs of initial installation and replacement, durability (lifetime), and unscheduled failures during the lifecycle and associated costs of repairs. All costs will include estimates of associated disruption costs. In relation to unscheduled failures, cost of consequences will include the repair of the utility, repair of possible damage to the roadbed and surface, and the costs of any traffic disruption including temporary traffic management and possible road closure. 
     The general approach to the work was to construct a risk-economic model which gives cost expectations in current dollars at their time of occurrence, and discounts them utilizing a net (of inflation) discount rate to present value.
P2202 PUBLIC SAFETY ASSESSMENT OF TWO ALTERNATE SUBDIVISION CONFIGURATIONS IN THE VICINITY OF TCPL NATURAL GAS TRANSMISSION PIPELINES
CLIENT: TransCanada Pipelines    DATE: 2002
DESCRIPTION: An assessment of the risk and safety implications was carried out for two alternative subdivision configurations in the vicinity of the subject pipeline. The study includes: (1) review of pertinent information and data, (2) conduct of a quantitative accident probability analysis, and (3) Option recommendation based on study results. The two subdivision configuration options considered were: (a) Option 1 - TransCanada ROW located in stand-alone corridor behind housing, and (b) Option 2 - TransCanada ROW located in residential road median in front of housing. The methodology included the use of fault trees.
P2201

ESCAPE, EVACUATION, AND RESCUE (EER) R&D PHASE 2
CLIENT: Transportation Development Centre, Transport Canada     DATE: 2002 - 2003

Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001
DESCRIPTION: Work initiated under P2101 is the foundation for this project. The project goal is to  develop performance-based standards (PBS) for escape, evacuation, and rescue (EER) for Canadian East coast offshore oil and gas installations. Supporting research is an important part of the Standards development process. Bercha provides facilitation, expert personnel, and coordination of a team of offshore safety, human factors, marine operations, and medical experts. The PBS development program is carried out under the guidance of a steering committee, which includes representatives of Transport Canada, Transportation Development Centre, Canada-Nova Scotia Offshore Petroleum Board, Canada-Newfoundland Offshore Petroleum Board, Canadian Association of Petroleum Producers, and other experts. Bercha is responsible for the drafting and editing of the guidelines and organizing their development, stakeholder consultation, and promulgation. Supporting research projects explore human performance under extreme conditions and full-scale performance evaluation of specialized evacuation systems. Since experimental data are not available nor can be generated for performance under life threatening conditions, a compendium of all accident anecdotal data, applicable error rate and performance human factors data, and risk and reliability documentation is assembled, reviewed, and transformed into parameters applicable to the operation of the computerized EER probabilistic simulator. Specific systems targeted for evaluation are the Seascape 2000 proprietary system and the PROD or Preferred Orientation and Deployment lifeboat launch system.

2001

To Top of Page

P2112 CAROLINE WELL TIE-IN QRA
CLIENT: Shell Canada Resources Limited      DATE: 2002
DESCRIPTION: Shell Canada proposes to drill, complete, and produce a well through a gathering system in the Caroline Gas Fields. The work consisted of a quantitative risk assessment of the proposed wellhead facilities and tie-in gathering system for the sour gas. A detailed risk model capable of simulating the variation in causal factors associated with these specific developments was prepared and applied to estimate risks to the public from the proposed project.
P2111 GAS DEMAND COINCIDENCE FACTOR ANALYSIS
CLIENT: ATCO Gas      DATE: 2001-2002
DESCRIPTION: In previous projects, Bercha studied the relationships among residential and commercial natural gas demands within the context of chronological temperature distributions. Various factors relating to peak demands for one hour, 4 hours, and days to average demands over appropriate periods were developed. Utilizing more advanced methodology, data sets provided by ATCO on various demand parameters were reviewed and algorithms for relating hourly and other period demands to average demands for both individual and gate stations were developed. Models were indexed for northern and southern Alberta regions. 
P2110 NEEPAWA PTH 16 ALTERNATIVE ROUTE RISK ASSESSMENT
CLIENT: NDL      DATE: 2001-2002
DESCRIPTION: In order to support planning and management decisions for alternate configurations of Highway #16 within the City of Neepawa, a detailed risk assessment for the existing configuration and alternative configurations was carried out. A risk model was developed based on five-year historical accident data for the existing configuration, and extended to consider two options; namely, a divided highway through town, and the existing undivided highway together with a bypass route. Risks were expressed as accident probabilities of three principal categories; those involving property damage, injuries, and fatalities. Results were provided in tabular and graphical format together with recommendations on risk mitigation. 

Figure 1: General Project Location

Figure 2: View driving on Highway 16 in Neepawa

P2109

PANCANADIAN DEEP PANUKE OFFSHORE AND ONSHORE PIPELINE QUANTITATIVE RISK ANALYSIS
CLIENT: PanCanadian Energy Corporation, Halifax, Nova Scotia      DATE: 2001-2002
DESCRIPTION: PanCanadian Energy Corporation (PanCanadian) is currently planning the production phase of its Deep Panuke Offshore Development Project (Deep Panuke), located offshore, approximately 250 km southeast of Halifax, Nova Scotia. The project will produce and process natural gas offshore. The raw gas, which contains H2S, will be sweetened and processed offshore to a sales gas quality product. Market-ready gas will be delivered through a subsea and onshore natural gas pipeline to the Maritimes and Northeast Pipeline (M&NP) mainline near the SOEI gas plant in Goldboro. PanCanadian’s onshore pipeline is part of an interprovincial natural gas pipeline system, (the M&NP line into which it feeds delivers south to the United States and north to New Brunswick), and therefore falls under the jurisdiction of the National Energy Board of Canada (NEB). The QRA was directed at the principal offshore and onshore pipeline risks associated with different routing alternatives.
 

Figure 1: General project location

Figure 2: Landfall area is characterized by a sparsely treed terrain of medium gradient sloping inland

Figure 3: Typical rocky beach

P2108

RISK ASSESSMENT OF PROPOSED ATCO WEED LAKE PIPELINE
CLIENT: ATCO Pipelines, Edmonton, AB      DATE: 2001
DESCRIPTION: ATCO Pipelines is proposing to construct a 16” high-pressure sweet natural gas pipeline known as the Weed Lake Pipeline (WLP). The pipeline will extend approximately 30 km from a location east of Langdon, Alberta to the proposed AES Power Plant site located near Janet, Alberta. A risk analysis has been carried out to support engineering and management decisions in relation to the proposed project. The risk analysis consisted of the following principal steps: (1)
Data Assimilation, (2) Hazard Scenario Definition, (3) Frequency Analysis, (4) Consequence Analysis, and Risk Assessment. In the definition of hazard scenarios, three representative release sizes were defined, corresponding to a leak, a hole, and rupture in the pipeline. Associated gas release volumes were estimated to form a basis for the subsequent consequence modeling.

P2107 INTERIM PROTOCOLS ON DISPERSION MODELING AND RISK ASSESSMENT
CLIENT: Alberta Energy and Utilities Board      DATE: 2001-2002
DESCRIPTION: In this joint project with M.J. Zelensky of Public Safety and Air Quality Management, the Bercha Group provided specialized expertise on frequency and risk assessment aspects of sour gas safety. The project entailed the development of a protocol applicable uniformly to all sour gas developments in Alberta, including wells, pipelines, and facilities. A sequence of steps involving preliminary risk screening followed by quantitative risk assessment was identified and the primary benchmarks and methodologies for each of the steps were set out in the interim protocol together with technical appendices thereto giving quantitative information on appropriate parameters to be utilized as inputs to the risk assessments.
P2106 RAILROAD RIGHT OF WAY PIPELINE EASEMENT STUDIES
CLIENT: Brown, Winfield, and Cansoneri, Attorneys, Union Pacific     DATE: 2002 - ongoing
DESCRPTION: The work under this project consists primarily of the provision of expert support and testimony by Dr. F.G. Bercha in regard to engineering issues associated with the construction and operation of high-pressure petroleum liquids pipelines within the Union Pacific 1,800-mile railroad right of way. In 1995, when this case was scheduled for trial, Bercha carried out a number of assessments including constructibility and risk analysis studies. This case was reopened in 2002, and supporting evidence and additional testimony by Bercha was provided thereto.
P2105 RISK ASSESSMENT OF PROPOSED CNRL LADYFERN PIPELINE
CLIENT: Cimarron Engineering Limited      DATE: 2001 
DESCRIPTION: 
CNRL is proposing to construct a 12-km long 20-inch outside diameter high-pressure natural gas pipeline adjacent to a road from a producer hub in British Columbia to an existing TCPL transmission pipeline in Alberta. A risk analysis was carried out to support engineering and management decisions in relation to the proposed project. The risk analysis consisted of the following principal steps: data assimilation, hazard scenario definition, frequency analysis, consequence analysis, and risk assessment. 
P2104 RISK ASSESSMENT OF PROPOSED ATCO SEEP EXTENSION
CLIENT: ATCO Pipelines      DATE: 2001 
DESCRIPTION: ATCO Pipelines proposed construction of a 24” high-pressure sweet natural gas pipeline primarily within the existing Edmonton Transportation and Utility Corridor (TUC). A risk analysis was carried out to support engineering and management decisions in relation to the proposed project. The risk analysis consisted of the following principal steps: data assimilation, hazard scenario definition, frequency analysis, consequence analysis, and risk assessment. The results of these steps were combined, together with estimates of likely exposure for typical residential and commercial personnel in the vicinity to produce estimates of risks. Individual risk transects were generated to illustrate the risks from the proposed pipeline to residents and commercial personnel in its vicinity. Finally, levels of ISR for the proposed ATCO SEEP project were compared to other risks to which individuals are commonly exposed. 
P2103 CONCEPT SAFETY EVALUATION FOR THE ALMA DEVELOPMENT PROJECT
CLIENT: Sable Offshore Energy Inc. (SOEI), Halifax, NS     DATE: 2001 
DESCRIPTION: A Concept Safety Evaluation (CSE) of the conceptual design of the Alma development project was carried out. The work included data assimilation, general hazard identification, qualitative and quantitative risk assessment (QRA), review of safety and EER systems, and the generation of conclusions and recommendations. A range of  hazards was considered in the risk assessment. This Concept Safety Evaluation for a development offshore Nova Scotia is regulated by the Nova Scotia Petroleum Directorate, and, as such, is one of the requirements the Directorate sets out as a condition for permits to proceed with such a development. 
       The risks to personnel were the primary focus of the risk evaluation, and both individual and collective risks were evaluated. Individual risks (IR), the actual risks to which individuals with different jobs are exposed, were quantified and compared to Target Levels of Safety (TLS) established for the project. Collective risks (CR) were quantified in terms of Potential Loss of Life (PLL), and assessed within the context of the as low as reasonably practicable (ALARP) principle. The IR TLS’s were as follows: IR below 10-6 is negligible, IR between 10-6 and 10-3 is ALARP, and IR above 10-3 is intolerable. 

Figure 1: Rendering of Alma platform

Figure 2: The study included a review of safety and EER systems. This schematic of the platform shows a possible EER system, the Skyscape (deployed).
P2102 QUANTITATIVE RISK ASSESSMENT OF PROPOSED AES POWER PLANT
CLIENT: AES Calgary ULC      DATE: 2001 
DESCRIPTION: A quantitative risk assessment (QRA) of the proposed AES Calgary Power Plant was conducted.  The risk assessment included consideration of the engineering and operational parameters of the proposed plant within the context of the proposed location parameters. The primary focus of the risk assessment was quantification of acute risks to the offsite public. The scope of the work consisted of the following principal tasks: data acquisition, hazard scenario development, frequency analysis, consequence analysis, risk assessment and acceptability, description of risk mitigation measures, and conclusions and recommendations. The key results of the work are estimates of individual and collective risks to the public.

Figure 1: General location of proposed AES power plant

Figure 2: Site view to the North from Township Road 240

P2101

ESCAPE, EVACUATION, AND RESCUE (EER) R&D PHASE 2
Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001

CLIENT: Transportation Development Centre, Transport Canada     DATE: 2001-2003
DESCRIPTION: Under this project is the development of performance-based standards (PBS) for escape, evacuation, and rescue (EER) for East coast offshore oil and gas installations together with the supporting research. In the first project, the development of the guidelines is carried out, with Bercha providing facilitation, expert personnel, and coordination of a team of offshore safety, human factors, marine operations, and medical experts. The PBS development program is carried out under the guidance of a steering committee comprising Transport Canada, Transportation Development Centre, Canada-Nova Scotia Offshore Petroleum Board, Canada-Newfoundland Offshore Petroleum Board, Canadian Association of Petroleum Producers, and other experts. Bercha is responsible for the drafting and editing of the guidelines and organizing their development, stakeholder consultation, and promulgation. In the second element, there are two supporting research projects, one on human performance under extreme conditions, and the second on the full-scale performance evaluation of specialized evacuation systems. Since experimental data are not available nor can be generated for performance under life threatening conditions, a compendium of all accident anecdotal data, applicable error rate and performance human factors data, and risk and reliability documentation is assembled, reviewed, and transformed into parameters applicable to the operation of the computerized EER probabilistic simulator. In the second subproject, specifically, the Seascape 2000 proprietary system and the PROD or Preferred Orientation and Deployment lifeboat launch system are evaluated.

2000

To Top of Page

P2013 P2013 SAFETY OF NORTHERN AND POLAR SHIPPING (SONAPS) - ESCAPE, EVACUATION, AND RESCUE
CLIENT: National Research Council of Canada and European Union, Brussels     DATE: 2000-2001 
DESCRIPTION: Currently, no adequate standards or technologies exist for the safety of civilian or military ships operating in ice covered waters. Current SOLAS standards do not include requirements for ice reinforcement or ice capability in lifeboats, nor are current launching and evacuation devices suited for Arctic operations. The current project, led by the Bercha Group, addresses the problem of analyzing, developing, and implementing technologies and regulations to assure adequately safe escape, evacuation, and rescue (EER) procedures for a range of common ice conditions from solid ice to broken ice for vessels. The consortium, in addition to the leaders Bercha Group, consist of Scott Polar Research Institute of Cambridge University, Fortun Oil of Finland will provide icebreaker support, the European Union Joint Research Centre from Ispra, Italy, and advisors Umoe Schat-Harding of Oslo, Norway. Currently, the program is in its design phase, with Bercha supported by the National Research Council of Canada, and the other organizations supported by their respective nations. Ultimately, the work will consist of information assimilation, analysis and modeling, conceptual engineering, model testing, and full-scale tests.
P2012 PIPELINE CORRIDORS AND PROPERTY DEVELOPMENT
CLIENT: Banadyga Mitchell Partnership Architects, Regina, SK       DATE: 2000-2001 
DESCRIPTION: An investigation of public risks associated with the development of Wintergreene Estates as proposed adjacent to existing pipeline corridors was carried out. An assessment is underway, involving quantitative risk modeling for various pipeline parameters utilizing Bercha Group proprietary consequence and risk integration models, and review of guidelines relating to development in the vicinity of pipeline systems.
P2011 STUDY OF NATURAL GAS PIPELINE PLACEMENT IN THE RURAL ENVIRONMENT cover
CLIENT: Transportation Association of Canada (TAC)     DATE: 2000-2001 
DESCRIPTION: The placement and location of hydrocarbon pipelines with respect to road geometries and cross sections can have an effect on the safety of the highway system and its users and adjacent residents, as well as operational and economic impacts on highway maintenance, construction, and modification activities. To assess these risks and impacts, the Transportation Association of Canada (TAC) commissioned Bercha Engineering Limited (Bercha) to conduct an in-depth, comprehensive study directed at generating a qualitative and quantitative understanding of the implications of locating pressurized natural gas pipelines in various locations within rural road right-of-ways. The study covered four primary representative road types together with their variations in ADDT, vehicle speed, and cross section, as well as three representative pipeline sizes and pressure categories for three different pipeline locations. The three pipeline locations consisted of one in the shoulder, one below the ditch, one just inside the edge of the right-of-way, and a fourth control location where the pipeline is away from the effects of the roadway. The method for systematically quantifying the risks to the public, considering the effects of the pipeline-roadway synergy, including effects on the pipeline failure rate as well as consequences of possible failure including ignition by vehicles, was developed and applied to each of the 108 generic cases. Both individual and collective risks and their variations for each of the different combinations were evaluated, and discussed. Similarly, economic impacts, including increases in the unit cost of common maintenance, construction, and reconstruction activities for the road operators were also identified. A series of conclusions and recommendations was generated, including definition of compatible and incompatible combinations of pipeline and location installations in terms of safety, cost, and constructibility; various risk and impact mitigation measures to enhance safety and reduce costs; and long-term approaches to optimize the situation. Although previous studies have been done on the use of common utility and transportation corridors, no comprehensive quantitative assessment of risks and economic impacts for representative combinations of road and pipeline characteristics has appeared previously, resulting in a significant volume of new observations and information available from the work reported herein. 
The report can be purchased online at the TAC bookstore.
P2010

ALTERNATIVE OIL SPILL OCCURRENCE ESTIMATORS FOR THE BEAUFORT AND CHUKCHI SEAS
CLIENT: Minerals Management Service, United States Department of the Interior     DATE: 2000-2001 
DESCRIPTION: The project goals are to develop and apply alternative methodologies for the assessment of oil spill rates associated with exploration and production facilities and operations in deeper waters in the Chukchi and Beaufort Seas. The prediction of the reliability (or failure) of systems without history can be approached through a variety of mathematical techniques, the most preferable and accepted being fault trees, and their possible combination with secondary methods such as Monte Carlo simulation and Bayesian statistics. Bercha International Inc. identified an optimal methodology for the prediction of oil spill rates for systems such as those operational or contemplated for the deeper waters of the Beaufort and Chukchi Seas in the Alaskan OCS, and is applying these together with an estimate of their statistical robustness to these systems in order to generate predictions of oil spill rates. The procedure will be applied for each of the principal facility and operation types for exploration and production operations in the study area.

  Click on the thumbnails to view enlarged images.

Figure 1: General Study Area

Figure 2: Work Flow Schematic

P9709 SAFETY CASE FOR THE SABLE OFFSHORE ENERGY PROJECT
CLIENT: Sable Offshore Energy Project       DATE: 1997 - 2001 
DESCRIPTION: The Bercha Group was the prime contractor for the Concept Safety Evaluation and subsequent safety case of the Sable Offshore Energy Project, providing overall project management, conducting the CSE for all onshore facilities, as well as selected segments of the offshore facilities including the Straits of Canso crossing and ship/collision probability assessments associated with the offshore platforms.  Bercha conducted the QRA through a systematic sequence of data assimilation, hazard scenario development, frequency evaluation, consequence assessment, risk analysis, risk acceptability evaluation, risk mitigation measure development, and resultant or residual risk assessment.  For each of the principal facility components, including marine pipeline, gas processing plant, NGL Pipeline, NGL Fractionation Plant, and NGL Products Distribution Terminal.  Subsequent QRAs relating to the project were conducted by Bercha in the area of Statia Marine Terminal risk assessment, fire and explosion consequence analysis, offshore escape evacuation and rescue studies, several HAZOP and HAZ-IDs, and general risk management and safety program development for the safety case associated with the project. 

P2009.02

TR AIR BREATHABILITY FOR THEBAUD
CLIENT: Sable Offshore Energy Project, Halifax, NS     DATE: 2000, August 
DESCRIPTION: A probabilistic analysis of breathable atmosphere in Thebaud TR for various complements was carried out.

P2009.01

THEBAUD MEG SYSTEM WHAT-IF HAZOP 
CLIENT: Sable Offshore Energy Project, Halifax, NS     DATE: 2000, July 
DESCRIPTION: A HAZOP for the Thebaud Monoethylene Glycol (MEG) pipeline injection system was conducted. The methodology used was a knowledge-based What-If HAZOP for two principal nodes comprising the system.
P2008 ATCO METERING STATIONS OFFSITE LIABILITY PROJECT RISK QUANTIFICATION
CLIENT: ATCO Pipelines, Edmonton, AB        DATE: 2000, August 
DESCRIPTION: An assessment of offsite risk for 12 ATCO meter stations was carried out. This was done by combining the consequence jet fire modeling results previously generated by others, with frequencies, damage criteria, and release orientation characteristics to assess risks to personnel, facilities, plant shutdown, and the potential for incident escalation. The key results of the work are the quantified risks and their ranking according to magnitude. Although the risks themselves were insignificant, there was a relatively large range of their expectations among the different facilities, and their relative values may be used as a basis for setting risk management program targets. 
P2007 MONCTON LATERAL RISK ASSESSMENT
CLIENT: Maritimes and  Northeast Pipelines       DATE: 2000 
DESCRIPTION: The proposed Moncton Lateral has been designed as an NPS 8 line from a total length of approximately 12.25 km with isolation valving at each end, connecting from the main line location to the City of Moncton. The route proposes to follow NB Highway 15 with an offset of approximately 8 m from the edge of the highway. The work consisted of the assimilation of data, and semi-quantitative risk assessment associated with the proposed project, culminating in a letter of opinion on risks to the public and project integrity associated with the pipeline as it is proposed.
P2006 REVIEW OF CONSEQUENCE MODELS FOR HYDROCARBON PIPELINES
CLIENT: Canadian Energy and Pipeline Association (CEPA)     DATE: 2000-2001 
DESCRIPTION: The CEPA Pipeline Integrity Working Group project includes a review of consequence models applicable to the modeling of hazard effects resulting from a variety of pipeline failures. Over the last few years, with the vast increase in micro-computing capability together with extensive improvements in software computational, input-output, graphic, and export capabilities, a considerable proliferation of consequence and risk models applicable to the petrochemical industry has taken place. Whereas up to the late-1970s and early-1980s, models were typically in Fortran, operated in a DOS-based environment, with the advent of the Windows environment and powerful computational, programming, and graphic capabilities, a variety of multipurpose and specialized consequence models applicable to assessing hazard effects from pipeline failures have become available. These models vary significantly in their comprehensiveness, user friendliness, and cost, to mention only a few factors. Accordingly, a systematic compilation of data on these models together with a comparative assessment based on industry established standards was carried out.
P2005 QUANTITATIVE RISK ANALYSIS OF MILLENNIUM WEST PIPELINE ADJACENT TO THE 401
CLIENT: St. Clair Pipelines (1996) Limited, Chatham, Ontario       DATE: 2000, June 
DESCRIPTION: A quantitative risk assessment (QRA) of the proposed Millennium West Pipeline section adjacent to the 401 was conducted. The risk assessment included consideration of the engineering, construction, and operational parameters of the pipeline. The primary focus of the risk assessment was quantification of acute risks to the public. A detailed assessment of all factors affecting the risk was made, including inspection of databases to estimate pipeline diameter effects, and an acquisition and analysis of 401 traffic data to assess the possibility of traffic impacts on the pipeline. The work culminated in a detailed final report describing the project, methodology and assumptions, frequency analysis, consequence analysis, risk analysis, possible risk mitigation measures, and conclusions and recommendations.
Figure 1: Segment under study runs parallel to Highway 401, and is indicated by the red line Figure 2: Example of Natural Gas Pipeline Release Dynamics Figure 3: Example of Natural Gas Pipeline Release Dynamics
P2003 EPCOR ROSSDALE POWER PLANT MODIFICATION RISK ANALYSIS
CLIENT:  EPCOR Power Generation Inc., Edmonton, Alberta       DATE: 2000 
DESCRIPTION: A quantitative risk assessment (QRA) of the proposed EPCOR Rossdale Power Plant modification was conducted. The risk assessment included consideration of the engineering, construction, and operational parameters of the existing and modified plant. The primary focus of the risk assessment was quantification of acute risks to the public. 
Figure 1: View of EPCOR Rossdale Power Plant in Edmonton, Alberta, Canada Figure 2:  Example Hazard Footprint Figure 3: Example of Individual Specific Risk Isopleths
P2002 INVESTIGATION OF RISKS TO AND FROM HAZARDOUS FACILITIES ADJACENT TO THE HALIFAX NATURAL GAS LATERAL PIPELINE
CLIENT: Maritimes and Northeast Pipelines       DATE: 2000 
DESCRIPTION: The work, a permit condition mandated by the National Energy Board, involves the assessment of interactive risks between the Halifax Lateral, a high-pressure natural gas pipeline, and adjacent hazardous facilities. These hazardous facilities include liquid propone storage tanks, the Air Liquide processing plant, various crude oil and other chemical storage facilities, and railway facilities including a railway yard and several main line level crossings at locations where the pipeline is located in the railway right-of-way. The work consisted of field and remote data acquisition, consequence modeling of both the pipeline and facility hazards and an assessment of risk levels associated with the interactive risk synergy. 
P2001

ESCAPE, EVACUATION AND RESCUE RESEARCH AND DEVELOPMENT PROJECT
Linked projects:  P2707, P2701, P2601, P2501, P2401, P2301, P2201, P2101, and P2001

CLIENT: Transportation Development Centre       DATE: 2000-2001 
DESCRIPTION: A major multi-disciplinary project on the development of appropriate escape, evacuation, and rescue (EER) systems for east coast bottom founded and floating installations associated with the oil and gas industry off the East Coast of Canada. The work consists of a worldwide literature search, followed by the development of a risk profile tool, an expected value and a Monte Carlo simulator, of each component of and the entire EER process and the integrated process. Consideration of equipment reliability and human factors in the face of accident effects, emergency panic conditions, and the entire spectrum of weather conditions is incorporated. Conclusions will be generated on optimal systems as well as further research priorities for both the development of appraisal methods, technologies, and a regulatory framework for EER provisions in the study area.

R2003

Geomatics

Airborne Laser Topographic Mapping System
National Petroleum Company, Tehran, Iran

R2002

Geomatics

Military SAR and High Resolution Imaging System Development
Ministry of Defence, Sri Lanka
1999

To Top of Page

P9918 EL BIBAN POWER PLANT AND SYSTEMS RELIABILITY AND MAINTAINABILITY ANALYSIS
CLIENT: Centurion International Inc.       DATE: 1999 - 2000 
DESCRIPTION: The El Biban Power Plant and associated equipment for the SEEB Electrical Company in Tunisia, Africa is proposing the development of a power plant and associated power distribution system fueled by an offshore oil field located in the southern Mediterranean Sea just off the coast of Tunisia. The system is a complex consisting of the wellhead platform, subsea pipeline, onshore battery and separation equipment, various interconnecting pipelines, the main power plant and turbine generator, a high-voltage power line to the STEG Substation and various supporting facilities. An integrated downtime risk assessment including both short-duration expected downtime for maintenance and temporary repairs and potential catastrophic or major failure downtime risk was assessed. The work was conducted through the utilization of industry and proprietary data bases for equipment failure rates, interruption times, times to repair, environmental data, and general reliability assessment combined through a probabilistic model capable of generating expected values and their distributions through a Monte Carlo procedure. 

Click on thumbnails to view enlarged images.

Figure 1: General Project Location

Figure 2: Monte Carlo technique

P9917 ASSESSMENT OF REPORT ON RELATIVE CRITICAL SOUR GAS WELL RISK ASSOCIATED WITH DIFFERENT DRILLING TECHNIQUES
CLIENT: Energy and Utilities Board       DATE: 1999 - 2000 
DESCRIPTION: The work involved the detailed review of an assessment of the relative risks associated with the drilling of critical sour gas wells based on overbalanced jointed pipe drilling and underbalanced jointed pipe or coiled tubing drilling. 
P9916 SAINT JOHN LATERAL HYDROELECTRIC DAM RISK ANALYSIS
CLIENT: Maritimes and Northeast Pipeline       DATE: 1999 
DESCRIPTION: The work consisted of the review of risk assessments performed by hydroelectric consultants on the risks to the Saint John natural gas pipeline from dam failures in a system of dams adjacent to its route. 
P9915

ROSSDALE ATCO PIPELINE RISK ASSESSMENT
CLIENT: ATCO Pipelines       DATE: 1999 
DESCRIPTION: The work consisted of a quantitative risk assessment of the proposed Rossdale natural gas pipeline from the Edmonton Ethane Extraction Plant to the Rossdale Power Generating Station. The work included quantitative scenario characterization, consequence modeling, risk assessment, risk mitigation analysis, and the generation of risk-based recommendations for six different potential pipeline routes for the high-pressure 20-inch natural gas pipeline. Included in the work was presentation and defense of results at the Alberta Energy and Utility Board hearing. 

      Risk analysis is an orderly process through which one can assess risk as well as methods of reducing the risk. The appropriate representation of risk for a pipeline is a risk transect showing variation in Individual Risk Intensity and Individual Specific Risk with the distance on either side of the pipeline, as illustrated in Figure 2.

Figure 1: Map showing general location of the study area (yellow) in the City of Edmonton.

Figure 2: Example of Risk Transect for Linear Source.    Click on thumbnail to enlarge

P9914

ASSESSMENT OF RISKS AT ROAD-RAILWAY CROSSINGS
CLIENT: Code Hunter and Associates       DATE: 1999 
DESCRIPTION: The work consisted of the generation of definitive risk measures associated with a variety of road-railway level crossings including passive crossings, flashing light and bell crossings, and gated crossings. The work was based on nation wide statistics collected from the Transportation Safety Board, as well as industry confidential statistics provided by the transportation companies. Results of the work were utilized in support of a litigation associated with a major railway crossing accident. 

Figure 1: Passive crossing marker in rural setting Figure 2: An urban crossing with flashing lights and bells Figure 3: Crossing marker with bells, lights, and gate
P9912 SAINT JOHN LATERAL RISK ASSESSMENT
CLIENT: Maritimes and Northeast Pipeline       DATE: 1999 
DESCRIPTION: The work consisted of a quantitative risk assessment for the portion of the St. John Lateral running within St. John City limits. Included in the risk assessment was the assessment of the pipeline installation on the Reversing Falls Bridge. A detailed quantitative assessment of frequencies, consequences, risks, and mitigations was conducted, and quantitative results were presented in support of the National Energy Board M&NP application for a license. 
P9910 RISK ASSESSMENT OF PROPOSED PEMBINA 11-32 CRITICAL SOUR GAS WELL
CLIENT: Petro-Canada       DATE: 1999 
DESCRIPTION: The work consisted of a detailed quantitative risk assessment for a proposed critical sour gas well drilling operation as well as a conceptual safety assessment of a potential sour gas development which would ensue if the well were successful. The process was conducted through public consultation with a Community Advisory Committee, involving extensive presentation of methodology, results, and interpretations at various stages of the work. Part of the work was carried out by Jacques Whitford Environment, who were responsible for the consequence modeling utilizing the GASCON 2 model, while Bercha was responsible for the balance of the work including scenario definition, frequency assessments, fire and explosion consequence modeling, consequence result integration, risk assessment, risk mitigation evaluation, and the generation of a final report including a detailed description of all aspects of the work. 

P9709

.43

PLATFORM FIREWATER SYSTEM HAZOP
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A full guide word HAZOP was facilitated by Bercha with an SOEP technical expert team for the entire Thebaud platform firewater system following a test failure of the system. The work included a detailed HAZOP of 27 nodes of the system, and resulted in significant engineering and operational recommendations. 

    Click on thumbnails to view larger size.

Figure 1: SOEP Location Map Figure 2: Schematic of SOEP Facilities

P9709

.44

GOLDBORO GAS PLANT COMPRESSION HAZOP
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: Following the detection of a design fault, a full HAZOP of the compression facilities was undertaken, facilitated by Bercha with an SOEP expert team. Due to the complex nature of the system, the high level of expertise of the team, and the shortage of time, the initial mode was addressed using a full guide word HAZOP, but the balance of the nodes and operating modes were optimally accomplished using a knowledge-based HAZID approach. Important technical recommendations significantly improving system reliability were generated from the work. 
P9909 BRISK SOFTWARE DEVELOPMENT
CLIENT: National Research Council      
DATE: 1999 
DESCRIPTION: The work included the development of specialized linear and point source risk analysis software for application to quantitative risk assessments associated with linear facilities such as pipelines and highways and point sources such as gas processing facilities, wellheads, and refineries. More information on BRISK.
P9908 BPC Et Al Turner Valley QRA
CLIENT: Berkley Petroleum Corporation       DATE: 1999 
DESCRIPTION: Quantitative risk assessment of a proposed sour gas delineation well drilling operation in the Turner Valley area was conducted together to a level adequate for presentation at AEUB hearings.
P9907 CHEVRON GAVIOTA OIL AND GAS PROCESSING FACILITY – CONDITION R1 REVIEW PROCESS
CLIENT: County of Santa Barbara Energy Division       DATE: 1999 
DESCRIPTION: A semi-qualitative risk assessment of the risks mitigation provisions and conditions associated with a variety (over 12) scenarios for the future of the Chevron Gaviota oil and gas processing facility. 
P9906 P9906 PRODUCTION WELL SSSV RISK ASSESSMENT
CLIENT: Berkley Petroleum Inc.       DATE: 1999 
DESCRIPTION: An assessment of the risks associated with production well blowouts with and without a SubSurface Safety Valve (SSSV) was conducted.  The work included a frequency evaluation of blowouts, and a detailed probabilistic cost-benefit analysis associated with the operation of the SSSV and alternative risk mitigation measures. 
P9905 REVIEW OF INCIDENT REPORTS ASSOCIATED WITH WILD ROSE PIPE CORRIDOR
CLIENT: Kiewit Industrial Canada Ltd.       DATE: 1999 
DESCRIPTION: A qualitative assessment within the context of the Suncor rating system was conducted to provide perspective based on fundamental risk assessment principles on a variety of incidents associated with activities of Kiewit on the Suncor construction site. 
P9904 RISK ASSESSMENT OF ALTERNATIVE ROAD ROUTES TO LETHBRIDGE WATER TREATMENT PLANT
CLIENT: Reid Crowther & Partners Ltd.       DATE: 1999 
DESCRIPTION: A risk assessment for alternative routings for hazardous chemical carrying trucks accessing the Lethbridge Water Treatment Plant was conducted.  The assessment included evaluation of low and high-speed intersections, park roads, urban roads, and a turnoff ramp from Whoop-Up road. 
P9903 ST. CLAIR PIPELINE QRA
CLIENT: Union Gas       DATE: 1999 
DESCRIPTION: A quantitative risk assessment for a section of the natural gas line adjacent to a primary highway was set out and initiated. 

P9902

.2

HERMOSA BEACH QUANTITATIVE RISK ASSESSMENT
CLIENT: City of Hermosa Beach       DATE: 1999 
DESCRIPTION: Risk analysis and engineering consulting services were provided to the City of Hermosa Beach to assess, recommend mitigation, and quantify and define risks associated with the proposed MacPherson Oil project in the City of Hermosa Beach. 

P9709

.42

FRACTIONATION PLANT HAZID & CE
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A precommissioning and commissioning procedure HAZID and Critical Examination of the procedure was conducted including facilitation of the HAZID with an expert team, scribing of results utilizing proprietary software, and the publication of a comprehensive final report describing the results and recommendations from the work. 

P9709

.41

ONSHORE 26” GAS AND NGL PIPELINE HAZOP
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A detailed HAZOP for the NGL pipeline was facilitated, scribed, and reported by Bercha together with the HAZOP sessions conducted together with a team of experts from SOEP and owner companies. 

P9709

.40

ENGINEERING CHANGE NOTICE (ECN) HAZOP
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A high-level knowledge based HAZOP procedure was facilitated, scribed, and reported by Bercha to ascertain that document and action integrity be maintained for the Engineering Change Notices generated and associated follow up procedures. 

P9709

.39

NORTH TRIUMPH HAZID/CE
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A precommissioning and commissioning procedure HAZID and Critical Examination of the procedure was conducted including facilitation of the HAZID with an expert team, scribing of results utilizing proprietary software, and the publication of a comprehensive final report describing the results and recommendations from the work. 

P9709

.38

GOLDBORO GAS PLANT HAZID/CE
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A precommissioning and commissioning procedure HAZID and Critical Examination of the procedure was conducted including facilitation of the HAZID with an expert team, scribing of results utilizing proprietary software, and the publication of a comprehensive final report describing the results and recommendations from the work.

P9709

.37

STRAIT OF CANSO PIPELINE CROSSING RISK ASSESSMENT
CLIENT: Sable Offshore Energy Project       DATE: 1999 
DESCRIPTION: A risk assessment associated with two principal types of crossing installations for the common trench pipelines across the Strait of Canso were investigated. The first installation involved a combination of bottom-lay, trenching, and successive layer armoring. The second alternative involved directional drilling. The risk assessment considered both risks associated with the construction and installation process as well as operational risks. Both risks directly attributable to the crossing installation and its operation and intrinsic risks (such as internal corrosion) independent of the installation method were assessed and quantified. Conclusions and recommendations were made.

  Click on images to enlarge

Figure 1: Location map showing pipeline routing. Figure 2: Pipeline Armour - Typical Cross Section Central Zone. Figure 3: Pipeline Armour - Typical Cross Section Shore Approaches.

R9902

Geomatics

Airborne SAR Surveillance System Design and Specification
For Ministry of Defence, Sri Lanka, with Kelowna Flightcraft Ltd.

P9901

.2

DYNEGY ABOVE GRADE SOUR GAS FACILITIES FAILURE FREQUENCIES
CLIENT: Jacques Whitford Environmental      DATE: 1999 
DESCRIPTION: The work consisted of a detailed assessment of the failure frequencies and their distribution among different failure types for a variety of sour gas wellhead and block valve installations in Southern Alberta Dynegy facilities. 

P9901

.1

HVP PIPELINE FAILURE FREQUENCIES
CLIENT: Jacques Whitford Environmental       DATE: 1999 
DESCRIPTION: High vapor pressure pipeline failure frequencies were assessed commencing with an Alberta Energy Utilities Board database, together with assessment according to pipeline risk factors associated with a specific pipeline operation under consideration.
1998

To Top of Page

P9809 TRANSGAS CONSEQUENCE ANALYSIS – REGINA AREA NATURAL GAS PIPELINES
CLIENT: TransGas       DATE: 1998 
DESCRIPTION A consequence assessment for a designated set of segments of the TransGas pipeline network in the vicinity of the City of Regina was carried out. The principal technical steps of the consequence assessment included hazard scenario definition and quantitative characterization. Consequence evolution and consequence modeling, consequence potential assessment and detailed consequence analysis. A total of 11 segments was studies in detail including the above steps, while a detailed consequence assessment giving estimates of both casualties and property damage based on a worst-case situation was also conducted. Conclusions and recommendations were presented. 
P9808 RISK FROM MAGNETIC LEVITATION TRAINS TO ADJACENT BURIED STEEL PIPELINES
CLIENT: Donahue and Company Inc., U.S.A.       DATE: 1998 
DESCRIPTION: High-level consulting work directed at defining the risks associated with the operation of Mag-Lev trains parallel to pipelines.  Specifically, effects of the electromagnetic pulsations associated with the train operation on induced currents in the steel pipeline were considered together with mitigation measures. 
     Following a literature survey of current magnetic levitation (Mag-Lev) train systems approaching the operational stage, a preliminary assessment of risks associated with the operation of Mag-Lev trains had a potential to induce substantial currents in adjoining steel pipelines and mitigation measures would have to be taken in order to avoid significant pipeline damage. 
P9807 POINT TUPPER LATERAL QUANTITATIVE RISK ASSESSMENT
CLIENT: Maritimes & Northeast Pipelines       DATE: 1998 
DESCRIPTION: A comprehensive Quantitative Risk Assessment for risks to public, workers, environment, and project integrity for the common trench installation of an NGS8 natural gas pipeline and an NPS8 natural gas liquids pipeline from Goldboro to Point Tupper on Cape Breton Island in Nova Scotia was conducted. The work consisted of the modification of pipeline statistics to account for the synergy between the two pipelines constructed and operated in a common trench, and the impact of the resultant possible failure modes on public safety, the environment, and project integrity. Included in the work was the filing of a comprehensive report with the National Energy Board and attendance as an expert witness on behalf of Maritimes and Northeast Pipelines at National Energy Board hearings in Antigonish, Nova Scotia in November, 1998.
P9806 QUANTITATIVE RISK ASSESSMENT OF CENTRA NATURAL GAS PIPELINE FROM SQUAMISH TO WHISTLER, BC 
CLIENT: Centra Gas Limited       DATE: 1998 
DESCRIPTION: A semi-qualitative risk assessment for the variation in risk between a pipeline installed in a right-of-way adjacent to a secondary highway in a mountainous region were conducted.  Preliminary conclusions and recommendations were presented including an assessment of the principal risk causal factors associated with the unique aspects of the proposed installation. 
P9805 DEVELOPMENT OF END-TO-END RISK ANALYSIS SOFTWARE
CLIENT: National Research Council of Canada       DATE: 1998 
DESCRIPTION: The further development of the Bercha Risk (BRISK) was partially funded by NRC over a four month period in 1998. The work covered by the funding consisted of the expansion of the risk consequence evolution modeling using event trees which automatically couple into risk analysis spreadsheets with inputs of the principal probabilistic parameters and output risk transects giving individual specific risk and individual risk along an axis perpendicular to the centre-line of the pipeline. 
P9804 HERMOSA BEACH PROJECT INTEGRATED RISK ASSESSMENT
CLIENT: City of Hermosa Beach, CA, USA       DATE: 1998 
DESCRIPTION: Integrated assessment of the proposed MacPherson Project to be located in a medium density residential and commercial area in Hermosa Beach was conducted. The work consisted of site visits, review of existing reports and data, a detailed QRA, attendance at stakeholders meetings, and attendance at public council meetings. The integrated risk assessment was carreid out in considerable detail to consider both non-homongenous population densities in space and time, and a variety of weather conditions in order to assess both representative and worst-case situations. Integrated risk measures, including individual risk, risk matrices, and risk spectra were generated in support of the work and presented at the city’s Council meeting September 1998. 

R9803

Geomatics

Airborne Laser Route Topographic Mapping System Design and Specification
ATRAK Energy Limited
P9803 ENGINEERING FEASIBILITY STUDIES FOR HYDROCARBON PRODUCTS PIPELINE EASEMENTS
CLIENT: Brown, Winfield, and Cansoneri, Union Pacific Railway        DATE: 1998 
DESCRIPTION: Assessment of the value of pipeline easements on Union Pacific Railroad right-of-ways was conducted with special emphasis on construction, engineering, and risk issues.  Constructibility of pipelines in the vicinity of the existing pipelines was quantitatively assessed.  Engineering issues involving the operability and design requirements of pipelines operated in close proximity ranging from common trench installations to separations in excess of 20’ were considered and quantitatively and qualitatively described to support the pipeline easement value assessment. 

R9802

Geomatics

Detailed Design and Specification of Aerial Multi-Purpose Surveillance System for Malaysian Government
Mofaz Group, Kuala Lumpur, Malaysia
P9801 TORCH PT. PEDERNALES GAS PIPELINE QUANTITATIVE RISK ASSESSMENT
CLIENT: Santa Barbara County       DATE: 1998 
DESCRIPTION: An end-to-end quantitative risk assessment was carried out for the new operating configuration of the Torch Pt. Pedernales gas pipeline. Meteorological site conditions were analysed and included in the assessment. This new operating configuration consisted of an increase of allowable H2S concentration from 4,000 to 8,000 ppm. Both absolute value risk spectra and transects and incremental risk spectra and transects for the increase in H2S concentration were generated. A formal final report was generated together with support for public hearings in the County.

P9709

.33

SABLE OFFSHORE ENERGY PROJECT HAZOP FACILITATION
CLIENT: Sable Offshore Energy Project       DATE: 1998 
DESCRIPTION: A series of HAZOP sessions was facilitiated by the Bercha Group including organization of HAZOP team, facilitation of HAZOP services, and HAZOP reporting. Specifically, HAZOP was carried out for the specific onshore facilities including the gas processing facility at Goldboro and the NGL fractionation plant at Point Tupper.
1997

To Top of Page

P9709 SAFETY CASE FOR THE SABLE OFFSHORE ENERGY PROJECT
CLIENT: Sable Offshore Energy Project       DATE: 1997 - 2001 
DESCRIPTION: The Bercha Group was the prime contractor for the Concept Safety Evaluation of the Sable Offshore Energy Project, providing overall project management, conducting the CSE for all onshore facilities, as well as selected segments of the offshore facilities including the Straits of Canso crossing and ship/collision probability assessments associated with the offshore platforms.  Bercha conducted the onshore analysis through a systematic sequence of data assimilation, hazard scenario development, frequency evaluation, consequence assessment, risk analysis, risk acceptability evaluation, risk mitigation measure development, and resultant or residual risk assessment.  For each of the principal facility components, including marine pipeline, gas processing plant, NGL Pipeline, NGL Fractionation Plant, and NGL Products Distribution Terminal.  Subsequent QRAs relating to the project were conducted by Bercha in the area of Statia Marine Terminal risk assessment, fire and explosion consequence analysis, offshore escape evacuation and rescue studies, and general risk management and safety program development for the safety case associated with the project. 

R9709

Geomatics

Preliminary Design of Maritime Airborne Surveillance Program for Malaysian Exclusive Economic Zone
Malaysian Department of the Environment
P9704 ECONOMIC RISK ANALYSIS OF SCHEDULE IMPLICATIONS FOR THE ALPINE DEVELOPMENT PROJECT
CLIENT: Tri-Ocean Engineering       DATE: 1997 
DESCRIPTION: A Monte Carlo simulation of the project time flow, together with the principal uncertainties associated with a schedule 1 analysis for a development project on the Alaskan North Slope was carried out.  Principal areas of uncertainty included those associated with labour requirements and rates on the North Slope, success of the marine transport of principal equipment items around Point Barrow (given a 3 to 6 week ice-free window), logistics and operations on the tundra given a variability of weather windows for their conduct, and the integration of all these activities into a total project schedule risk evaluation.

R9703

Geomatics

Interpretation of ERS-1 Images
Amoco Worldwide Engineering and Construction Ltd.
Houston, TX, USA

R9701

Geomatics

SPOT Image Mapping, N.W.T.
Ranger Oil Ltd.
Calgary, Alberta, Canada
1996

To Top of Page

P9657 DEVELOPMENT OF COMMERCIAL HYDROCARBON EXPLORATION OPPORTUNITIES IN MALAYSIA
CLIENT: CS Resources Limited      DATE: 1996
DESCRIPTION: A high level program for the identification and development of commercial opportunities for the special
capabilities of CS Resources International within the Malaysian jurisdiction. The work involved the gathering of reserve,
development, and production data for the Malaya, Baram Delta, and Sabah Basins and the analysis of selected clusters of fields within the context of certain operational and economical parameters capable of being optimally met by the client company. Work included the design of a detailed presentation for international audiences showing the highlights of the Malaysian Development program envisioned.
P9655 ANALYSIS OF RISKS ASSOCIATED WITH OIL PRODUCTS PIPELINE ON RAIL ROAD RIGHT OF WAY
CLIENT: Southern Pacific Transportation Company, California & Delaware, U.S.A.       DATE: 1996 
DESCRIPTION: The provision of expert consultant services in the area of pipeline engineering, right of way management, and easement evaluation related to the operation of an existing oil product pipeline located on a rail road right of way within the city of Los Angeles. 
P9653

ESTABLISHMENT OF PUBLIC SAFETY RISK THRESHOLDS FOR LAND USE PLANNING PURPOSES
CLIENT: County of Santa Barbara, California, U.S.A.       DATE: 1996 
DESCRIPTION: Work is part of an ongoing program directed at the enhancement of safety through the incorporation of risk based guidelines in land use planning regulations.   The work included the development of an objected method for assessing societal risk in the vicinity of hazardous facilities.  The method developed was based on casualty and fatality risk spectra and included the development of a detailed procedure for implementing the guidelines.  Technical review, sample calculations, and attendance at information sessions and hearings constituted the work. 
  

Click on images to enlarge

Figure 1: Point Arguello area, County of Santa Barbara

Figure 2: Risk Mitigation Measures Applicable to Gas Pipelines

P9650 RISK IMPLICATIONS OF HIGH POWER TRANSMISSION LINES IN PROXIMITY OF PETROLEUM PIPELINES OF RAIL ROAD RIGHT OF WAYS 
CLIENT: Southern Pacific Transportation Company, California, U.S.A.       DATE: 1996 
DESCRIPTION: Vision of expert consulting services and development of expert testimony relating to the risks and costs associated with the operation of electrical transmission lines on a rail road right of way within limits of the city of Los Angeles.
P9616 RECOMMENDATION OF PUBLIC SAFETY THRESHOLDS FOR LAND USE PLANNING IN THE VICINITY OF HAZARDOUS FACILITIES
CLIENT: County of Santa Barbara       DATE: 1996 
DESCRIPTION: The work consisted of the development of feasible safety thresholds for public protection in the vicinity of hazardous facilities such as refineries, pipelines, and petrochemical plants.  Work consisted of a review of existing criteria both nationally and internationally, with synthesis of the most relevant individual and collective risk criteria for inclusion in the CSV planning guidelines.

R9604

Geomatics

Digitizing and Conversion of Survey and Map Coordinates
Chauvco Resources Ltd.
Calgary, Alberta, Canada
P9603 INSTITUTION OF TEST METHODS FOR ICE RUBBLE
CLIENT: K.R. Croasdale and Associates Limited       DATE: 1996
DESCRIPTION: The Development of a detailed program for the evaluation of global crushing strength of ice rubble formations including rubble piles, unconsolidated, semi consolidated, and consolidated ridges, and pile ups in the vicinity of offshore structures. Methods included the design of test procedures for the evaluation of pressure and global forces utilizing existing test facilities at the institute of ice dynamics and in private laboratories. 

R9602

Geomatics

ERS-1 and Landsat Thematic Mapper Image Mapping
Komex International Inc.
Calgary, Alberta, Canada

R9601

Geomatics

Conversion Of Digital Elevation Data Formats
Canadian Occidental Petroleum Ltd.
Calgary, Alberta, Canada
1995

To Top of Page

P9524 CONSTRUCTION ENGINEERING FOR HIGH PRESSURE GAS PIPELINE
CLIENT: Hill, Farrrer, and Burill        DATE: 1995
DESCRIPTION: Analysis of effects of high pressure gas pipeline in vicinity of commuter train track, including evaluation of
interaction of pipeline and railway in a track twinning scenario. Work was conducted through Hill and Company on behalf of the Orange County Transportation Association, for a location in Orange County, California, near Newport Beach.
P9515 NEW TAWAU AIRPORT QRA
CLIENT: KTA (Sarawak) Sdn. Bhd.      DATE: 1995 
DESCRIPTION: Risk to public and worker safety associated with the airborne operations of a proposed new airport for the Tawau region, located in east Sabah, Malaysia, was conducted.  An investigation of the probability of aircraft crashes in the vicinity of the proposed airport was conducted utilizing the U.K. Health and Safety Executive algorithms for crash-rate distributions in the vicinity of runway thresholds together with ICAO Crash Statistics.  In addition, a study was conducted for the fuel depot, including fuel storage at the airport site, loading and unloading, and transportation by tanker vehicles by road to the fuel depot.  The work included accident frequency, spatial and temporal distribution assessment for the projected traffic patterns up to the year 2020, consequence quantification in terms of worker and public casualties, and risk mitigation recommendations.  A draft emergency response plan was also prepared for consideration in the airport operating plan.  Risk mitigation recommendations included the development of buffer zones over specified areas beyond each of the runway thresholds and land use control in adjacent areas. 

P9513

.2

RISK ANALYSIS OF EXISTING SANTA FE PIPELINE WITHIN SOUTHERN PACIFIC TRANSPORTATION COMPANY EASEMENT
CLIENT: Brobeck, Phleger & Harrison      DATE: 1995 
DESCRIPTION: An analysis of the risks to public and worker safety associated with the operation of a high pressure gasoline pipeline located in the Southern Pacific Right-of-way, extending from California to El Paso, Texas, was conducted.  Particular consideration was given to the distinctive effects on risk of the location of the pipeline within the Right-of-way in close proximity to a frequently used freight and passenger train railway track.  Risk indices were computed for urban and rural conditions, and an integrated risk for the pipeline operation was assessed based on actual conditions along the Right-of-way.  The work served as support for expert testimony by Dr. F.G. Bercha in litigation between Southern Pacific Transportation Company and Santa Fe Pipeline Company, in support of Southern Pacific's position. 

P9513

.1

PIPELINE AND FIBRE OPTIC CABLE ENGINEERING, CONSTRUCTABILITY AND RISK ANALYSIS
CLIENT: Brobeck, Phleger, and Harrison       DATE: 1993--
DESCRIPTION: The project consisted of the preparation and presentation of expert testimony on the general problem of
construction of new pipeline or fibre optic cable facilities in the vicinity of an existing high pressure oil products line located on a railway right-of-way. Studies consisted of the development of construction scenarios for locations at different separation distances from the pipeline and associated cost and risk evaluations. Unit costs were developed for the construction of new pipeline facilities at spacings ranging from approximately 1 foot tangent to tangent, to 10 feet and more from the existing pipeline. Worker and public safety risks associated with the close proximity construction scenarios were also conducted, based on construction in urban and rural conditions surrounding the right-of-way. In addition the engineering model of a possible equivalent pipeline system form California to Texas was developed and a replication cost estimate was generated. The work consisted of analysis computer modelling, engineering calculations, site visits at facilities locations in California (Richmond, Benicia, Martinez Merced), cost estimating reporting, depositions, and presentation of export testimony.

Figure 1: Proximity construction scenario for new pipeline installation in the vicinity of an existing high-pressure oil products line located on a railway right-of-way.

   Click on thumbnail to enlarge 

Figure 2: Typical plow method installation for fibre optic cable

P9510 JOINT INDUSTRY PROJECT ON RIDGE AND RUBBLE LOADS
CLIENT: K.R. Croasdale and Associates Limited     DATE: 1995-96
DESCRIPTION: A joint-government industry project to develop new models for the prediction of ridge and rubble loads on fixed offshore structures. The project has included two sets of ice tank experiments of ridges being indented by structures, the development of an in-situ test method for the strength of rubble, and the detailed investigation of two new methods for the determination of ridge load, which both involve the full time analysis of the indentation of the ridge. The project is also examining the assumption of Mohr-Coulomb behavior of the ice rubble, the separation of the strength into components of cohesion and friction, and the physical characteristics of the ice motion against and around the structure.
P9509 QUANTITATIVE RISK ANALYSIS OF A PROPOSED COAL HANDLING AND STOCKPILE STORAGE OPERATION AT TANJUNG MANIS FOR INCLUSION IN AN ENVIRONMENTAL IMPACT ASSESSMENT
CLIENT: U.P. Environmental Services Sdn. Bhd., Kuching, Sarawak, Malaysia       DATE: 1995 
DESCRIPTION: An integrated public safety, worker safety, and environmental risk analysis was conducted for the proposed coal handling and storage operation located on the Batangiajanj River at Tanjung Manis in Northern Sarawak, Malaysia.  The principal acute risks studies were those associated with the stockpile spontaneous combustion and potential dust explosions contained in a sea-going freighter hold during coal unloading.  The work consisted of the assessment of initiating event frequencies, potential consequence analysis, and recommendation of risk mitigation measures.
P9504 ICE LOAD CONCENSUS
CLIENT: K.R. Croasdale and Associates Limited     DATE: 1995-96
DESCRIPTION: A joint-government industry project to achieve consensus on ice load levels for a number of typical ice load
events. Thirteen groups were asked to predict the load for five individual load cases, for a single event occurrence, and for the 1% exceedance load. Bercha have been involved in the analysis of the predictions including comparisons between the predicted loads, the methods used, the databases used, and the estimates of the effects of dynamics, and the 1% exceedance loads. A workshop between the participants and the predictors will be held to possibly arrive at some consensus regarding the methods to be used, the interpretation of databases, and hence arrive at some narrowing of the range of predictions.
  Geomatics Projects (1995)
R9515 Licensing, Support and Training For ERMapper Software
Various Clients
R9514 Conversion Of ERS-1 Image Formats
Komex International Inc.
Calgary, Alberta, Canada
R9511 Digitising and Conversion Of Map Coordinates
Chauvco Resources Ltd.
Calgary, Alberta, Canada
R9507 SPOT Image Mapping, Algeria
PetroCanada Resources Ltd.
Calgary, Alberta, Canada
R9503 Feasibility Study For Remote Sensing Environmental Monitoring Of Pipeline Rights-of-Way
National Energy Board
Calgary, Alberta, Canada
R9502 Conversion Of Survey and Map Data For Input To ARGUS Mapping System
Chauvco Resources Ltd.
Calgary, Alberta, Canada
1994

  To Top of Page

P9428 NON-LINEAR FINITE ELEMENT ANALYSIS 42" PIPE TEES
CLIENT: Foothills Pipe Lines Ltd     DATE: 1994-95
DESCRIPTION: Elastic-Plastic analyses of two 42" pipe tees in a metering station were analysed for changes in the operating
conditions of the natural gas pipeline, of which they formed part. Preliminary pipe stress analyses had suggested that these tees were over-stressed under certain conditions, but the margin was sufficiently narrow to warrant more detailed analysis of the tees. Finite element models of the pipe tees were developed using the commercial finite element package, Ansys. Models were developed using two forms of three-dimensional solid iso-parametric elements, and iso-parametric shell elements. Analyses were carried out for the previous operating conditions, and the proposed new operating conditions. The non-linear behaviour used was for material non-linearity only, using a von Mises yield criterion for the steel in the pipes. The results were input into a fatigue calculation using some estimated load cycles for the extreme load conditions. It was found that, on a single load cycle, some non-linearity did occur in the crotch of the tee, but that it was of very limited extent, Strain hardening was sufficient to limit stresses in subsequent cycles to the elastic range. It was concluded that the overall reliability of the pipe Tees was not compromised by the revised operating conditions.

P9426

NON-LINEAR FINITE ELEMENT ANALYSIS OF ICE RIDGE KEEL BEHAVIOUR
CLIENT: Public Works Canada      DATE: 1994-95
DESCRIPTION: Non-linear finite element analyses of the interaction between the rubble in an ice ridge keel and a cylindrical
structure were undertaken. Analyses were carried out in both two- and three-dimensions. The rubble was modelled as a Mohr- Coulomb material with and without dilatancy. The structure was modelled as a rigid body, and the interface as either having, or not having, friction. The analysis was carried out assuming that there existed a continuous solid ice layer on the surface. Two forms of analysis were carried out: one in which the ice layer was made to fail against a sloping structure, and the other, in three dimensions, in which the ice layer was assumed to remain intact, but in which the ice rubble could slide along the underside of the ice layer. The rubble's natural buoyancy was modelled by appropriate mass density and accelerations. Each analysis was carried out by stepping the far-field of the ridge towards the structure in preset displacement steps, which the program automatically reduced as required to achieve equilibrium and convergence of the solution. Considerable difficulties were encountered with the curved interface between the rubble and the cylindrical structure, and particularly where the rubble left the structure at the back. Very large strains caused the interface nodes to oscillate between target elements, causing convergence problems. For extreme ridges (20 meters deep) maximum loads of the order of 17 MN were obtained.

P9408

P9418

DYNAMIC ANALYSIS AND MODIFICATION OF PUMP MOTOR BASE
CLIENT: Federated Pipelines Limited      DATE: 1994
DESCRIPTION: A pump used in an oil pipeline, was experiencing unacceptable vibrations at speeds within its normal operating speed range. Field analysis of the pump and pump base had concluded that the steel base which supported the pump motor may have been causing the vibrations. A detailed dynamic finite element analysis of the pump base was undertaken to establish the frequencies and mode shapes of the fundamental vibration mode of the base. Although there were modes which would have caused the forms of deformation being observed in the rotor, the frequencies of these nodes were higher than the observed frequencies by an order of magnitude. Structural reinforcement of the base was designed to limit the amplitudes of these vibrations. It was finally concluded that the vibrations were being caused by the rotor itself.

P9406

P9315

NORTHUMBERLAND STRAIT CROSSING ICE ENGINEERING
CLIENT: Public Works Canada       DATE: 1993-1996
DESCRIPTION: A multi-year standing order for the provision of specialist ice engineering services in support of the design, construction, and operation of the Northumberland Strait Crossing. This crossing is the longest bridge in the world traversing a body of water which is ice covered for a significant portion of each year. It will be approximately 13 kilometres long, connecting the island province of Prince Edward Island to the Canadian main land. Northumberland Strait is ice covered from early January until the third week in April, although the date of last ice can vary over a period of two months. Ice is a significant design parameter of the bridge and its operation, both in terms of ice effects on the bridge and effects of the bridge on the ice climatology. Bercha was first retained as a consultant to Public Works Canada in 1986, and since that time has been evaluating all aspects of the ice-bridge interaction including ice forces on the bridge, effect of ice jams, environmental effect of changes in ice climatology, including microclimactic effects and effects on local fisheries. Under the present standing order, the work underway emphasized ice engineering aspects, particularly the effect of the bridge on ice jams and the adequacy and reliability of the ice design parameters, including pressures and global loads, used in the final bridge design.
   Click on thumbnails to enlarge                 

Figure 1: View of Confederation Bridge Figure 2: On the Confederation Bridge Figure 3: Location Map Figure 4: Pier-Ice Interaction
Figure 5: Field Data Acquisition - SAR Image Figure 6: Field Data Acquisition - Ice floe motion schematic Figure 7: Field Data Acquisition - SAR Map Figure 9: Structural form elements
Figure 8: Bridge section profile Figure 10: Bridge piers in ice - during construction phase
9403 BRICK DURABILITY ALGORITHM
CLIENT: Public Works Canada      DATE: 1994
DESCRIPTION: A computer algorithm developed to assess the reliability of brickwork in buildings was tested. The algorithm required a considerable amount of environmental data for typical urban locations in Canada, and the merging of this data to obtain frequencies of specific combinations of environmental conditions. Once the data base had been obtained and analysed, the algorithm was tested for a number of typical locations to derive the frequency of failure as defined by spalling of the brickwork.
  Geomatics Projects (1994)
R9425 SPOT Multispectral Image Deskewing
University of Calgary
Calgary, Alberta, Canada
R9424 Landsat TM and SPOT Panchromatic Image Mapping for Libya
PanCanadian Petroleum Ltd.
Calgary, Alberta, Canada
R9423 Airborne SAR Image Processing and Mapping
United Nations Development Programme
Georgetown, Guyana
R9422 Kara Sea Russian SLAR Image Processing and Ice Interpretation
Amoco Petroleum Co. Ltd.
Tulsa, Oklahoma, USA
R9420 SPOT Panchromatic Image Mapping of Northern B.C.
Norcen Resources Ltd.
Calgary, Alberta, Canada
R9419 Landsat Thematic Mapper and SPOT Panchromatic Image Mapping of Turkey
Chauvco Resources Ltd.
Calgary, Alberta, Canada
R9418 SPOT Panchromatic Image Mapping of the Slave Lake Area, Alberta
Morgan Hydrocarbons
Calgary, Alberta, Canada
R9414 Image Processing of Northumberland Strait Crossing
Geomatic Technologies Inc.
St. John's, Newfoundland
R9413 Russian SLAR and ERS-1 Image Processing of Pechora Sea, Russia
Amoco Petroleum Ltd.
Tulsa, Oklahoma, USA
R9412 Landsat TM Image Mapping of the Chinchaga Area, Alberta
Amoco Canada Petroleum Co. Ltd.
Calgary, Alberta, Canada
R9411 SPOT Panchromatic Image Mapping of Nacunen, Argentina
Norcen Resources Ltd.
Calgary, Alberta, Canada
R9407 Remote Sensing for Geology Workshop
Canadian Sedimentary and Petroleum Geologists Conference
Calgary, Alberta, Canada
R9404 Landsat TM Image Mapping and Geological Interpretation of Blackfoot, Montana
Numac Petroleum Ltd.
Calgary, Alberta, Canada
R9402 Landsat MSS Image Mapping of Lacombe County, Alberta
LR Olson and Associated, Ltd.
Rocky Mountain House, Alberta, Canada
1993

To Top of Page

P9329 RISK ANALYSIS OF A GAS TRANSMISSION PIPELINE TRAVERSING A HIGHWAY CORRIDOR
CLIENT: Canadian Western Natural Gas Company Limited       DATE: 1993 
DESCRIPTION: CWNG was proposing to utilize portions of an existing highway Right-of-way for the installation of a new gas transmission pipeline loop and in reviewing this proposal, Alberta Transportation and Utilities questioned what risks the pipeline may pose to the public using the highway.  A public risk analysis was carried out to measure of both the probability of a pipeline system failure and leak occurring and the resulting consequences for the public traveling along the highway.  Concerns about the pipeline location included the following risk impacts: 
        a) pipeline construction and operations impact on highway facilities and vehicle traffic, 
        b) vehicle accidents impact on pipeline operations, 
        c) highway maintenance activities impact on pipeline operations, 
        d) potential highway widening activities impact on pipeline operations, and 
        e) other hazards such as falling rocks impact on pipeline operations. 
The risk analysis included identification of potential hazards, quantification of pipeline leak frequencies, calculation of leak consequences, evaluation of risk mitigation measures, estimation of public risk exposure, and comparison with existing traffic accident risks. 

P9324

SPECIFICATION OF STRUCTURAL CHARACTERISTICS OF MOBILE ARCTIC CAISSON, MOLIKPAQ
CLIENT: B. Wright and Associates      DATE: 1993-94
DESCRIPTION: A 1/30 scale model of the Molikpaq was to be developed at the National Research Council of Canada ice tank in Ottawa. In order to construct the model and to provide the appropriate instrumentation to permit comparisons between the ice tank results, and the full scale data acquired during the structure's deployments in the Beaufort Sea, NRCC contracted to have the necessary structural characteristics provided. As Bercha had a long history of developing analytical models of the Molikpaq, they were asked to provide this information. The information included the overall stiffness of the structural system as it was deployed at Amauligak I-65, the relative stiffnesses of the individual structural components, and the primary load paths, the mass distribution for the same deployment, and the dynamic characteristics of the system. The specification of the dynamic characteristics included the natural frequencies of the complete system, and major components, and the level of damping of the various components. This latter parameter included the estimation of damping with and without the presence of ice.

P9321

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE STACK
CLIENT: Monenco      DATE: 1993
DESCRIPTION: TransAlta Utilities, the owner and operator of the Wabamun electrical generating plant, and the Alberta
Department of the Environment, wished to create additional access holes in the largest of reinforced concrete stacks in order to permit sampling of exhaust gases. Prior to the creation of the holes, they wished confirmation that the holes would not critically alter the integrity of the stacks. To do this, a non-linear finite element analysis of a portion of the concrete stack was carried out under the effects of extreme operating conditions, and the design wind pressures. Analyses were carried out both for the current arrangement of holes and with the proposed additional holes. The analysis was carried out with a special purpose non-linear finite element program which accounted for the tension-weak characteristics of concrete, the presence of reinforcing steel, and the time dependent behavior of concrete. The results indicated that the proposed additional holes did not compromise the reliability of the stack.

P9310

.01

ICE LOAD SENSITIVITY FOR EAST COAST STRUCTURES
CLIENT: National Energy Board      DATE: 1993
DESCRIPTION: Sensitivity of specified environmental ice design loads in accordance with CSA S471. Carried out simulations of ice forces from impacts by: icebergs, bergy-bits, and sea ice with fixed and floating production structures in the Hibernia area of the Grand Banks. The analyses incorporated energy decay algorithms for the impact analysis with appropriate energy sinks depending on the particular interaction. For fixed structures these included crushing of ice as well as elastic structure response, and iceberg rotation and translation. For floating structures, local elastic and permanent deformation of the structure was included. Data on iceberg frequencies, dimensions, shape, and velocities were obtained from various sources to provide the most reliable distributions. For bergy-bits, recent reported data by Crocker was used for the size distribution. Sensitivities were carried out on ice strength, iceberg velocity, and iceberg arrival rate. Of these, the first was found to have the most effect on the specified design forces, while the second, velocity, was found to have the least effect.

P9303

.01

RISK BASED SITING AND PERMITTING OF HAZARDOUS ENERGY RELATED FACILITIES
CLIENT: County of Santa Barbara, California Utilities Commission       DATE: 1993-1994 
DESCRIPTION: The objective of this study was to develop the basis for a policy on application of risk analysis in the siting and permitting of hazardous energy related facilities in the County of Santa Barbara.  General classes of facilities considered explicitly were oil and gas, automotive fuel, and electrical facilities.  Only acute or immediate risks as opposed to chronic or long term risks were included in the scope of work.
Fundamentals of risk analysis were reviewed to establish a basis and terminology for the balance of the work. The general procedures for implementing risk considerations in the planning process were then described. 
Results from a review of the general types of hazardous energy related facilities which exist or may exist in the near future in the County of Santa Barbara included: 
        a) classification of the facilities into oil and gas, automotive fuel, and electrical categories and sub-categories such 
            as gasoline, compressed natural gas, methanol, and ethanol stations in the automotive fuel category. 
        b) a brief description of the relative hazardousness of the principal substances handled by the facilities. 
        c) a general description and summary of the hazards associated with each type of facility. 
        d) a review of both US and worldwide guidelines and regulations designed to manage acute risks to the public. 
        e) a discussion of the role of risk analysis in the context of the planning processes for the County of Santa Barbara. 
        f) specific recommendations for the implementation of the results from this work. 

P9302

.01

PUBLIC SAFETY AND ENVIRONMENTAL RISK ANALYSIS TRAINING PROGRAM
CLIENT: Latin American Association of Oil Companies (ARPELL)       DATE: 1993 
DESCRIPTION: A formal two day seminar was delivered by two Bercha principals to forty professional and management level trainees from nine South American and Central American countries including Costa Rica, Venezuela, Columbia, Ecuador, Trinidad, Tobago, Argentina and Peru.  The objective was to provide practical insights for the application of risk analysis to safety and environmental concerns within the petroleum industry.  This introductory seminar involved preparation and distribution of a bi-lingual (Spanish and English) 180 page training work book, presentation of lectures in Spanish and English (with simultaneous translation), and leading specialized workshops involving the analysis of practical problems from each participant's workplace.  Certificates of participation were issued to each trainee. 

P9302

.02

RISK ANALYSIS APPLICATIONS FOR THE OIL AND GAS INDUSTRY
CLIENT: Latin American Association of Oil Companies (ARPELL)       DATE: 1993 
DESCRIPTION: A three day seminar on risk analysis applications within the context of the oil and gas industry was conducted.  The seminar was given by two senior Bercha risk experts and consisted of a meld of lectures and workshops.  The presentation was accompanied by simultaneous translation for the attendees who numbered in excess of 40.  All phases of the risk analysis process from initiating risk or hazard to detailed consequence analysis were reviewed and each trainee participated in the formulation and conduct of a risk analysis project in an area of professional interest.  Certification and performance evaluation was conducted at the conclusion of the seminar. 

P9301 DEVELOPMENT OF RISK MANAGEMENT PROGRAM FOR THE ENGINEERING, CONSTRUCTION, AND OPERATION OF HIGH PRESSURE SOUR GAS LINE
CLIENT: Shell Canada Limited       DATE: 1993 
DESCRIPTION: A risk management program was developed for the operation of a high-pressure sour gas pipeline from a gathering system to a sour gas treatment plant.  All potential pipeline system failure scenarios such as thermal stress, differential settlement, third party effects, and other scenarios identified in previous studies by the Bercha Group were considered in this program.  These scenarios were prioritized through the assignment of risk indices, considering probability and consequence severity, and a series of mitigative measures were developed and evaluated quantitatively.  A specific risk management plan detailing the mitigative measures, technical responsibilities, and implementation procedures was then developed to address each principal risk scenario.  Bercha risk analysts and engineers advised the Shell project and operating personnel in conjunction with the Shell engineering partner responsible for design and construction.
  Geomatics Projects (1993)
R9332 SPOT Panchromatic Image Mapping of Lago Pellegrini Este, Argentina
Chauvco Resources Ltd.
Calgary, Alberta, Canada
R9331 SPOT Panchromatic Image Processing and Mapping of the Covunco Block, Argentina
Alberta Energy Company
Calgary, Alberta, Canada
R9323 Landsat MSS Image Processing and Mosaicking of Benin
ABACAN
Calgary, Alberta, Canada
R9322 SPOT Panchromatic Image Processing and Mapping of Neuquen, Argentina
Chauvco Resources Ltd.
Calgary, Alberta, Canada
R9318

Seminar on Remote Sensing Project Management and Applications for Environmental Monitoring
Caracas, Venezuela                                           Date completed: November 1993
Canadian International Development Agency

DESCRIPTION:  The Bercha Group formulated curriculum, produced a manual, and conducted a technical seminar in Caracas, Venezuela as part of a Public Safety and Environmental Risk Management seminar series conducted in association with Geoexpert C.A. of Caracas. The three-day technical seminar covered a wide range of subjects, including: an introduction to remote sensing, general examples for environmental monitoring, sensor systems and airborne acquisition platforms, satellite sensors, manual interpretation, digital image processing, methods of map production from remotely sensed imagery, and applications to environmental monitoring. Although conducted in English, simultaneous translation occurred during the seminar, and seminar materials were available in both Spanish (Figure 1) and English.
The general objectives of this seminar were to provide managers, administrators, and other decision makers with a general understanding of the principals and applications of remote sensing with emphasis on environmental monitoring so that they can apply this understanding of remote sensing and its capabilities in support of management decisions. To achieve this general objective, the seminar focused on facilitating participants' understanding in the 10 key areas shown in Figure 2. An environmental monitoring example from the seminar is shown in Figure 3. 

SERIE DE SEMINARIOS

SEGURIDAD PUBLICA Y MANEJO DEL RIESGO AMBIENTAL

CARACAS, VENEZUELA

 

SEMINARIO TECNICO 1B

APLICACIONES DE LA PERCEPCION REMOTA

AL MONITOREO AMBIENTAL

 

 

POR

 

BERCHA GROUP

CALGARY, CANADA

 

EN ASOCIACION CON

GEOEXPERT C.A.

CARACAS, VENEZUELA

 

NOVIEMBRE 1993

The Seminar's Specific Objectives
1. Understanding of the applications of remote sensing for environmental monitoring.
2. An assessment of the capabilities of remote sensing to determine whether or not it can assist in specific problems or applications in environmental monitoring.
3. Ability to plan a remote sensing project for a specific application.
4. Familiarity with standard remote sensing technology.
5. Understanding the differences among remote sensing, GIS, and classical photogrammetry.
6. an appreciation of the types, formats, precisions, and accuracies of information recorded by remote sensing systems.
7. General understanding of what satellite systems are available for different applications.
8. Familiarity with the principles of manual and digital image interpretation to obtain information from remote sensing images.
9. An understanding of digital processing techniques which are available for the extraction of information from remote sensing data.
10. An understanding of the important parameters such as cost, schedule, regional as opposed to detailed coverage, resolution, precision, and accuracy considered in the development of an application-specific remote sensing program.

Figure 1: Spanish cover

Figure 2: Ten Key Areas

Figure 3: Seminar example

Click on image for enlarged view

R9317 Vegetation Change Detection using LANDSAT MSS Imagery in the Cold Lake Region, Alberta
Amoco Canada Petroleum Co. Ltd.
Calgary, Alberta, Canada
R9309 Thematic Mapper Image Processing, Tunisia
Wascana Resources Limited
R9308 Satellite Data and SAR Processing for Mineras Estratos
E. Valero, Venezuela
R9305 Satellite Data and SAR Processing for Marawani Concession
Organization Cisneros, Venezuela
1992

To Top of Page

P9231.02 REGIONAL ICE MODEL THERMODYNAMICS
CLIENT: Atmospheric Environment Services, Ice Centre      DATE: 1992
DESCRIPTION: The study consisted of a review of existing forms of the regional ice model utilized for the prediction of short
and long term ice motion and ice climatology, followed by the development of specific algorithms for improving modelling accuracy and efficiency. Model performance was evaluated through comparison to a series of real time ice observations obtained from airborne radar and satellite data.
P9231.01 INVESTIGATION OF ICE GROWTH AND DECAY SCHEMES FOR REGIONAL ICE
CLIENT: Ice Centre - Environment Canada       DATE: 1992-3
DESCRIPTION: Scientific assessment of existing ice growth and decay models for possible incorporation in the Multi-Category Regional Ice Model (MCRIM). A team of experts was assembled to review possible approaches and recommend models which could be included in MCRIM without altering the basic dynamic formulation and which would permit MCRIM to execute in an operational mode. The experts recommended a two-part approach: the Semtner zero-layer model for basic ice cover and a wave-driven model for edge effects. Algorithms were developed and coded into MCRIM as new subroutines which could be executed as options. All of the new coding was fully documented. A comprehensive series of sensitivity analyses were carried out to illustrate the effect of the new modelling on ice growth and decay at the top and bottom surfaces of the ice/snow slab. The necessary additional data to permit MCRIM to run with the new algorithms was obtained. Further, new data for the verification periods (see PA 9114) was also obtained. The verification procedures for the two periods for the east coast were run in a series of analyses to illustrate the effect of the new algorithms on ice edge movement and ice concentrations.
P9228 COMMISSIONING AND START UP OF OPERATIONS READINESS REVIEW FOR A WORLD SCALE SOUR GAS PRODUCTION SYSTEM AND TREATMENT PLANT
CLIENT: Shell Canada Limited       DATE: 1992 
DESCRIPTION: An operational readiness review was carried out on a world scale sour gas production and treatment facility at Caroline to identify any critical deficiencies or concerns in the commissioning and start up plans.  The review team included risk consultants in addition to independent operating personnel with instrumentation, operations, and maintenance experience.  A broad cross section of the facilities operating team, including contractors, was interviewed to identify significant concerns, which may delay or endanger a smooth start up.  The review was restricted to commissioning and start up and did not address steady state operations nor did it involve a detailed inspection of equipment.  The review did provide an assessment of the management systems and implementation program performance. 
Results from the operational readiness review included identification of the principal concerns among the following categories:  (a) Organization, (b) Safety Procedures, (c) Equipment Readiness, (d) Training, and (e) Emergency Response.  Following the identification of concerns, conclusions were presented which prioritized the concerns so they could be effectively addressed.  In addition, any exceptional aspects of the commissioning and start up plans as presently being implemented were highlighted. 
P9227 PUBLIC AND ENVIRONMENTAL RISK ANALYSIS OF A REFINED OIL PRODUCTS PIPELINE
CLIENT: Interprovincial Pipe Line Inc.       DATE: 1993 
DESCRIPTION: The risk analysis methods employed in this project included a systems failure modes, risk and criticality analysis and an example worksheet from this task is attached. 
P9219 RESEARCH AND DEVELOPMENT OF FINITE ELEMENT SOFTWARE
CLIENT: National Research Council of Canada       DATE: 1992
DESCRIPTION: A series of Finite Element Software programs which were originally developed as research tools were modified and augmented to allow their execution on IBM PC compatible computers. These improvements included, in some cases, whole-scale modifications to the original code to eliminate dated Fortran usage and introduce memory management processes prevalent in desktop PC's. Other improvements included the introduction of pre- and post-processors which simplified the preparation of data input, and the interpretation of output results. These were set up to run under a Windows environment. Finally, the ability to output results graphically was also added to the programs. This latter improvement required the creation of complex data management routines to permit user control of the results being output, and the orientation and scale of the plot.
P9215 SYSTEMS FAILURE MODE ANALYSIS OF OIL PRODUCTION AND PIPELINE FACILITIES
CLIENT: Husky Oil       DATE: 1992 
DESCRIPTION: A systems failure mode analysis (SMFA) was carried out on two major oil pipeline terminals in order to identify potential significant failure modes associated with both the equipment and its operation, and to rank the associated risks.  Following reviews of the engineering documentation and interviews with site personnel, each terminal facility was subdivided into individual systems and associated subsystems for the SFMA.  The objective of the system breakdown used was to provide the framework for identifying significant failure modes, which would impact throughput, cost, safety, or the environment.  A systems approach was taken in order to screen high priority risks with an optimum level of manpower resources. 
P9213 LEAK HAZARD ANALYSIS OF A HIGHER PRESSURE NATURAL GAS PIPELINE
CLIENT: Westcoast Energy Inc.      DATE: 1992 
DESCRIPTION: During construction of the new natural gas pipeline from the mainland to Vancouver Island, British Columbia, there was concern regarding potential hazards from an industrial facility located near the pipeline right of way.  A study was therefore carried out to estimate the hazards resulting from any leak from the pipeline.  Safety and property hazard zones, as defined by delayed or immediate ignition of potential leaks, were estimated using consequence models.  Plume dispersion calculations were performed using the GASCON 2 model, while the effects on people from a fire were estimated based on the approach developed by Considine and Grint and using the probit equation of Eisenberg.  The effects of thermal radiation on surrounding property were also evaluated using empirical data. 
P9212 PROBABILISTIC ANALYSIS OF RESIDENTIAL AND INDUSTRIAL DEMAND FOR NATURAL GAS FROM A REGIONAL DISTRIBUTION SYSTEM
CLIENT: Northwestern Utilities Limited       DATE: 1992 
DESCRIPTION: The client contracts for natural gas supply from a variety of producers, then provides an integrated delivery system of natural gas to many communities in the north central region of the province of Alberta.  The majority of natural gas is supplied on an as and when required basis, however a number of large industrial users contract to specific delivery amounts. In order to design the gas delivery system including capacity requirements for underground storage, the client must estimate the maximum total gas demand, which consists of both temperature dependent and temperature independent components.  Current designs were developed from worst case scenarios and the objective of the present study was to convert such criteria to a probabilistic basis more representative of the factors affecting the delivery system.  An in-depth probabilistic analysis was therefore carried out on the extensive environmental data bases and gas consumption records for the client delivery system.  The detailed design criteria for both the temperature dependent and temperature independent components of the gas load were evaluated and compared to the total gas load on the system. 
P9208

SIMULATION AND MODELING SERVICES FOR NORTHUMBERLAND STRAIT PROJECT
CLIENT: Delcan/Stone and Webster Joint Venture     DATE: 1992-3
DESCRIPTION: Continued work on the Jamming and Break-Up modelling for the Northumberland Strait Crossing Project as part of the Ice Committee's mandate to determine the impact of any bridge on the ice regime. Subsequently examined the winning design (SCI) and sensitivities of the jamming and break-up models to winter severity. Consulted with SCI, C-Core, and independent engineer on the ice forces on the piers, providing expert advice on the ice conditions in the Strait as well as executing independent calculations of ice forces for Public Works Canada. Initial calculations were on the original 8m cylindrical design and subsequent calculations on various forms of conical design. Work involved refinement of three-dimensional conical failure mechanisms for ice sheets with rubble and ridge keels. Provided advice to Public Works Canada on the reports from C-Core to SCI and the reports by the independent engineer, Buckland and Taylor.

P9206 COMPARISON OF RISKS BETWEEN ALTERNATIVE RAIL AND TRUCK MODES FOR TRANSPORTING LPGs
CLIENT: Shell Canada Limited       DATE: 1992 
DESCRIPTION: An investigation was carried out on the risk impacts from changing the mode of liquid petroleum gas (LPG) transportation in Eastern Canada from a rail operation to a truck operation.  Of particular interest was the potential relative change in risk exposure corresponding to a change in transportation mode. The work was commissioned in phases, beginning with a top level analysis for management and continuing with a more detailed analysis providing a site and operation specific comparison.  The preliminary risk analysis provided a management overview of historical rail and truck accident and release frequencies, in addition to the distribution of consequence hazard zones associated with an LPG release.  Frequency analyses for both modes of transportation were based on analyses of published generic data for the transportation industry in Canada and North America.  The consequence analysis involved both a statistical analysis of historical accident consequences and modeling of potential spill consequences in order to determine the associated hazard distances. The second phase of work continued with a more detailed analysis of site specific accident data and public exposure data. 
P9205

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE STACK
CLIENT: Monenco      DATE: 1992
DESCRIPTION: TransAlta Utilities, the owner and operator of the Wabamun electrical generating plant, and the Alberta Department of the Environment, wished to create additional access holes in the two of reinforced concrete stacks in order to permit sampling of exhaust gases. Prior to the creation of the holes, they wished confirmation that the holes would not critically alter the integrity of the stacks. To do this, a non-linear finite element analysis of a portion of the concrete stack was carried out under the effects of extreme operating conditions, and the design wind pressures. Analyses were carried out both for the current arrangement of holes and with the proposed additional holes. The analysis was carried out with a special purpose non-linear finite element program which accounted for the tension-weak characteristics of concrete, the presence of reinforcing steel, and the time dependent behaviour of concrete. The results indicated that the proposed additional holes did not compromise the reliability of the stacks.

P9203 PUBLIC RISK FROM SINKHOLES ON ARCTIC HIGHWAYS
CLIENT: Government of Northwest Territories, Department of Transportation       DATE: 1992 
DESCRIPTION: Due to a concern about the potential for vehicular accidents resulting from the occurrence of sudden sinkholes in the driving lanes of the Dempster Highway, a risk analysis was carried out and the results were quantitatively compared with those normally occurring risks associated with highway travel. 
      Results included an assessment of culvert and sinkhole data based on highway surveys and an evaluation of traffic and accident data based on additional highway surveys.  Risk estimates were presented in the form of annual frequencies for an accident, an injury, or a fatality occurring as a result of an interaction with a sinkhole in one of three portions of the Dempster Highway and in one of four months of the year in which sinkholes occur.  Quantified risk estimates were then compared with other risks from common experience and a sensitivity analysis of the risk estimates was presented. 
P9202 EVALUATION OF DIFFERENCES BETWEEN TWO GAS PLANT AND PIPELINE RISK ANALYSES
CLIENT: County of Santa Barbara, California Gas Commission       DATE: 1992 
DESCRIPTION: The County of Santa Barbara is involved in the approval process of industry applications for the development and operation of oil and gas facilities.  In this capacity it received at different times two reports of risk analyses carried out for the same gas plant and pipeline facilities which appeared to present conflicting results.  The objective of this evaluation was to identify the basis for the conflicting results and present recommendations for the County to resolve this matter. The large volume of documentation in each report was distilled into simplified difference tables for each of the six process steps previously identified.  Each of the differences identified were evaluated in terms of assumptions, methods, and results then the more appropriate analysis applications were discussed based on the available information.  Finally, recommendations were presented to the County for consideration in its review of an industry application and potential conditions for approval. 
P9201 ANALYSIS OF GAS RELEASE FREQUENCIES FOR PRODUCTION WELLS
CLIENT: AMOCO U.S.A.       DATE: 1992 
DESCRIPTION: The objective of the work was to estimate the potential for a release or blowout of sweet gas from any of the over 3,000 client production wells in the San Juan Basin in New Mexico.  The hazard of concern was a release or blowout of sweet gas, which ignites with the thermal radiation or flame impact reaching the nearby public.  Although most production wells were in remote locations where the public would rarely be exposed, a number of well sites were in urban areas with increased public exposure. The frequency analysis included estimation of the frequency of production well releases according to release characteristics, evaluation of causal factors, and assessment of the frequency estimate sensitivity to these causal factors. Results from the frequency analysis were integrated with a client consequence analysis in order to assess the public risk and determine optimal operational policies to mitigate these risks. 
  Geomatics Projects (1992)
R9234 SPOT Panchromatic Image Mapping
PanCanadian Petroleum Limited
R9232 Oil Field Mapping with High Resolution SPOT Imagery
Chauvco Resources Limited
R9229 Development of Algorithms for the Interpretation of Digital Radar Imagery
National Research Council of Canada
R9223 Satellite Data of SAR Processing for Rio Icabaru Concession
H.I. Gibelli, Venezuela
R9222 SPOT Image Mapping, Alliance, Alberta
PanCanadian Petroleum Limited
R9220 Rio Icabaru SAR Survey
Golden Star Resources
R9217 Digital Analysis of Multiband Data for Sumatra
Asamera and Gulf Canada
R9216 Stereo SPOT DEM Development and Processing
Canadian Occidental Petroleum Limited
R9211 Analysis of TM Data for Sumatra Geology
Bow Valley Resources
R9207 Detection of Oil Seepage Using Satellite Data
Canadian Occidental Petroleum Limited
R9204 Identification of Burrowing Owl Habitat Risk in Southern Alberta Using Landsat TM Imagery: A Preliminary Investigation with GIS
Canadian Wildlife Service
1991

To Top of Page

P9119 PRE-COMMISSIONING OPERATIONS AUDIT AND OFFSITE PRELIMINARY RISK ASSESSMENT FOR A LARGE-SCALE CRUDE OIL UPGRADING FACILITY
CLIENT: Husky Oil Bi-Provincial Upgrader, Saskatchewan       DATE: 1992 
DESCRIPTION: Husky Oil Operations Ltd. as Project Manager of the Joint Venture partners including Husky Oil, the Canadian Alberta and Saskatchewan Governments, and HRI constructed the Bi-Provincial Upgrader (BPU) to produce synthetic crude and asphalt from a 65%/35% volumetric blend of Lloydminster and Cold Lake heavy oils, respectively.  The study was carried out as part of the Pre-Commissioning activities for the BPU and included an operational audit and an offsite risk assessment. A Pre-Commissioning Audit of the BPU was carried out to ensure operational readiness for commissioning and operating the facilities through the identification of critical deficiencies or concerns in the start-up plans.  An independent audit team interviewed a broad cross-section of the BPU staff in order to identify problem areas, potential difficulties, or concerns, which had the potential to delay or endanger a smooth start-up of the facilities.  Results included a list of prioritized concerns in the areas of organization, procedures/safety, equipment readiness, training, emergency response and unit specific concerns.  These results provided a basis for pro-active measures to increase the potential for a successful start-up of a very large and complex process facility. 
P9117 DEVELOPMENT OF A POLICY PAPER ON GAS PIPELINE SAFETY
CLIENT: County of Santa Barbara, California Gas Commission       DATE: 1991 
DESCRIPTION: The County of Santa Barbara commissioned the development of a policy paper as part of its continuing efforts as a regulatory agency overseeing gas pipeline safety.  The objectives of the paper were to provide a perspective on safety of pipelines by identifying the principal causes of pipeline accidents, reviewing potential consequences, investigating and reporting on various ways of introducing the likelihood of ruptures and consequences, and recommending an optimal safety enhancement pipeline strategy for the County based on a risk analysis approach. A systematic approach to the evaluation of pipeline safety was made through the use of risk analysis.  Practical measures to enhance pipeline safety were developed for both accident prevention and consequence mitigation.  Measures were identified in the general areas of information management, regulations, land use, training and education, right-of-way management, emergency response, and pipeline operations including design, construction, and operation.  A pipeline safety strategy was recommended based on a systematic approach to risk reduction. 
P9107 EMERGENCY PLANNING FOR CAROLINE SOUR GAS PRODUCTION WELLS, GATHERING PIPELINES AND GAS PLANT, SAFETY CASE APPROACH
CLIENT: Shell Canada Limited        DATE: 1991 
DESCRIPTION: In a previous project, PA8820, an emergency risk analysis was carried out on the facilities required to develop a large sour gas reservoir in the Caroline Area of Alberta.  Results included a quantification of risks to provide a basis for implementing optimum risk mitigation measures.  Included in these measures were impacts associated with emergency response procedures.  Consequence scenarios numerically modeled included toxic gas, fire, explosion, pool fire, BLEVE, and fireballs. The present project involved integrating the previous risk analysis work into the planning and implementation of emergency response procedures.  Impacts for risk mitigation associated with alternative emergency response procedures were analyzed.  Then, results were prepared in order to assist in the meaningful communication of risk and the effects of applying emergency response procedures.  Explaining the plans for emergency response was a critical objective of the client because of the significant public involvement.  In addition, industry technical, operational, and maintenance personnel and regulatory authorities were also involved in the process of understanding risk and the implications for emergency response plans.
P9102 LEAK DETECTION IMPACTS ON PIPELINE RISKS
CLIENT: Shell Canada Limited       DATE: 1991 
DESCRIPTION: A previous project, PA8314, involved the analysis of public risks and consequences of a release of sour gas from a field gathering system.  Risks were quantified based on the potential for a full pipeline rupture and the assumption that within 5 minutes of such a rupture, the pipeline pressure sensors would activate line block valves and thereby limit the size of potential release.  In a more recent project, PA8820, numerical modeling of pipeline releases included the pressure transient time history, which determines pressure sensor detection capabilities.  Calculations proved that leak sizes smaller than a full pipeline rupture may result in greater hazards due to the time response of pipeline pressure sensor detection.  The effects of such a scenario on the risks previously estimated for the PA8314 project were assessed in the present project. Results included an analysis of the relative individual risk between a full pipeline rupture and various pipeline leaks. The impact of leak detection directly affected the individual risk results.
  Geomatics Projects (1991)
R9118

SAREX-92 SAR Data Acquisition and Processing
European Space Agency              Date completed: January 1993

DESCRIPTION: In October of 1991, The Bercha Group with principal subcontractor Innotech Aviation Limited, was awarded ESTEC Contract No. 9643/91/NL/S2, entitled “Technical Support for the Implementation of the SAREX-92 Campaign”.
      The work under this contract entailed a preparatory and planning phase, an airborne data acquisition phase, and a post-flight phase dedicated to documentation and data processing. This work was carried out between November 1st, 1991, and October 15th, 1992.
     The planning phase involved specification of target areas, flight planning, permits and clearances, and administration for logistic provisions. SAREX-92 data acquisition involved the Convair 580 equipped with the C/X SAR instrument (Figure 1a), and flights over test sites in Venezuela, Guyana, French Guiana, Brazil, Colombia and Costa Rica (Figure 2). Mobilization took place from Ottawa on April 1st, 1992, and after a successful data acquisition program the aircraft returned to Ottawa on May 3rd, 1992. In addition to the SAREX-92 program funded by ESA, some data acquisition was undertaken for CCRS in Brazil, Costa Rica and Guyana.
      The data processing phase involved preparation of documentation, the transcription of the high density digital tapes (HDDTs) (Figure 3) to Exabyte computer compatible tape, slant to ground range and radiometric rectification, and production of image tapes and hard copy images. This phase of the program was carried out between May 1992 and October 1992.
      Figure 4 illustrates the operational configuration of the aircraft and image swath. Figure 5 shows a sample SAR image.

Figure 1a: Convair 580 equipped with the C/X SAR instrument

Figure 1b: Cockpit of Convair 580

Figure 2: Area Map

Click on image to enlarge

Figure 3: The system used for SAREX was capable of recording full resolution, full swath images in 8 bit format on high density digital tape (HDDT). The HDDT console is shown here

Figure 4: Illustration of the operational configuration of the aircraft and image swath. The system has the capability to obtain imagery utilizing both X- and C-band radiation.

Click on image to enlarge

Figure 5: Sample high resolution C-Band SAR image

R9115 Wildlife Habitat Classification for GIS Analysis
Canadian Wildlife Service
R9109 Integration and Processing of Satellite Gravity and Magnetic Data for Offshore Prospect Evaluation
Canadian Occidental Petroleum Limited
R9108 Landsat TM Image Interpretation: British Columbia
Conoco Canada Ltd.
R9106 SLAR Ice Image Data Management System Software Development
Amoco Canada Ltd.
R9105 Course on Applications of Remote Sensing to Geology
Petro-Canada Resources Ltd.
1990

To Top of Page

P9026 ICE BREAKUP MODELLING FOR NORTHUMBERLAND STRAIT
CLIENT: Delcan/Stone & Webster      DATE: 1990/91
DESCRIPTION: The work undertaken in this project was carried out in association with a committee of ice experts to develop
predictive models for the influence of the construction of a bridge across Northumberland Strait on the length of the ice season and the characteristics of the breakup season. Two approaches were developed, one based on a correlation between ice volume and the length of the ice season, and the other based on an analytical model of the ice breakup season itself. This latter model included the effects of ice transport, underside decay, and topside decay of the ice cover. The model was developed such that the influence of a bridge could be determined through its effect on transport of ice between zones within the Strait. The model was supported by a comprehensive dataset of wind events, tidal velocities, air temperatures, and solar radiation. The model was hindcast against 20 years of records of breakup seasons in which the model was verified at intervals throughout the season, as well as at the date of last ice. The results of the hindcast analysis were excellent illustrating a very high level of correlation between actual and analyzed results. Using the breakup model as developed, a series of simulations, each involving 1,000 years, was then run for a variety of bridge configurations. For each analysis, the model was executed for the breakup season both with and without the bridge and the difference in dates of last ice used to establish the impact of the bridge upon the length of the ice season in the Strait. The results of these simulations indicated that, on the average, the presence of the bridge tended to accelerate the breakup due to the increased underside melting of ice blocked from passage by the bridge. The extreme results indicated very slight delays in ice-out of the order of one day.
P9019 RISK ANALYSIS OF ALTERNATE DEVELOPMENT STRATEGIES FOR A NEW TAR SANDS MINE
CLIENT: Syncrude Canada Ltd.       DATE: 1990 
DESCRIPTION: Syncrude Canada Ltd. operates an extremely large oil sands mining, extraction and processing operation some forty kilometers north of Fort McMurray, Alberta.  In order to maintain or expand current production levels, it will be necessary to open up a new mine and an engineering screening study was carried out to identify, evaluate, and select for subsequent more detailed assessment in the design basis memorandum phase, the most promising integrated mining, transportation, and extraction systems. As part of the engineering screening study, the Bercha Group provided consulting services to develop and implement a risk assessment program.  A large number of options or alternative designs were studied, and one of the ranking criteria was to screen high priority options according to risk.  The risk assessment program identified and evaluated the major technical, implementation and operational risks associated with each integrated system alternative, in order to determine if any risks were of sufficient magnitude to affect capital and operating cost estimates. A ranking index was developed based on a comparison of the alternative design with that existing in current operations.  Results from the risk assessment were included as one of the criteria used to rank the most promising conceptual engineering designs for future mine development. 
P9018 RISK ASSESSMENT SURVEY OF OPERATING FACILITIES
CLIENT: Esso Petroleum Canada       DATE: 1990 
DESCRIPTION: The client was embarking on a program to promote operational excellence in all of its diverse operating facilities throughout Canada.  It was decided to include a preliminary risk assessment survey of all facilities and this project involved the development and presentation of an intensive training program for the client survey team.  Technical personnel were recruited from all regional operations and introduced to the program concepts through written materials.  All members then met as a team in one location to take an intensive three-day training course and workshop.  Following the training session, the Bercha Group provided consulting services for each of the teams as they carried out their surveys. The training workshop began with lectures on risk assessment principles, including definitions and applications.  The suite of preliminary risk assessment methods, such as What If analysis and risk logic diagrams, were then presented.  Following a review, workshop assignments provided the practical experience necessary to actually undertake the required surveys.  Finally a full blown preliminary risk analysis was carried out on an actual facility through role assignments within the classroom setting. 
P9015 RELIABILITY STUDY OF COAL STOCKPILES REQUIRED FOR ELECTRICAL THERMAL PLANTS
CLIENT: TransAlta Utilities       DATE: 1990 
DESCRIPTION: As the Provincial Regulatory Body, the Public Utility Board questioned the coal stockpile inventory maintained at four thermal plants operated by two utility companies.  In essence, costs had to be justified in terms of the risks associated with not supplying the required demand. The reliability of each thermal plant's stockpile was analyzed based on the mining process used to feed each of these stockpiles.  The overall process material flow was divided into sequential events which represented the chronology of operations carried out to deliver coal to the stockpile.  Operations logic diagrams were derived to assess the sequence of operational events and available contingency action steps should the material flow be interrupted.  The impact of each operational problem was characterized by the shortfall in rate at which coal was stockpiled and the length of time of disruption.  All significant material flow interruptions were then analyzed in terms of varying levels of contingent action and existing redundancies incorporated in both design and operations.  The scope of analysis included the complete cycle from planning through excavation, to stockpiling.
P9012 ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED EXPANSION OF THE ALBERTA SPECIAL WASTES TREATMENT CENTRE
CLIENT: Alberta Special Waste Management Corporation       DATE: 1990/91 
DESCRIPTION: Previous projects, PA8519, PA8420, PA8410, and PA8008 all involved various risk analyses which were carried out for different Government of Alberta departments to support the program being developed to treat hazardous wastes within the province.  The above referenced project, PA9012, was a continuation of the previous risk assessment work and was required to support an EIA for a proposed expansion of the existing waste treatment centre.  Special or hazardous wastes are collected from generators throughout the province and transported directly or through transfer stations to the treatment centre located in Swan Hills, Alberta.  The proposed expansion involved a substantial increase in the volume of hazardous wastes being transported on Alberta roadways and therefore a revised transportation risk assessment was included in the proposal EIA.  In addition to the accident and spill analyses, consequence analysis of potential spills of hazardous wastes for both the public and environment were included in the scope of work.  Risks associated with the existing operation were compared to those estimated for future operations of an expanded facility.  Results from the risk assessment were published in the EIA documents and then were presented and defended during public hearings. 
P9011 RISK ASSESSMENT FOR AN ENVIRONMENTAL CLEAN-UP STUDY OF 21 DEW LINE SITES IN CANADA
CLIENT: Canadian Commercial Corporation, on behalf of The United States Air Force       DATE: 1990/91 
DESCRIPTION: As part of the 1985 agreement between Canada and the United States to modernize the North American Air Defence System, the Dew Line System is being replaced by the North Warning System.  An environmental clean-up study of the 21 Dew Line Sites was commissioned in order to identify and investigate areas impacted by past waste disposal and spills and to determine and evaluate alternatives for the disposal of waste and remediation of spill areas.  A baseline risk assessment was carried out to document the magnitude of potential health and environmental risks at each of the 21 Dew Line sites and to provide a site specific quantification of risks to provide the basis for developing cleanup strategies. The baseline risk assessment methodology was based on that developed by the U.S. E.P.A. in their Risk Assessment Guidance for Superfund. The results of the baseline risk assessment were quantitative and qualitative characterizations of risk based on site specific exposure and toxicity assessments.  Both non-carcinogenic and carcinogenic risks were characterized for each contaminant at each site.  Non-carcinogenic hazard quotients were estimated to compare the level of site contamination to the potential hazard level.  Finally, carcinogenic risk was estimated in terms of the incremental probability of an individual developing cancer over a lifetime as a result of exposure to the site. 
P9009 MOLIKPAQ MODELLING, PHASE VII, FINAL MODEL TUNING AND VERIFICATION
CLIENT: Gulf Canada Resources Limited      DATE: 1990
DESCRIPTION: The objectives of this final phase of the development of a non-linear lumped mass model for the Molikpaq involved the verification and final tuning of the model on the basis of a series of actual ice interaction events monitored in 1985 and 1986. Before carrying out the final model tuning, all aspects of the model were thoroughly reviewed to ensure the appropriateness of the various stiffness, mass, and damping values being used. The sensitivity of the model output to various analysis parameters was determined prior to the actual analyses being carried out. The objective of this phase was to carry out a series of analyses of actual events in which only the properties of the ice sheet were varied, reflecting the actual conditions during interaction. The same structural model for the caisson, core, and berm, was used throughout. The results were highly encouraging in that excellent agreement was obtained between analytical and measured values of accelerations and displacements for a variety of locations throughout the structural system. The correspondence between both the period, and the amplitude, of the response was excellent, as was the overall shape of the response. The results indicate that it is possible to develop simple analytical tools capable of modelling complex non-linear dynamics of offshore marine structural systems.

Figure 1: The Molikpaq Figure 2: Example  finite element model schematic section.  Click on image to enlarge
P9002 NGL STORAGE TANKS HAZARD ASSESSMENT
CLIENT: Interprovincial Pipeline Company       DATE: 1990 
DESCRIPTION: The client had contracted for a novel design of an underground natural gas liquids (NGL) storage facility and due to potential public exposure, our firm carried out a hazard mitigation assessment of the proposed project.  The scope of work included a preliminary hazard analysis to define potential hazards and a consequence analysis to generally quantify general public consequences and hazards distances.  Hazards were identified through an analysis of historical worldwide instants and a hazard and operability  (HAZOP) study.  Consequence analyses were modelled in terms of release, dispersion, and ignition characteristics in order to define public hazard distances.  Finally hazard mitigation measures were evaluated both in terms of prevention through measures such as inherent design considerations or safety protection systems, in terms of consequence mitigation should the hazards in fact occur.
  Geomatics Projects (1990)
R9023 Feasibility Evaluation of Developing a Processing Capability for Improved SLAR Resolution
National Research Council of Canada
R9020 Remote Sensing Consulting Services
Gulf Canada Resources Ltd.
R9012 Environmental Impact Assessment for Proposed Expansion of the Alberta Special Wastes Treatment Centre
CLIENT: Alberta Special Waste Management Corporation       DATE: 1990/91 
DESCRIPTION: Previous projects, PA8519, PA8420, PA8410, and PA8008 all involved various risk analyses which were carried out for different Government of Alberta departments to support the program being developed to treat hazardous wastes within the province.  The above referenced project, PA9012, was a continuation of the previous risk assessment work and was required to support an EIA for a proposed expansion of the existing waste treatment centre.  Special or hazardous wastes are collected from generators throughout the province and transported directly or through transfer stations to the treatment centre located in Swan Hills, Alberta.  The proposed expansion involved a substantial increase in the volume of hazardous wastes being transported on Alberta roadways and therefore a revised transportation risk assessment was included in the proposal EIA.  In addition to the accident and spill analyses, consequence analysis of potential spills of hazardous wastes for both the public and environment were included in the scope of work.  Risks associated with the existing operation were compared to those estimated for future operations of an expanded facility.  Results from the risk assessment were published in the EIA documents and then were presented and defended during public hearings. 
R9011

Risk Assessment for an Environmental Clean-Up Study of 21 Distant Early Warning (DEW) Line Sites in Canada
CLIENT: Canadian Commercial Corporation, on behalf of The United States Air Force       DATE: 1990/91 
DESCRIPTION: As part of the 1985 agreement between Canada and the United States to modernize the North American Air Defence System, the DEW Line System is being replaced by the North Warning System.  An environmental clean-up study of the 21 DEW Line Sites was commissioned in order to identify and investigate areas impacted by past waste disposal and spills and to determine and evaluate alternatives for the disposal of waste and remediation of spill areas.  A baseline risk assessment was carried out to document the magnitude of potential health and environmental risks at each of the 21 DEW Line sites and to provide a site specific quantification of risks to provide the basis for developing cleanup strategies. The baseline risk assessment methodology was based on that developed by the U.S. E.P.A. in their Risk Assessment Guidance for Superfund. The results of the baseline risk assessment were quantitative and qualitative characterizations of risk based on site specific exposure and toxicity assessments.  Both non-carcinogenic and carcinogenic risks were characterized for each contaminant at each site.  Non-carcinogenic hazard quotients were estimated to compare the level of site contamination to the potential hazard level.  Finally, carcinogenic risk was estimated in terms of the incremental probability of an individual developing cancer over a lifetime as a result of exposure to the site. 

Figure 1: DEW Line station

Figure 2: Workers clean-up a DEW line site. The clean-up of all the sites will last from 1996-2013.

Photo courtesy of: http://www.dcc-cdc.gc.ca

R9004 Landsat TM Interpretation in Papua New Guinea
Canadian Occidental Ltd., Calgary
R9002 SLAR Ice Surveillance Service for the Beaufort Sea
Canadian Marine Drilling Ltd.

Figure 1: The SLAR system was installed in a Metro II aircraft, such as the one shown here.

Figure 2: Bercha SLAR system in Metro II used for R9002.

R9001 Earth Remote Sensing Marketing Strategy Study
Department of Regional Industrial Expansion
Government of Canada
1989

To Top of Page

P8910 BRIDGE / ICE / CLIMATE / FISHERIES INTERACTIONS AND CORRELATIONS - NORTHUMBERLAND STRAIT CROSSING PROJECT
CLIENT: Delcan/Stone and Webster Joint Venture      DATE: 1989
DESCRIPTION: This project is carried out jointly with Washburn and Gillis, Fredericton, New Brunswick, and P. Lane & Associates, Halifax, Nova Scotia. The project objective is to carry out a series of correlations between a variety of parameters in order to clarify the relationship between the construction of a bridge in Northumberland Strait, the ice climate, the marine and atmospheric climate, and the fishing industry in Northumberland Strait. The project involved the acquisition of information on atmospheric climate, water temperatures, ice regimes, and species landings for five species of fish and shell fish in Northumberland Strait. A series of interactions were carried out to obtain possible correlations between the fish landings and the various physical parameters. In conjunction with the ice jamming model developed in previous studies, these correlations would permit the effect of the bridge to be incorporated into the analysis through perturbations of the ice regime. The project also developed a loop model which related the various physical parameters to the marine food cycle in Northumberland Strait in order to obtain qualitative relationships between the physical parameters and the productivity of the various fisheries. The qualitative loop models were verified against the findings of the various correlations. It was found that the length of the ice season in Northumberland Strait was significantly related to the severity of the ice season and the wind conditions prevailing during the ice clearing period. Further, it was found that, although there was no significant relationship between the severity of the ice season and the cumulative freezing degree days for the region, if the wind regime during the winter was included in the correlation, then the combination of these two independent variables provided an excellent model for the severity of the ice season.
P8908 CONSULTING SERVICES AND PUBLIC HEARINGS - NORTHUMBERLAND STRAIT CROSSING PROJECT
CLIENT: Delcan/Stone and Webster Joint Venture       DATE: 1989
DESCRIPTION: This project involved the provision of expert consultative services to Public Works Canada during the preliminary hearings by the Federal Environmental Assessment Review Panel on the completeness of the data for the environmental assessment of the Northumberland Strait Crossing Project. The project required presence at all of the Public Hearings and the provision of responses to technical questions put by the Review Panel. Further, the project required the provision of consultative services to Public Works Canada and the Delcan/Stone and Webster Joint Venture together with other expert consultants on potential deficiencies in the data as identified by the Panel, and through discussions with the Panel.
P8905 NORTHUMBERLAND STRAIT RIDGE SURVEY - FIELD PROGRAM AND TEST PROGRAM
CLIENT: Delcan/Stone and Webster Joint Venture      DATE: 1989
DESCRIPTION: The principal objectives of this project were to obtain certain kinematic and mechanical information on the nature of ridges in Northumberland Strait. The information was required primarily to confirm that interactions between the proposed bridge piers and ridges represented the most significant ice load feature in Northumberland Strait. The work involved a field program in March of 1989 in which a variety of measurements were made on nine ridges with very high sails in Northumberland Strait. These measurements included measurements of ridge heights, depths of consolidation, in situ temperatures, as well as the acquisition of a large sample of ice from the consolidated portion of each ridge. One of the ridges was also surveyed underwater by a team of divers with underwater video. The samples of ice obtained from each ridge were then used for a series of laboratory investigations to determine some of the characteristics of the ice contained in the consolidated layer of each ridge. These tests included strength tests in two orthogonal directions, evaluations of ice density and salinity, as well as crystal structure determinations. The results provided an extremely comprehensive understanding of the kinematic and mechanical characteristics of ridges in Northumberland Strait. It was found that although consolidated depths of up to 1.8 metres were encountered, these layers were not entirely consolidated and significant voids were obtained in all cores. The results of the strength tests indicated that the ice in Northumberland Strait is not unlike first year ice in other regions of the world. The results of this investigation supported the consideration that the parameters being used to determine the ice ridge forces on the bridge piers were not unrealistic and were suitably conservative.
P8901 METHOD FOR PRELIMINARY RISK ASSESSMENT OF AGTD AND FOOTHILL PIPELINES
CLIENT: Nova Engineering Services       DATE: 1989 
DESCRIPTION: The client operates the transmission pipeline network for the distribution of natural gas within the Province of Alberta.  This transmission network is comprised of 762 pipelines and associated compressor stations and facilities.  A risk assessment methodology specific to these facilities was developed as a tool to be used for achieving a safe, environmentally responsible, cost-effective and reliable operation.
  Geomatics Projects (1989)
R8914 Multisensor System Development for Aquifer Detection
Dow Chemicals
R8913 SPOT and SLAR Geologic Interpretation in Sabah
Phoenix Resources, Malaysia
R8909 Quality Control Criteria for SAR Ice Imagery
Atmospheric Environment Services
The Bercha Group was actively involved in ice reconnaissance for the Government of Canada.
R8906 SB-8 SAR Interpretation
Sun Malaysia Petroleum Company, Malaysia
R8904 Sarawak SK-12 SAR Quality Control
Offshore Petroleum and Investment Corp., Malaysia
R8901 U.S. Beaufort SLAR Ice Surveillance
Arco Alaska
1988

To Top of Page

P8827 MOLIKPAQ MODELLING, PHASE V, FREQUENCY ANALYSIS, FILTERING AND DAMPING EFFECTS
CLIENT: Gulf Canada Resources Limited      DATE: 1988
DESCRIPTION: This project is the fifth phase in a series of projects to develop, test and apply a simple lumped mass model of Gulf Canada's Mobile Arctic Caisson, the Molikpaq. The model has been developed to provide an analytical tool which will readily analyze the interactions between the Molikpaq and an interacting ice floe. These interactions are primarily dynamic and involve complex ice-structure interactions and complex ice behaviour at the interacting face. This project was primarily directed at clearing up a number of outstanding issues which had not yet been addressed and hence verifying the model results by carrying out a series of analyses of actual ice events during 1985 and 1986. During these events, the instrumentation system on the Molikpaq had been used to acquire a considerable amount of data on the response of the system to the interacting ice floes. These responses, mainly the acceleration and displacement responses, were used as the basis of the model verifications.
     One of the objectives of this current phase was to code a filter system which would duplicate the filtering system inherent to the data acquisition system on the Molikpaq. This analytical filtering system would then permit more realistic comparisons to be made between analytical results and measured responses. A further objective was to provide some realistic measure of the amount of damping available through radiation damping within the plane of the ice sheet. This damping was included in the ice model prior to the comparisons between the measured responses from actual events and the comparable analytical results. Four events were used for comparison purposes, representing a wide range of load frequencies, load amplitudes, and ice properties. A single structural representation was used for all events with only the appropriate ice properties being changed between events. The analyses were carried out for a two node representation of the structure and subsequently for a more complex 25 node representation of the structure. The results were presented in an Interim Report and a Final Report.
P8820 EMERGENCY RISK ANALYSIS OF CAROLINE SOUR GAS DEVELOPMENT PROJECT
CLIENT: Shell Canada Limited       DATE: 1989 
DESCRIPTION: The client was proposing to develop a very large sour gas reservoir in the Caroline area of Alberta, which contained natural gas, hydrogen sulphide (H2S), and natural gas liquids.  This development was to cover a large region and an accidental release of reservoir fluids represented a potential public hazard due to the toxicity of hydrogen sulphide and the flammability of natural gas liquids.  Risk analysis work generally following a Safety Case approach to quantify these hazards was initiated at the earliest engineering phases and was included as an integral part of the development plans through to regulatory approvals.  Risks for all principal release scenarios were quantified by integrating the probabilities of releases with information related to release characteristics, plume dispersion, and human response in order to estimate the annual probability of being exposed to a fatal concentration of H2S or an explosive mixture of natural gas liquids.  Detailed modelling work was carried out to define risk parameters and provide the basis for implementing optimum risk mitigation measures.  These measures were then included in the plans for design, construction, operation and management of the project facilities.  The risk analysis work was documented in both technical reports and summaries used for public communications.  Expert testimony was provided for an extensive public hearing, which was required for regulatory approval of the development application.  Finally, risks were evaluated for a competing application at the hearings, which concluded with regulatory approval going to our client's application.
P8819 CONSULTING SERVICES RE: NORTHUMBERLAND STRAIT
CLIENT: Public Works Canada      DATE: 1988
DESCRIPTION: The work carried out in this project involved the technical evaluation of the proposals submitted to Public Works Canada in response to the call for tenders for the construction of a fixed link crossing between Prince Edward Island and New Brunswick. The technical evaluations carried out in this project included evaluations to determine the influence of the proposed bridge structure on the ice regime in Northumberland Strait, and the ice forces used for the design of the same bridges. The technical evaluations were carried out on the basis of the requirements of the original bid package and the previous studies carried out by Bercha and Associates on the problem of ice jamming in Northumberland Strait. The review process was a two part process in which each of the tendering consortia were advised of any possible short-comings in their proposal and provided with an opportunity to revise their proposals accordingly. A second round of reviews were then carried out. The review process also considered the impacts that the proposed bridges would have on the fast ice regime in Northumberland Strait, including possible extensions to the fast ice, and any delays in clearing of the fast ice. Although results were submitted to Public Works Canada and the consultants to Public Works Canada on an on-going basis, a Final Report was prepared once the evaluations had been completed.
P8815

 

RISK ANALYSIS OF NGL TRANSPORTATION AND TERMINAL FACILITIES
CLIENT: Esso Resources Canada Limited       DATE: 1988 
DESCRIPTION: Esso was implementing a truck transportation and handling system to move Natural Gas Liquids (NGLs) from producers to an existing pipeline and due to the inherent hazards of NGLs, there were safety concerns regarding a new operation.  NGLs are transported under pressure to store them in liquid form, however, any release to the atmosphere has the potential to form a flammable or explosive vapour cloud. The NGL truck transportation and handling system was analysed to estimate the probability of a fire or explosion from an accidental NGL release.  Analytical techniques included site visits and operating audits, auditing compliance to standard practices, statistical analysis of historical accidents, knowledge-based hazard and operability studies, and fault tree analysis.  Results generated a better understanding of the potential hazards and prioritisation of optimum risk mitigation strategies.
P8811 NUMERICAL MODELLING OF ICE-STRUCTURE INTERACTION RESPONSE OF THE MOLIKPAQ
CLIENT: Gulf Canada Resources Limited      DATE: 1988
DESCRIPTION: This project was Phase IV of an on-going project to develop a dynamic non-linear lump-mass model of Gulf's Mobile Arctic Caisson, the Molikpaq. This project was essentially an extension of previous work carried out as projects PA8716, PA8704, and PA8609. The principal objective of this project was to integrate into the previously developed lumped mass models for the Molikpaq, a model for the ice sheet. The ice model was based on work carried out by Gulf Canada Resources Limited in conjunction with British Petroleum, to provide a rheological model for the behaviour of the intact ice sheet, and the pulverized ice layer between the ice sheet and the structure. The integration of the ice model was carried out in a series of stages, which included altering the solution technique used with the ice model to accord with that used with the structure model.
     The structure model consisted of a series of lumped masses connected by elements capable of representing both elastic response and inelastic response. The steel caisson was assumed to behave elastically under all conditions of loading, both static and dynamic, whereas the interface between the caisson and the sand core and berm was provided with a non-linear response capability to model the potential for slip between the caisson and the sand and to model the non-linear behaviour of the sand, particularly shear softening, under dynamic loading. The structure model was also provided with a series of foundation elements which were able to model the interaction between the sand berm and the seabed. The response of the structure model was validated with a series of static ice interactions with the Molikpaq. The ice model consisted of a series of elements which modelled the in-plane elastic behaviour of the ice sheet, the radiation damping within the plane of the ice sheet, and the highly non-linear behaviour of the crushed layer of ice created between the ice sheet and the steel caisson of the Molikpaq. This behaviour included sudden crushing of the intact ice sheet and the creation of pulverized ice, and the viscous extrusion of the pulverized ice under the action of continued motion of the ice sheet which included some cohesive strength. The ice model was analyzed on its own, with a single node representation of the structure, and with a two node representation of the structure. A series of parametric studies were carried out to evaluate the sensitivity of the results to various parameters of the ice model. Finally, the results obtained from the combined model, including a two node representation of the structure, were compared with the data obtained from the prototype measurement system, during an actual ice interaction event. A comparison between the measured and analyzed responses was quite good considering the very simple level of structural modelling being used at this stage.
P8807 SPECIALIZED NON-LINEAR STRUCTURAL ANALYSIS COMPUTER SOFTWARE DEVELOPMENT
CLIENT: Alberta Technology and Telecommunications      DATE: 1988
DESCRIPTION: This project involved the modification, development, and testing of a series of nine structural engineering programs as marketable software for use on microcomputers. The project was a cost share project, 50% supported by the Alberta Government, and 50% supported by Bercha and Associates. The original programs were available from the University of Calgary where they had been developed as research tools, executable on mainframe computers. Preprocessor programs were developed for each of the nine structural engineering programs to provide user friendly and interactive capability for the input of the required data. Preprocessors included graphic display of the structure, and full edit capability. The programs were fully tested for error checking, admissibility of the data, and for all possible ranges of data combinations. Post processors were developed for each program which permitted the results of the program analysis to be displayed in graphic form both on the screen, and by plotter. User manuals for each of the programs were developed which provided a concise and clear description of the program capabilities, the information required, and provided examples of the application of each program.
P8805 NORTHUMBERLAND STRAIT CONSULTING SERVICES
CLIENT: Public Works Canada     DATE: 1988
DESCRIPTION: For this project, the company was retained by Public Works Canada to act on their behalf in monitoring the acquisition program by McLaren Plansearch to obtain ice, oceanographic, and meteorological data during the winter of 1988 within Northumberland Strait. In this role, the company reviewed the original proposal and made a series of trips to Halifax and Northumberland Strait to view the facilities and hold meetings with McLaren Plansearch personnel on progress of the program. Progress reports were submitted to the project manager with Public Works Canada at regular intervals.
P8803 NORTHUMBERLAND STRAIT BRIDGE PROBABILISTIC JAMMING ANALYSIS
CLIENT: Public Works Canada      DATE: 1988
DESCRIPTION: The work carried out in this project involved a major extension of the model developed under the previous project, PA8703. This extension involved considerable redevelopment of the jamming model to include effects of consolidation, synergistic effects during the analysis of a single winter, and evaluation of areas of ice blocked. All of these developments were included in the model in a probabilistic fashion in keeping with the entire emphasis of the jamming model. Sensitivity studies were carried out to ascertain the influence of particular ice and bridge structural variables on the amount of ice jammed from which it was determined that the two principal structural variables, span length and pier diameter had an extremely significant effect on the amount of ice jammed.
     Finally, an analysis was carried out using the most up-to-date information on ice properties in Northumberland Strait, using a six metre diameter pier, with a variety of different span lengths. The results of this analysis indicated that spans in excess of 175 metres would result in acceptably low amounts of ice being jammed. The analysis also determined what effect the ice blocked would have on the length of the breakup season. Analysis was carried out of five breakup seasons for which information was available and it was ascertained that there was a clear relationship between the ice concentration at the beginning of the breakup season and the length of the breakup season itself. Further analysis provided the conclusion that the length of the breakup season was more significantly affected by the environmental conditions during that period of the year.
  Geomatics Projects (1988)
R8825 Airborne Forest Inventory Sensing System and Software
National Research Council
R8824 Canadian Project Preparation Facility for Laser Topographic Mapping Applications
Canadian International Development Agency
R8823 Forestry Laser Data Acquisition
Institute for Technology Development (NASA)
R8822 Remote Sensing Training Program
Government of Alberta
R8814 Specialized Remote Sensing and Geophysical Training and Technology Transfer Program
Directorate General of Mineral Resources, Govt. of Indonesia
R8810 Interpretation of Barents Sea SAR Ice Imagery
Mobil Exploration Norway Inc.
R8809 Acquisition of Sea Ice SAR Data for the Barents Sea
Mobil Exploration Norway Inc.
R8808 Sea Ice SAR Signature Analysis and Interpretation Manual
Atmospheric Environment Service, Dept. of Supply and Services
R8806 Acquisition and Interpretation of High Resolution SAR Data for Northumberland Strait
Public Works Canada
R8804 Northumberland Strait Photographic Data Interpretation
Public Works Canada
1987

To Top of Page

P8718 RISK ASSESSMENT PROGRAM FOR BASIC ENGINEERING DESIGN OF TARSANDS MINING AND PROCESSING PLANTS MEGA-PROJECT
CLIENT: Syncrude Canada Ltd.       DATE: 1987 
DESCRIPTION: The largest tarsands mining and processing facility in the world is operated by the client some forty kilometres north of Fort McMurray, Alberta.  A major expansion project was initiated for this facility and work began with a design basis memorandum describing criteria for the preparation of engineering design specifications.  Fourteen consultants from across Canada were then commissioned to provide basic engineering design specifications for major facilities proposed for expansion.  Over twenty new facilities and numerous modifications to existing facilities were proposed to develop the mines, install a new energy efficient extraction and froth treatment plant, and integrate new hydroprocessing and hydrotreating plants to improve the yield in quality of synthetic crude oil without increasing sulphur emissions.
P8717.01 INSPECTION OF MV MISCAROO AND LASER SURVEYS
CLIENT: Transportation Development Centre      DATE: 1988
DESCRIPTION: As an extension to the previous project, this project involved an inspection of the MV Miscaroo while dry-docked in Vancouver in July 1988. The inspection involved a complete survey of the condition of the hull and the acquisition of approximately thirty latex impressions of examples of corrosion of the hull. These impressions were then surveyed using a scanning laser system as well as a mechanical measurement system. The results of the two systems were compared and the results of the entire survey were included in the data base used in the main project, PA8717. This survey of the hull which had been coated with Inerta 160 during the vessel's previous dry-docking in 1985 showed that no significant corrosion had taken place since then. The condition of the coating was excellent. However, the coating was removed in a number of locations and it was found that in the years of operations prior to 1985, significant corrosion had taken place in some locations of the hull. There was also some examples of extreme corrosion at the interface between stainless steel and regular steel on the Kort nozzles.
P8717 CORROSION OF MARINE STRUCTURES AND VESSELS OPERATING IN ARCTIC WATERS
CLIENT: Transportation Development Centre      DATE: 1987-1988
DESCRIPTION: The objectives of this study were to provide recommendations and guidelines for operators of steel arctic-going vessels on means of accounting for the severe corrosion that has been experienced to date. The work involved the accessing and analysis of the data base on corrosion acquired by Gulf Canada Resources Ltd. This data base had been acquired from periodic maintenance inspections of Gulf's Beaufort Sea fleet of icebreakers and drilling vessels. The data base also included results obtained from corrosion coupons purposely deployed on vessels in the Beaufort Sea. The data base included the measurement of the manifestations for corrosion as well as all of the required backup information on steel grades, operating history, welding procedures, corrosion protection measures, et cetera. From the analysis of this data, a measure of corrosion severity was established. The general types and severities of corrosion were then used as input to analytical analyses of the residual strength of components of the various vessels. These analyses included the strength of uncorroded sections as well as the strength of corroded sections including the effects of material loss and brittle fracture due to knife edge corrosion particularly of the Heat Affected Zone (HAZ). The comparative strengths of the corroded and uncorroded sections were then used to determine the effect of corrosion on the probability of failure and factors of safety for those components. The results of these analytical studies were then used to formulate guidelines for use in the design, operation, and maintenance of arctic-going vessels based on levels of corrosion and degrees of safety.
P8716 DEVELOPMENT OF SIMPLE MODEL OF MOBILE ARCTIC CAISSON, MOLIKPAQ - PHASE III
CLIENT: Gulf Canada Corporation      DATE: 1987
DESCRIPTION: This project was an extension of work carried out for Gulf Canada Resources Limited under previous projects PE8609 and PE8704. These projects were directed at the development of a methodology and the initial assignment of values to obtain a simple lumped mass model of the Molikpaq, its caisson, core, and berm. The model was designed to permit accurate analytical determination of the response of the structure to ice loads in both static and dynamic modes. In this phase, the 25 node, and 2 node, models previously developed were subjected to a series of sensitivity analyses to tune their responses to applied ice load functions. The sensitivity of the results was determined in some detail and the results tuned against data obtained from the instrumentation system onboard the Molikpaq for actual ice interaction events. Due to the simplicity of the model, the comparisons were only made for responses which were not highly location dependent. Principally, these responses included displacements and accelerations at various points throughout the structural system. The models were tuned for static events, for natural frequencies, and for dynamic response. A detailed analysis of the added mass and damping effects of the water in the ballast tanks of the caisson was undertaken. The Final Report presented the entire findings of the analysis together with appendices indicating the nature of the analytical responses obtained, the dynamic characteristics of the models, and an analysis of the added mass and damping coefficients within the ballast tanks.
P8707 MOLIKPAQ ANALYSIS FOR 50-YEAR ICE LOADS
CLIENT: Gulf Canada Resources Limited       DATE: 1987
DESCRIPTION: For its 1987 deployment, Gulf's Mobile Arctic Caisson, the Molikpaq, was to be set down at lesser water depths than previously, and the sand core was to be consolidated. As a result of these modifications in the deployment of the Molikpaq, concerns were raised regarding the stresses that would occur at various locations within the steel caisson. The work carried out involved static 3-dimensional analyses of the complete caisson with core and berm under the action of the 50-year return period ice forces. The 3-dimensional analysis for the complete structural system was carried out using a non-linear finite element package on a Cyber 205 supercomputer. The software package underwent significant modification to utilize the vector processing capability of the Cyber 205. The analysis was carried out using load increments and non-linear modelling for the interface between the steel caisson and the sand of the core and the berm. In order to simplify the complex structural arrangements of the steel caisson, a series of macro elements was developed in which each macro element encompassed a portion of the caisson between main bulkheads and between horizontal diaphragms. The stiffness of each macro element was developed using a linear elastic finite element program, SPAST, and involved significant finite element modelling in its own right. The results of the large 3-dimensional analyses were used as input to small 2-dimensional finite element models of portions of the caisson structure. The primary concern involved the in-plane stresses within the soil face of the caisson. Stress contours of portions of the soil face were obtained as a result of the two levels of analysis and compared with allowable design conditions. In general, although the calculated stresses were high, it was ascertained that these stresses were not unacceptably high.
P8705 FINITE ELEMENT MODELLING OF MOLIKPAQ FOR INSTRUMENTATION ANALYSIS
CLIENT: Gulf Canada Corporation      DATE: 1987
DESCRIPTION: The work involved the development of a comprehensive three-dimensional finite element model of the Molikpaq including core and berm and the interpretation of the results of a static analysis of the model to identify global load paths. From this interpretation of the results, the proportions of ice load transferred to the core, transferred around the caisson, and transferred to the berm through the caisson base were determined. Subsequently, a detailed finite element analysis of a single bulkhead was carried out in order to permit stresses to be evaluated at points corresponding to the strain gauge locations used as part of the on-board instrumentation package. Comparisons between the results of the finite element analysis and the strain gauge instrumentation were used to further verify the analysis and to test the use of simple algorithms for the interpretation of the strain gauge results and finally, prediction of ice forces. Excellent agreement was obtained between the analytical results and the measured results for some of the strain gauges on each bulkhead, whereas poor results were obtained for other gauge locations. It was determined that the stresses at particular gauge locations were highly sensitive to the vertical location of the ice load on the bulkhead. As this location could only be inferred from the ice load measurement panels on the caisson face, it was concluded that only results from gauge locations at which the stresses were largely insensitive to the vertical location of the ice load should be used for ice load determinations.
P8704 DEVELOPMENT OF A SIMPLE MODEL FOR THE MOBILE ARCTIC CAISSON, MOLIKPAQ - PHASE II
CLIENT: Gulf Canada Corporation      DATE: 1987
DESCRIPTION: This work involved the development of two specific models of the Molikpaq, one extremely simple and one slightly more complex for use with the numerical model developed in Phase I of the project. The work included the assignment of specific values to the various components of each model using only linear analysis, and the verification of the results through comparison with the response measured through the comprehensive instrumentation scheme onboard the Molikpaq. The numerical values were fine-tuned such that accurate values of natural frequencies and static response parameters were obtained by the two levels of modelling.
P8703

IMPACT OF PROPOSED NORTHUMBERLAND STRAIT CROSSING ON LOCAL ICE REGIME

CLIENT: Public Works Canada       DATE: 1987 - 1994
DESCRIPTION: The principal objective of the work was the determination of the frequency and severity with which ice jams would occur against the piers of the proposed Northumberland Strait Bridge Crossing and the forces exerted by ice on the bridge piers. Secondary objectives included an evaluation of ice motion within Northumberland Strait, evaluation of modifications of the ice cover characteristics in Northumberland Strait and evaluation of any possible impacts on the micro-climate and hence the potato crop of Prince Edward Island. The work involved an analysis of the properties of the ice cover in Northumberland Strait and the development and application of various algorithms to predict the occurrence of jams between piers and their duration. This was achieved through determination of the probability of a jam occurring and the probability that the resulting jam would survive the subsequent environmental clearing mechanisms. It was concluded that the proposed bridge configuration would not have a significant effect on the ice regime in the Strait but that the pier spacing had a very significant effect on these conclusions and thus was a critical element in the analysis.

  Geomatics Projects (1987)
R8714 Airborne Laser System for Forest Mapping
Industrial & Regional Development Program
Government of Canada
R8708 IRAP-M: Software Development for Airborne Lasers
Canadian National Research Council
R8702 Feasibility Study for Laser Topographic Mapping
Canadian International Development Agency
1986

To Top of Page

P8609 DEVELOPMENT OF SIMPLE MODEL OF MOBILE ARCTIC CAISSON, MOLIKPAQ
CLIENT: Gulf Canada Corporation      DATE: 1986
DESCRIPTION: The work involved the development of a simple numerical model for non-linear dynamic analysis of Gulf
Canada's Mobile Arctic Caisson, the Molikpaq. The model consists of a number of lumped masses in three dimensions connected by a variety of springs and dashpots representing the mass of the caisson, the elastic and inelastic response of the various components of the Molikpaq, and the viscous and hysteretic damping response, respectively. The project included the development of the necessary computer algorithms for the solution of the non-linear dynamic equations of equilibrium utilizing Gulf's HP300 series microcomputer. All components of the algorithm were fully tested through the application of the resulting program to a number of simple models in two and three dimensions utilizing linear, non-linear, static and dynamic analysis.
P8603 DEVELOPMENT AND PRESENTATION OF A TRAINING COURSE ON FAULT TREE ANALYSIS
CLIENT: NOVA, An Alberta Corporation        DATE: 1986 
DESCRIPTION: An intensive training course was developed on fault tree analysis (FTA) and presented to numerous groups within the operational and support departments of NOVA.  Initially, an extensive and detailed course manual was prepared which included an historical introduction to risk analysis and FTA, FTA applications, procedures, fundamentals, quantification, and evaluation methods.  Illustrative case studies were developed and data specific to the NOVA organisation was collated for use in workshops.  Presentation of the course consisted of lectures, audio-visual presentations, and tutorial workshops, which provided practical hands-on experience for participants to use FTA in the context of their daily work environment.  FTA is one of the principal methodologies available today for assessing risks in industrial and social endeavours.  Awareness of FTA methodology and its benefits is not universal, however, nor is there a universal approach to its application.  Material for the course was derived from experience in applying FTA in a whole spectrum of industries in order to assess risks associated with human losses, property and economic losses, and environmental damage.
  Geomatics Projects (1986)
R8605 Provision of SAR Sensor Operators, 1986-1991
Dept. of Energy, Mines and Resources
R8603 SAR Operations - CV580
Energy, Mines and Resources
1985

To Top of Page

P8527 FINITE ELEMENT ANALYSIS FOR LOCAL AND GLOBAL ICE LOADS
CLIENT: Gulf Canada Resources Inc.      DATE: 1985
DESCRIPTION: The work involved the testing of F.G. Bercha and Associates (Alberta) Ltd. ice finite element system through the evaluation of local pressures and global loads on the Molikpaq ice wall during floe impacts. The Molikpaq wall was modelled as a uniformly rigid wall while the ice floe was modelled using both uniform (homogenous) properties and random (inhomogeneous) properties. Various trajectories were considered and a special case of a circular caisson was evaluated.
P8526 DYNAMIC MODEL OF THE MOLIKPAQ
CLIENT: Gulf Canada Resources Inc.      DATE: 1985
DESCRIPTION: The work involved the development of a three-dimensional dynamic model of GCRI's mobile caisson island, the Molikpaq. The model is to be eventually used to analytically determine the effects of ice impacts on the caisson island and to predict the caisson response. The model was developed using three-dimensional macro elements of sections of the steel caisson combined with brick elements representing the core and the berm. The model was tested in static mode, for natural frequencies and under simulated dynamic load and was verified against the instrumentation output obtained by GCRI through the Molikpaq's operating history.
P8524 ICE SCOUR METHODOLOGY STUDY
CLIENT: Gulf Canada Resources      DATE: 1985
DESCRIPTION: The work involved the review, analysis and evaluation of alternate ice scour methodologies directed at optimizing pipeline burial depth within a risk optimization perspective. Following a comprehensive review of all available information, the relevant ice scour parameters were ranked in accordance with their significance. Methodologies were reviewed with respect to parameter completeness, technical acceptability, and definition of uncertainties. Results include definition of alternate methods of approaching a scour problem, generation of comparative results, and final recommendations on the preferred methodology.
P8518 RISK ANALYSIS OF PUBLIC LIABILITY EXPOSURE FROM LPG OPERATIONS
CLIENT: Stittco Energy Limited       DATE: 1985 
DESCRIPTION: The risk analysis of public liability exposure from Stittco's LPG operations in Manitoba included identification of potential LPG release scenarios from storage depots and utility distribution systems, modelling of release dispersion characteristics and quantification of public consequences and corresponding insurance liability.  Detailed analyses of public risks were carried out for credible release scenarios associated with the major LPG storage vessels located in six communities in Manitoba.  In addition, risk analyses were carried out for the LPG utility distribution systems operated in three communities.  Results of the risk analysis included risk spectra presenting the probability distribution of potential liability costs associated with Stittco's operations.  Such results were utilised to determine optimum insurance requirements. 
P8517 RISK ANALYSIS OF PUBLIC LIABILITY EXPOSURE FROM PIPELINE OPERATIONS
CLIENT: Peace Pipeline Ltd.       DATE: 1985 
DESCRIPTION: The risk analysis of public liability exposure from Peace Pipeline operations included analysis of the probabilities of pipeline releases, modelling of the gas release dispersion characteristics, evaluation of the public consequences and calculation of the associated public liability exposure.  Results and recommendations were specifically directed at insurance requirements to cover public liability exposure from pipeline operations.  A section of transmission trunkline transporting gas plant liquids was identified as the component posing the greatest public risks and therefore was specifically analysed in detail to quantify the greatest public liability exposure.  Results of the risk analysis included risks spectra presenting both the probability of an accidental pipeline release with the expected number of casualties associated with such a release, the public liability costs associated with potential casualties and a comparison of pipeline risks with other common risks. 
P8516 ICE INTERACTIONS WITH WINTERIZED AKER D-6 SEMI-SUBMERSIBLE
CLIENT: Aker Engineering A/S DATE: 1985
DESCRIPTION: The work involved the determination of ice loads on, and the resulting response of, a specially winterized version of the Aker D-6 semi-submersible designed for operations in marginal ice zones. Marine ice interactions included sheet ice in crushing and flexure modes and rubble pile loads. Static loads and simulated dynamic response loads were evaluated. An advance finite element analysis utilizing state-of-art ice rheology modelling was used in the determination of local pressures on the column shell walls. As the D-6 may operate in berg infested waters, interactions with bergy-bits were evaluated. These included high speed impact pressures on the column shell walls and the evaluation of the effectiveness of a patented bergy-bit deflector.
P8514 FAULT TREE PROGRAM FOR RISK ANALYSIS OF PRESSURE VESSEL RUPTURE
CLIENT: Esso Resources Canada Limited       DATE: 1985 
DESCRIPTION: Following completion of the risk analysis of pressure vessel ruptures (P8506), a software package was developed to facilitate repetitive, automatic calculations on the previously developed fault tree.  The software package was developed for implementation on an IBM Personal Computer. The fault tree program was a highly interactive program capable of modifying fault tree event values, performing sensitivity analyses and calculating corresponding estimates of brittle fracture failure probabilities. 
P8513 PROBABILISTIC ICE ATLAS FOR CONCEPTUAL DESIGN
CLIENT: Marathon Oil       DATE: 1985
DESCRIPTION: The work involved the development of a comprehensive ice engineering manual for application in Arctic and marginal ice zone offshore areas. Specifically, the project involved the generation of seasonal ice zone maps for each of the designated study areas, description of the representative ice zones in graphical and tabular format, quantification of kinematic and mechanical properties, definition of data and methodology gaps, calculation of ice loads for all representative structure types for each study area and season, and generation of a final report consisting of an ice atlas and a textual description. The study areas covered included the entire Alaska offshore from the Aleutian Islands throughout the Bering Strait, the Chukchi Sea, around Point Barrow, to the U.S./Canada International Boundary. All ice kinematic and mechanical properties and all resulting ice loads are presented in probabilistic form for return periods of 1 year, 10 years, 30 years and 100 years.
P8511 AMMONIA STORAGE VESSEL RISK ANALYSIS
CLIENT: Esso Chemical Canada       DATE: 1985
DESCRIPTION: The scope of work included an evaluation of potential ammonia releases within the complete manufacturing and distribution system operated by Esso Chemical.  Ammonia is a toxic chemical and due to the inventory of material handled by Esso and the geographic distribution of their facilities, there was concern for potential public exposures. 
          A risk analysis was carried out to define the potential risk problem and quantify the risks of potential ammonia losses throughout Alberta and Manitoba.  Included in the scope was an analysis of the transportation of ammonia, the fate of releases during transportation, loading, storage, and unloading, and finally, a quantification of the consequences for the affected public.   Site specific risk analyses were carried out for the manufacturing facility and a number of field agencies in Alberta and Manitoba.  One particular concern included in the detailed analysis was the potential for brittle fracture failures in the storage vessels.  The analysis concluded with an assessment of potential risk mitigation measures. 
P8510 DEVON AREA PIPELINE SYSTEMS RISK ANALYSIS
CLIENT: Esso Resources Canada Limited       DATE: 1985 
DESCRIPTION: A comprehensive risk analysis was carried out for the Devon area pipeline systems operated by Esso.  The general objective of the work was to quantify the public risks associated with all pipeline systems in the Devon area.  Separate analyses were carried out for gas pipelines associated with the blowdown of a specific field and for three high-pressure natural gas liquids pipeline systems.  The risk evaluation included analysis of the probabilities of pipeline releases, modelling of the different gas release dispersion characteristics, evaluation of the public consequences and evaluation of safety measures to mitigate the associated risks.  Results of the analyses were utilised for the development of planned capital projects in the area. 
P8508 RISK ANALYSIS OF PRESSURE VESSEL RUPTURES
CLIENT: Esso Resources Canada Limited       DATE: 1985 
DESCRIPTION: The work consisted of a systematic analysis of the risk of ruptures due to brittle fracture of pressure vessels.  Catastrophic failures of pressure vessels due to brittle fracture occur rarely and the general objective of the work was to present a methodology for quantifying and analysing such rare risks.  The risk analysis program included the identification of potential event sequences resulting in a vessel rupture; the development of a fault tree logic structure; the quantification of risks of a vessel rupture and the evaluation of the sensitivity of risk to its major components.  Physical property criteria for brittle fracture were utilised as a basis to analyse in detail a specific group of pressure vessels within Esso's operations. 
P8506 ANALYSIS OF PRESSURE VESSEL RUPTURES
CLIENT: Esso Resources Canada Limited      DATE: 1985
DESCRIPTION: The work consisted of a systematic analysis of the risk of ruptures due to brittle fracture of pressure vessels. Catastrophic failures of pressure vessels due to brittle fracture occur rarely and the general objective of the work was to present a methodology for quantifying and analyzing such rare risks. The risk analysis program included the identification of potential event sequences resulting in a vessel rupture; the development of a fault tree logic structure; the quantification of risks of a vessel rupture and the evaluation of the sensitivity of risk to its major components. Physical property criteria for brittle fracture were utilized as a basis to analyze in detail a specific group of pressure vessels within Esso's operations.
P8504 TESTIMONY ON MOBILE PCB DISPOSAL FACILITY
CLIENT: London Occupational Safety and Health Group       DATE: 1985 
DESCRIPTION: The work involved testimony at the Ontario Ministry of the Environment Hearings on mobile PCB destruction facilities in Ontario.  The testimony was based on previous risk analytic work associated with the transportation to treatment of hazardous waste substances and with transportation and storage of PCBs for disposal at a cement plant.  Following a brief description on the objectives and methodology of risk analysis, a review of the above-mentioned risk work was presented.  Specific comments were then presented on risks associated with mobile PCB disposal operations, which were being reviewed in the hearings for regulatory purposes. 
  Geomatics Projects (1985)
R8512 Scientific and Technical Support for the Definition of Mission Requirements for a Satellite Equipped with a Synthetic Aperture Radar (RADARSAT)
The Canada Centre for Remote Sensing, Dept. of Energy, Mines and Resources
R8510 Davis Strait, SLAR Survey
British Petroleum Resources
R8507 IRAP-M: Investigation of an Airborne Passive Radar Discriminator
Canadian National Research Council
R8504 SLAR Survey
British Petroleum Resources
R8503 Drew Point SLAR Imagery
D.F. Dickins Associates Ltd.
R8502 Airborne Laser Mapping Pilot Project
Government of Indonesia
R8501 Airborne SLAR Surveillance Service - East Coast
Joint Industry Project: Participants: Husky/Bow Valley, Mobil Canada, Petro-Canada

The Gulfstream-1 aircraft equipped with a Motorola Side Looking Airborne Radar (SLAR). The aircraft and system was used in many Bercha Group geomatics projects, including R8501.
1984

To Top of Page

P8420 ANALYSIS OF TRANSPORTATION ROUTING BETWEEN EDMONTON AND SWAN HILLS
CLIENT: Alberta Special Waste Management Corporation       DATE: 1984-1985 
DESCRIPTION: An analysis of spill risks for transporting special wastes by truck along available routes between Edmonton and the Swan Hills Treatment Plant was carried out.  Risk matrices were generated for each segment of the five available routes to provide a comparison of spill probabilities, accident causal factors and potential population and property consequences.  Results of the analysis included generation of an analysis methodology, collation of route characteristics and traffic counts from field surveys, calculation of spill probabilities, tabular and graphical presentation of the sensitivity of spill probabilities to major accident causal factors and generation of risk matrices.
P8417 POST-FAILURE ASSESSMENT OF RISK TO WHARF DUE TO ICE LOADING
CLIENT: Department of Public Works - Supply and Services Canada      DATE: 1984
DESCRIPTION: The work involved the application of previously documented ice-structure interactions to a wharf in the Baie de Chaleurs off the Gaspe Peninsula which failed in 1973 due to ice encroachment. The work included the interpretation of ten years of ice data for the region from public sources, resulting in probability distribution curves for ice kinematic properties for the site. Local meteorological records were also reviewed. The wharf was structurally analyzed to evaluate failure loads and the two sets of data compared to give the life of the structure and the failure risk. In an additional volume, general approaches to probabilistic ice loads and structural risk were described.
P8416 LOCAL ICE PRESSURES IN ICE-STRUCTURE INTERACTIONS
CLIENT: Department of Public Works - Government of Canada      DATE: 1984
DESCRIPTION: The work involved the development of a refined analytical model to accurately predict local ice pressures. The model incorporated all the known influences on ice rheology and ice-structure interactions. The resulting rheological models were incorporated in a non-linear, finite element program to allow advanced analysis of a variety of ice-structure interactions in both static and dynamic states. The rheology used is completely strain-rate dependent, features both isotropic and planar anisotropic behaviour, and is capable of modelling tension cracking. The resulting coding is fully tested and was supplied with a comprehensive user's manual. The model was used to evaluate ice pressures in interactions between thick uniform ice sheets and vertically sided structures. The modelling included modelling of both the ice sheet and the structure and was carried out using displacement increments until complete plastic flow of the ice sheet occurred.
P8415 GRAVITY-BASED STRUCTURE OPTIMIZATION FOR ICEBERG IMPACT
CLIENT: Northern Construction Company Limited and Delta Marine Consultants B.V.      DATE: 1984
DESCRIPTION: The work consisted of preliminary engineering design of gravity-based structures, qualitative and quantitative
analysis of GBS-iceberg interactions, and detailed analysis for selected designs. The detailed analysis was carried out utilizing two levels of finite element modelling; the first, a preliminary plane strain model, and the second, an advanced dynamic nonlinear model, giving both global and local pressures. Two specific structure types generated interactively between the FGBAL and construction teams were reviewed in detail and final load calculations carried out utilizing the FGBAL finite element programs. The result was a set of unique structural systems optimized for a Hibernia location in terms of iceberg impact, ocean loading, and operational requirements.
P8414 AN INVESTIGATION OF LOCAL ICE PRESSURES ON GRAVITY BASE STRUCTURES - PHASE II
CLIENT: Petro-Canada Resources Inc.      DATE: 1984
DESCRIPTION: This project is derived from a requirement by the client to have an understanding of the local contact stresses and the resulting local structure response for various forms of gravity-based structure planned for the Hibernia development. The contact stresses result from iceberg impact and, due to the highly confined nature of the ice at the impact zone, a 3-dimensional finite element development was adopted. As the pressures and forces result from impact, the analysis was also dynamic, resulting in the requirement for a time-dependent solution. The resulting model incorporated both of these characteristics and used a state-of-the-art formulation for the failure of ice in multi-axial stress states. The advanced non-linear iceberg finite element model is based on real time dynamic interaction. All forms of energy dissipation of the initial iceberg kinetic energy, ice deformation and crushing, local structure deformation and global structural deformation are included, as well as advanced material models for rheology. Pre- and post-processors for the finite element package have been prepared. The program was used to carry out a series of analyses on various structural concepts being considered for the gravity base structure for the Hibernia development. For these analyses, the finite element modelling included both the iceberg and portions of the outside wall and the supporting cellular structure. Analyses were carried out on a two-dimensional plane strain model of a horizontal slice of the system. The results of the analysis emphasized the importance of appropriate modelling of the ice but also indicated that the structural stiffness played a secondary but nevertheless significant role in dictating ice contact pressures.
P8410 RISKS ASSOCIATED WITH THE TRANSPORTATION TO TREATMENT OF HAZARDOUS WASTE SUBSTANCES
CLIENT: Alberta Special Waste Management Corporation       DATE: 1984 
DESCRIPTION: An analysis was carried out of the risks associated with the truck transportation of liquid hazardous wastes from the various generating sites in Alberta to the proposed Swan Hills treatment plant.  The work was an update to a previous risk analysis (P8008) undertaken for the Environmental Council of Alberta.  Three scenarios of waste volume distributions were included in the analysis to determine the yearly probability of a spill accident based on 1979, 1980 and 1982 Alberta accident statistics. 
P8407 THE INFLUENCE OF ICE ON THE RELIABILITY OF PRODUCTION SYSTEMS IN THE HIBERNIA OIL FIELD
CLIENT: Petroleum Directorate - Government of Newfoundland and Labrador       DATE: 1984 
DESCRIPTION: The investigation of the effect of ice on the reliability of proposed Hibernia production systems included identification of ice parameters which are significant determinants of system design criteria and evaluation of the effects on system reliability resulting from uncertain estimates of ice parameters and ice loadings.  Risk analytic methodologies were developed and applied in the risk and reliability analysis of an example floating production system. 
P8404 PHASE II HEARINGS:  ERCB INQUIRY INTO THE LODGEPOLE BLOWOUT
CLIENT: Energy Resources Conservation Board       DATE: 1984 
DESCRIPTION: Bercha Final Reports on "Risk Analysis of Sour Gas Drilling Blowouts in Alberta" (P8303) and "Economic Risk from Sour Gas Well Drilling Blowouts in Alberta" (P8311) were submitted as direct evidence by the ERCB.  The authors defended the work following a formal presentation at the public hearings.
P8401 AN INVESTIGATION OF LOCAL ICE PRESSURES ON GRAVITY BASE STRUCTURES - PHASE I
CLIENT: Petro-Canada Resources Inc.       DATE: 1984
DESCRIPTION: The work was directed at the development and application of a preliminary numerical model for the evaluation of local pressures during iceberg-gravity based structure interactions. An extremely comprehensive review of all literature pertinent to icebergs and iceberg-structure interactions in the Hibernia area offshore Newfoundland was carried out. A number of models were developed for kinematically different impacts. These models were used to evaluate the effects of variations of a number of previously identified parameters on interaction loads and pressures. The output was purely deterministic but a sufficiently wide range of parameters and their values were considered to allow detailed conclusions regarding local pressures to be drawn.
  Geomatics Projects (1984)
R8421 Evaluation of the Technology for Detecting Small Objects at Sea: Airborne Sensor Platform
Ministry of Transport
R8418 Latitude Longitude Digitization
Husky/Bow Valley East Coast Project
R8412 Assemble, Integrate and Flight Test a Marine Mammal Remote Sensing System for a DH6 Twin Otter
Fisheries and Oceans, Supply and Services Canada
R8411 Evaluation of Aerial Remote Sensing as an Environmental Monitoring Technique for Pipeline Corridors
NOVA, An Alberta Corporation
R8410 Pipeline SLAR Survey in South Australia
South Australia Department of the Environment
R8409 1984 Aerial Reconnaissance Study for the Hibernia Development Project
Mobil Oil Canada, Ltd.
R8408 Scientific and Technical Support for the Definition of Mission Requirements for a Satellite Equipped with a Synthetic Aperture Radar (RADARSAT)
The Canada Centre for Remote Sensing, Dept. of Energy, Mines and Resources
R8406 Ice Processes Analysis - Mizex 1983
U.S. Department of the Navy
R8405 Marine Radar Program Support
Viatech Resources Systems Inc.
R8403 Iceberg Aerial Reconnaissance Data Analysis
Mobil Oil Canada Ltd.
R8402 An Investigation of Remote Sensing Equipment for Chronic Oil Discharges
Environment Canada
R8401

Airborne SLAR Surveillance Service - East Coast
Husky/Bow Valley East Coast Project                      Date completed: October 1984

DESCRIPTION: Bercha Group (Bercha) was contracted by Husky/Bow Valley (H/BV) to provide an ice and iceberg surveillance program in support of offshore drilling activities in the Hibernia area (Figure 1) during 1984. This was the first commercial ice and iceberg operational surveillance program in the area. The program extended from February 8 to June 30. During that period, 61 missions were successfully flown in the study area. The principal objective of the project was to determine the location of the ice edge and icebergs in the study and relay this information to H/BV in a timely and efficient manner (Figure 2).
Over 45 000 nm were flown by Bercha during the operational period and literally thousands of targets were detected. Comparison with ground truthing data has shown that some of the targets routinely detected by the Bercha team were growlers as small as 5 x 7 m. Scientifically, icebergs and other targets such as ships, buoy anchors, supply vessels and rigs were discriminated at a minimum of a 90% confidence level. From an operational point of view, the G-1 and SLAR proved their reliability and effectiveness as an operational support service. From an equipment point of view, the SLAR proved its reliability beyond any question. In the course of 61 flights, only 1 flight was cancelled due to equipment problems. SLAR more than adequately demonstrated its ability to perform on an around-the-clock basis, day or night, and under a variety of weather conditions. In several instances, the Bercha aircraft was the only airborne source of information as all other aircraft were grounded. This was due not only to the aircraft capability but also to the dedication of the aircrew and their ability to fly under marginal conditions.
      Due to the positional accuracy of the SLAR integrated with the aircraft horizontal systems, positioning of icebergs, bergy bits and growlers was available with only minimal error. Reliability of the equipment and dedication on the part of the crew reduced the SLAR downtime to a negligible amount. All-weather capability resulted in an on-call 24-hour operation. In summary, this first year of ice and iceberg surveillance was unquestionably successful. Confidence was developed in the MARS G-1 and SLAR system, the data product, and the logistics and communications network of a real-time operation.
Click on images for enlarged view.

Figure 1: Map of Study Area Figure 2: Sample Study Results
1983

To Top of Page

P8320 RISK ANALYSIS FOR THE SABLE GAS SYSTEMS PIPELINE PROJECT
CLIENT: Transcanada PipeLines Ltd. / Sable Gas Systems Ltd.       DATE: 1983 
DESCRIPTION: A quantitative analysis of the risks associated with capital cost estimate overruns and construction schedule delays was carried out for the three project segments; namely, the marine pipeline, the gas plant and the land pipeline.  The work involved a detailed analysis of the base estimate, quantification of the capital cost probability distribution, determination of contingency requirements to reduce risks, analysis of escalation effects, evaluation of schedule delay risks and an assessment of the consequences for project delays and increased capital costs.  Capital cost and schedule delay risks were quantified as an integral part of an overall project economic risk analysis undertaken by the client. 
P8317 ICE-STRUCTURE INTERACTION: ENGINEERING DESIGN AND CONSTRUCTION CRITERIA
CLIENT: Department of Public Works - Supply and Services Canada     DATE: 1983
DESCRIPTION: The work involved development and compilation of a marine ice load evaluation manual for the determination of total ice loads and ice load distributions on offshore structures with emphasis on gravity-based structures. The work was based on the analytical determination of total ice loads on various types of bottom-founded structures and on the numerical determination of the local peak pressures and their distribution. The numerical analysis was carried out utilizing a non-linear finite element program. Included in the work was an analysis of ice properties, structural parameters, development of interaction theory and generation of representative interaction loads.
P8315 RISK ASSESSMENT OF TRANSPORTATION SYSTEM FOR SWAN HILLS AREA MISCIBLE FLOOD
CLIENT: Federated Pipe Lines       DATE: 1983 
DESCRIPTION: An assessment of the risks to human safety as a result of the conversion of an existing oil pipeline to high vapour pressure, natural gas liquid (NGL) service was carried out.  Results included fault tree representations of accident scenarios and consequential events, an estimate of the probability of NGL release, presentation of risk spectra showing probabilities associated with potential casualty expectations, assessment of proposed risk mitigation measures and comparison of the proposed pipeline risks with commonplace casualty risks which were familiar to the public. 
P8311 ECONOMIC RISK FROM SOUR GAS WELL DRILLING BLOWOUTS IN ALBERTA
CLIENT: Energy Resources Conservation Board       DATE: 1983 
DESCRIPTION: The work involved an investigation of economic risks as an extension to the previous risk analysis of sour gas drilling blowouts in Alberta described under P8303.  Principally, the scope of work was intended to demonstrate the order of magnitude and trend distribution of tractable economic risk.  The investigation included analysis of blowout event statistics, definition of physical consequences, classification of damage consequences by severity of blowout, quantification of economic risk and ranking of risk mitigation measures by their benefit-to-cost ratio. 
P8308 RISK ANALYSIS OF DRILLSHIP UNITS OPERATING OFFSHORE LABRADOR
CLIENT: Petroleum Directorate - Government of Newfoundland and Labrador       DATE: 1983 
DESCRIPTION: A risk analysis of the operations of drillships and dynamically positioned semisubmersibles involved in exploration offshore Labrador was carried out to identify the principal scenarios associated with human, environmental, and property risks.  Work included the generation of risk scenarios associated with drilling operations, mobilization and demobilization to and from the drillsite, and ancillary operations supporting the drilling operations.  Emphasis was placed on human risks and causal sequences for accident scenarios threatening human safety were analyzed using fault trees.  On the basis of the risk analysis, risks were ranked and the risk mitigating effect and implementation costs of specific safety enhancement measures were analyzed. 
P8307 RISK ANALYSIS PROGRAM DEVELOPMENT
CLIENT: Alberta Environment       DATE: 1983 
DESCRIPTION: The work consisted of the generation of a detailed program plan for the implementation of risk analysis within the Alberta Government departmental structure.  Objectives were defined, a risk system inventory was compiled including risk type and risk level.  Methodologies for risk analysis were described and a specific program was defined.  Essentially, the program defined was one encompassing all principal risk sources associated with those natural and manmade systems within the jurisdiction of Alberta Environment.  These included but was not restricted to hydrocarbon exploration and production, petrochemical plants, chemical plants, dams, bridges, transportation of hazardous goods, landslides, avalanches, pesticides, microbiological systems, and radioactive facilities.  The program was defined through close interaction with appropriate Alberta Environment and other government departments. 
P8306 ARCTIC TANKER RISK ANALYSIS - EXTENSION
CLIENT: Canadian Marine Drilling Ltd.       DATE: 1983 
DESCRIPTION:
Certain aspects of a previous risk analysis carried out by Bercha (P8013) of the proposed crude oil Arctic tanker system were refined and further studied for an LNG operation.  The work included the development of a probabilistic risk model associated with  maneuverability and stopping capabilities of the Arctic LNG tankers as well as detailed sensitivity studies on a number of design modifications, including hull, machinery, and navigational aspects. The work included risks of hydrocarbon development in the Beaufort Sea, included the risk work on Canmar-Gulf Environmental Impact Statement and Bercha personnel defended the risk analysis in the associated hearings
P8304 PROGRESS PLANT RISK ANALYSIS
CLIENT: Shell Canada Resources Limited       DATE: 1983 
DESCRIPTION: The work consisted of the generation of a complete risk analysis of principle risk-prone components associated with a particular gas plant project.  Specifically, the implementation schedule and associated partnership participation components of the project were isolated and analyzed both independently and interactively.  Techniques utilized in the analysis included Delphi, fault tree, and Monte Carlo methods.  The emphasis of the risk analysis was on development of applicable decision-making tools and procedures. 
P8303 RISK ANALYSIS OF SOUR GAS WELL DRILLING BLOWOUTS IN ALBERTA
CLIENT: Energy Resources Conservation Board (ERCB)       DATE: 1983 
DESCRIPTION: The work consisted of a comprehensive investigation of sour gas well drilling blowouts in Alberta, including review and analysis of relevant historical data, identification and analysis of relevant causal factors, definition of risk minimization measures including industry practices and government regulations, evaluation of the feasibility of risk minimization measures and recommendation of optimal practices and other measure for minimization of sour gas blowouts.  The work was carried out on a rigorous statistical level based principally on a comprehensive database spanning several decades, which was provided by the ERCB.
P8301 ICE-STRUCTURE INTERACTION DESIGN MANUAL
CLIENT: Amoco Petroleum Company        DATE: 1983
DESCRIPTION: The work involved the development of a comprehensive ice engineering manual for application in Arctic and marginal ice zone offshore areas. Specifically, the project involved the generation of seasonal ice zone maps for each of the designated study areas, description of the representative ice zones in graphical and tabular format, quantification of kinematic and mechanical properties, definition of data and methodology gaps, calculation of ice loads for all representative structure types for each study area and season, and generation of a final report consisting of an ice atlas and a textual description. The study areas covered included the entire Alaska offshore from the Aleutian Islands throughout the Bering Strait, the Chukchi Sea, around Point Barrow, to the U.S./Canada International Boundary.
  Geomatics Projects (1983)
R8321 Directional Wave Spectra Intercomparisons
Environmental Studies Revolving Funds (COGLA)
R8319 Compilation of Ice Floe Velocities, Pack Ice Motion, Breakout Events, Multi-Year Ice Fraction, and Ice Edge Locations in the Chukchi Sea
Joint Industry Project: Participants: Amoco, Arco, Chevron, Exxon, Mobil, Phillips, Shell, Sohio, Texaco, Union
R8318 Assessment of Airborne Imaging Radars - Phase II
Environmental Studies Revolving Funds (COGLA)
R8316

Development of a System for Application of Remote Sensing Technology and Data to the Estimation of Arctic Marine Mammal Populations and Distribution
Freshwater Institute, Fisheries and Oceans Canada, Government of Canada   Date completed: March 1984

DESCRIPTION: This was a two-phase study directed at investigation of remote sensing equipment and techniques suited for Arctic marine mammal studies was conducted for the Department of Fisheries and Oceans, Western Office. In Phase I, current and future airborne and satellite remote sensing methods suitable for marine mammal surveys were reviewed and the capabilities of each system assessed. Manufacturers of remote sensing equipment were contacted and sensors displaying suitable resolution, operating specifications and capabilities were enumerated. Detection of marine mammals was classified into three levels; direct detection of actual mammals, indirect detection of features indicating mammal presence, and habitat identification. Each sensor capability for detection and identification of marine mammals was assessed, and the results were quantified through a sensor capability matrix. Aerial survey equipment and satellite sensor capabilities were examined for indirect and habitat detection and identification. Additionally, Phase I addressed availability of data, characteristics of platforms and ancillary hardware such as annotation systems and navigation equipment. Suitable systems were presented for further study. A map showing the study area is shown in Figure 1.
      Phase II involved development of an optimal survey system design, including definition of optimal remote sensing systems, design of tests for reliability and system capability, and definition of areas for further research and development.
      Image samples from the imaging systems considered are shown for SLAR (Figure 2), SAR (Figure 3), NOAA (Figure 4), and LANDSAT (Figure 5).
Click on images for larger view


Figure 1: Map of Study Area

Figure 2: Side-Looking Real-Aperture Imaging Radar (SLAR) image – Each 25 km wide swath shown is imaged on either side of the aircraft with a ‘delay’ zone underneath the aircraft of 5-10 km either side of the flightline. In this example, ice information such as concentration, and water features such as poynyas and leads are clearly evident.

Figure 3: Synthetic Aperture Radar (SAR) – Provides high-quality ice data, particularly on small ice features such as ice fragments, streamers and bands. This figure illustrates an area of highly fragmented ice in the Labrador Sea, imaged by SAR, in which the data are digitally recorded, then processed onto positive film. This is a one-look system, imaging on one side of the plane only.

 

Figure 4: National Oceanographic and Atmospheric Administration (NOAA) satellite data source. Example of a NOAA satellite image recorded in the visible wavelength. As the visible wavebands are used, cloud and fog will be imaged as shown in the example over the darker, open water areas. The 1.1 km resolution of NOAA imagery restricts its usefulness in marine mammal investigations to general habitat data (Uses 2,400 km wide swath.).

Figure 5: LANDSAT satellite image – Illustrated is a LANDSAT multispectral scanner (MSS) image. The resolution restricts it to providing general habitat information only. (Uses a 186 km swath.)

 
R8313 South Beaufort Sea Pack Ice Edge, SLAR Investigation
Joint Industry Project: Participants: Amoco Production Company, Mobil Exploration & Production Services, Shell Development Company, Sohio Petroleum Company
R8312 Investigation of Summer Pack Ice Invasion in the South Beaufort Sea - 1983
Joint Industry Project: Participants: Amoco, Mobil, Shell, Sohio
R8310 Compilation of Ice Floe Velocities and Edge Locations and their Relationship to Surface Weather Patterns in the Navarin Basin, Bering Sea
Joint Industry Project: Participants: Amoco, Chevron, Exxon, Mobil, Phillips, Shell, Sohio
R8305 Scientific and Technical Support for the Definition of Mission Requirements for a Satellite Equipped with a Synthetic Aperture Radar (RADARSAT)
The Canada Centre for Remote Sensing, Dept. of Energy, Mines and Resources
R8302 Mizex Airborne Data Acquisition Optimization
Joint Industry Project: Participants: Arco, Chevron, Sohio
R8301 SLAR Ice Surveillance - Beaufort Sea Drilling Operations
Canadian Marine Drilling Limited
1982

To Top of Page

P8219 RISK ANALYSIS OF OKOTOKS SOUR GAS FACILITIES
CLIENT: Canterra Resources Limited       DATE: 1982 
DESCRIPTION: The work consisted of a classical complete risk analysis of the sour gas facilities located near Okotoks and operated by Canterra Resources Limited.  Specifically, the gas plant, gathering system, and wells were analyzed for risks associated with the accidental release of hydrogen-sulphide gas.  The risk analysis included evaluation of initial risk, initial risk decomposition, dispersion modeling, and ultimate hazard evaluation represented in the form of risk spectra and separation distance plots. 
P8218 ICE STRUCTURE INTERACTION
CLIENT: Amoco Production Company      DATE: 1982
DESCRIPTION: The work consisted of the generation of a comprehensive ice atlas providing probabilistic ice interaction loads for the Alaska offshore continental shelf. Ice kinematic and mechanical properties were assimilated and tabulated for all ice features on the Alaskan OCS from the Aleutian Islands to the Beaufort Sea. Probabilistic ice properties were used to determine probable static ice loads were calculated with sufficient reliability to allow evaluation of costs for Alaska OCS lease sales.
P8215 ANALYSIS OF INTERACTIONS OF ICE COVER WITH A SEMI-SUBMERSIBLE DRILLING UNIT
CLIENT: Joint Industry Project: Participants: Texaco, Conoco, Union      DATE: 1982
DESCRIPTION: The work included the development of a mathematical model and generation of results for the interaction of ice cover with the columns of a semi-submersible drilling unit operated in marginal ice zone areas. Specifically, the work included state-of-art documentation, environmental and operational parameter definition, theory development, generation of numerical results for representative semi-submersible vessels, and detailed reporting. Extensions of the work included detailed investigation of bridging and non-linear phenomena. Bridging phenomena associated with pile-up formation and sustenance of stable rubble bridges among the columns was investigated utilizing principals of linear and non-linear stability. The effects of non-linear responses of the mooring systems were included in the form of sensitivity coefficients in the linear mooring system response.
P8213 RISK ANALYSIS OF SHELL PROPOSED MOOSE MOUNTAIN PIPELINES AND RELATED FACILITIES
CLIENT: Shell Canada Resources Ltd.       DATE: 1982 
DESCRIPTION: The work consisted of a systematic risk analysis of the sour gas facilities proposed by Shell to develop the Moose Mountain Field.  Analysis of the production well, gathering pipeline and compression facilities included hazard identification, sour gas release probability estimation, detailed site specific gas dispersion modeling in association with Alberta Environment, and ultimate public risks evaluation.  Results were presented as critical H2S dosage probability maps and the individual risk for people using the nearby recreational areas was compared to other common risks of everyday life. 
P8212 RISK ANALYSIS OF SEMI-SUBMERSIBLE UNITS OPERATING OUT OF NORTHEAST GRAND BANKS
CLIENT: Petroleum Directorate       DATE: 1982 
DESCRIPTION: The work consisted of a risk analysis with respect to human safety of the above facilities, including hazard identification and decomposition, identification and evaluation of safety enhancement methods, estimation of probabilities of hazards utilizing risk analytic techniques, and generation of inferences, conclusions, and recommendations on the basis of the work. 
P8208 ICE LOAD RELIABILITY ANALYSIS SYSTEM
CLIENT: Gulf Canada Resources Inc.       DATE: 1982 
DESCRIPTION: The work involved the development of an ice load risk analysis system applicable to the reliability analysis of offshore structures in ice infested waters.  The principal structure type analyzed was a caisson island in moderately deep water at a site in the South Beaufort Sea.  The work essentially included the development of failure scenarios leading to risk to capital and operating costs and human life.  Following definition of the scenarios, associated structural response probabilistic measures and the associated probabilistic ice loading conditions were quantified.  Synthesis involved association of all failure modes, response spectra, and causal spectra through probabilistic fault tree and event tree networks leading to a probabilistic quantification of the reliability of the installation within the Arctic offshore environment. 
P8206 RISK ANALYSIS OF THE GRASSY POINT LNG TERMINAL
CLIENT: Port Simpson Indian Band       DATE: 1982 
DESCRIPTION: An evaluation of the risks to human safety and property damage as a result of the construction and operation of a natural gas liquefaction plant and LNG tanker loading terminal operating in the vicinity of the Indian settlement at Port Simpson was carried out.  The work involved the development of accident risk scenarios utilizing the fault tree techniques, quantification of risks, evaluation of consequences, evaluation of Dome proposed risk mitigation and contingency plans, recommendation on other risk amelioration measures, and overall risk evaluation through comparison to accident scenarios having similar risk levels with which the client has an intuitive familiarity.
P8201 ICE-STRUCTURE INTERACTIONS - ALASKAN OCS
CLIENT: Phillips Petroleum Company      DATE: 1982
DESCRIPTION: The work involved generation of a reference manual for planning, evaluation, and preliminary design of structures in marine ice-covered waters in selected areas of the offshore continental shelf of Alaska. The work was relatively comprehensive, spanning the definition of ice properties for each of the principal lease areas, calculation of ice loads, and generation of structural concepts for different offshore service conditions. The work included definition of ice properties and associated structural concepts for a range of water depths in lease areas in the South Beaufort Sea, the Chukchi Sea, Norton Basin, Bristol Basin, Navarin Basin, and the St. George Basin.
  Geomatics Projects (1982)
R8217 Ice Floe Velocity and Edge Locations - Norton Sound, Bering Sea
Exxon Company, USA
R8216 Flaxman - West Harrison SLAR Freeze-up Survey
Exxon Company, USA
R8214 Arctic Basin Ice Morphology SLAR Investigation
Panarctic Oils
R8211 Operational Winter Ice Forecast Model
Canadian Marine Drilling Ltd.
R8210 SLAR Investigation of Chukchi Sea Ice Dynamics and Morphology
Joint Industry Project: Participants: Amoco, Chevron, Sohio
R8209 Beaufort Sea 1982 SLAR Ice Break-up Dynamics and Morphology
Joint Industry Project: Participants: Arco Oil & Gas, Shell, Sohio
R8208 SLAR Aerial Support of South Beaufort Sea Drilling Operations Through Aerial Support, UHF Downlink, and Field Interpretation
Canadian Marine Drilling Ltd
R8207 Micro-Densitometric Decomposition of SLAR Imagery for Evaluation of Ice Cover Morphological Properties
Lapp and Associates Limited
R8206 SLAR Investigation of Chukchi Sea Ice Dynamics and Morphology
Alaska Oil and Gas Operators Association
R8205 Investigation of Multi-Sensor Marine Ice Relief in the Bering Sea and Areas Around Prince Patrick Island
Atmospheric Environment Service, Dept. of the Environment
R8204 Analysis of Enhanced LANDSAT Imagery for Resource Management in Ghana
Wordrup, Delowitte, Haskins, and Associates
R8203 Remote Sensor Information for Resource Management Applications
Canada Centre for Remote Sensing, Dept. of Energy, Mines, and Resources
R8202 Acquisition of Side-Looking Airborne Radar (SLAR) of Wabamun Lake, Alberta
Monenco Consultants
R8201 Provision of Real-Time SLAR Support to South Beaufort Sea Drillships
Canadian Marine Drilling Limited
1981

To Top of Page

P8121 NORWEGIAN REFRIGERATED GRAVITY ICE ISLAND
CLIENT: Husebye and Olsen        DATE: 1981
DESCRIPTION: The work involved coordination and management activities directed at bringing together a viable consortium for the development of a patented system for the generation of ice-reinforced structures applicable to oil exploration in Arctic ice-infested waters.
P8119 EVALUATION OF HIGH PRESSURE LARGE DIAMETER GAS PIPELINE RUPTURE
CLIENT: Algas Resources Ltd.       DATE: 1981 
DESCRIPTION: The work consisted of simulation and analysis of statistics of large diameter gas pipeline ruptures in northern Canada.  Yield of the work consisted of a series of cumulative distribution functions giving probabilities of exceedance for different rupture types as well as cumulative rupture capabilities. 
P8118 CDU ICE MANAGEMENT SIMULATION
CLIENT: Gulf Canada Resources Inc.      DATE: 1981 - 1982
DESCRIPTION: The work involved the development of a predictive Monte Carlo simulator of ice cover and its interaction with an ice management program associated with the operation of the moored conical drilling unit on location in the South Beaufort Sea. The ice cover was rigorously simulated utilizing a hybrid deterministic/Monte Carlo technique which resulted in the generation of continuously varying ice cover representative of various seasonal periods from freeze-up to break-up. Features simulated included pressure ridges, multi-year floes, and ice sheets of various thicknesses. The cover generator was developed on the basis of cumulative distribution functions for the characteristic ice cover parameters obtained by reducing data available from GCRI. The operational component of the simulation involved the Monte Carlo modelling of the cover at a level or condition which the CDU can tolerate. The work included ice cover simulator design, ice management program analysis, and the generation of both sensitivity, predictive, and specific scenario forecast results.
P8114 ANALYSIS OF THE NORWEGIAN ICE GRAVITY PLATFORM
CLIENT: Aker Engineering A/S        DATE: 1981
DESCRIPTION: The work involved the evaluation of the interactions of a special refrigerated structure with the Arctic environment through its construction, installation, and operational phases. Specifically, risk to the structure associated with operational ice loads, with free-floating and seasonally variable ice cover, and with maximum return period ice loads was evaluated. The principal components of the structure are to be constructed on the west coast, and the logistics of a tow around Point Barrow during the ice-free summary window were considered.
P8109 ICE LOAD RISK OF SPECIAL ARCTIC DRILL BARGE
CLIENT: Gulf Canada Resources Inc.       DATE: 1981
DESCRIPTION: The work involved the probabilistic evaluation of interactions through a spectrum of interaction modes associated with dynamic ice cover interacting with a special moored Arctic drill barge. Interactions involving first-year ridges, multi-year ridges, multi-year floes, and level ice were described by means of interaction equations in probabilistic form. Loads associated with a probabilistic severity distribution were generated. The probability of structural survival was then quantified on the basis of cumulative distribution function inputs and scenario fault trees.
  Geomatics Projects (1981)
R8122 Preliminary Assessment of a Proposal to Establish an International Satellite Monitoring System Under United Nations Auspices
Department of External Affairs
R8120 Study of Airborne Remote Sensing Requirements and Packages Applicable to Canadian Needs for Oil Spill Detection and Surveillance
Environment Canada
R8117 Quantification and Analysis of Ice SLAR Signature Characteristics
Environment Canada, Ice Forecasting Centre
R8116 Acquisition and Interpretation of SLAR Ice Imagery Along the South Beaufort Sea Polar Ice Pack Edge
Mobil Oil Corporation
R8115 Scientific and Technical Support for the Definition of Mission Requirements for a Satellite Equipped with a Synthetic Aperture Radar (RADARSAT)
The Canada Centre for Remote Sensing, Dept. of Energy, Mines, and Resources
R8112 Acquisition, Interpretation, and Analysis of Katy's Floeberg SLAR Imagery
Gulf Canada Resources Inc.
R8111 Analogue/Digital Conversion of Laser Records of Ice Relief Profiles
Berok Systems Limited
R8108 Interpretation of SLAR Ice Imagery for the Norton Sound Area
Joint Industry Project
R8107 Ice Concentration Quantification at Canmar Drillsites
Canadian Marine Drilling Ltd.
R8106 Evaluation of Ice Cover Seasonal Variations in South Beaufort Sea Drillsites on the Basis of SLAR and Satellite Imagery
Canadian Marine Drilling Ltd.
R8105 Sea Ice SAR and Aerial Photographic Reconnaissance in the Hibernia Area
Mobil Canada Limited
R8104 Remote Sensing Multi-Sensor Environmental Monitoring Program of Foothills Pipe Line Right-of-Ways in B.C. and Yukon (MSS-TIR-FCIR Colour)
Foothills Pipe Lines (Yukon) Limited
R8103 SLAR Aerial Support of South Beaufort Sea Drilling Operations
Canadian Marine Drilling Ltd.
R8102 Comparison of SLAR Imagery of the Nearshore Alaska Coastline with Corresponding Aerial Photography for Microwave Signatures of Sea Ice
Atmospheric Environment Service, Environment Canada
R8101 Snow Cover LANDSAT Imagery, Alpine Ski Area Evaluation
Travel Alberta
1980

To Top of Page

P8018 AN EVALUATION OF OIL SPILL RISKS ASSOCIATED WITH EXPLORATORY DRILLING IN LANCASTER SOUND
CLIENT: Petro-Canada Resources       DATE: 1980-81 
DESCRIPTION: Work involved a quantification of risks of oil spills of various levels - chronic, accidental, and catastrophic - associated with the operation of the total offshore exploration system operated by Petro-Canada in the Lancaster Sound area.  System components include drillship and semi-submersible drilling systems, supply and ice management vessels, barges, aircraft, and the associated shore base and its logistics.  Principal methodology utilized was that of modified fault tree techniques and direct statistical and probabilistic analyses.  Results of the study included spill expectations and their spatial and temporal distributions within the space-time system matrix. 
P8016

INTEGRATED RISK AND RELIABILITY ANALYSIS – ARCTIC PILOT PROJECT

CLIENT: Petro-Canada Exploration, Inc.       DATE: 1981

DESCRIPTION: Information concerning the operational, economic, environmental, and scheduling aspects of the project was collected from the project’s sponsors. As a basis for comparison, data on existing LNG operations, and on other recent large energy projects in Canada, Alaska, and the North Sea were collected from other sources.

     The project’s rate of return on equity investment was chosen as the risk index, a common denominator for measuring all the project risks. The sponsors’ Generalized Evaluation Model (GEM), an economic evaluation computer program, was chosen as the primary computational tool. The initial analysis of the project consisted principally of identifying elements of the project, called risk centres, that face distinct sets of risks. The risks associated with each of these project elements were quantified in the form of a probability distribution function for input to the GEM program, principally through the use of the fault trees analysis technique. The program determined the effect of the risks on the risk index through the technique of Monte Carlo simulation. The final result was an expected rate of return on investment of 17.3%, with the main risks being due to the external factors of market prices and inflation rates. Recommendations are made for the reduction of the project’s risks. In addition to the technical work, expert testimony was provided by Dr. Bercha at NEB hearings on the project in Ottawa over a three week period.
APP Icebreaking LNG Tanker
P8014 A PROBABILISTIC STUDY OF ICE LOADS ON CAISSON ISLANDS
CLIENT: Gulf Canada Resources Ltd.      DATE: 1980
DESCRIPTION: The work consisted of a review of statistical analysis of available ice properties in the south Beaufort Sea and their application as inputs to a probabilistic analysis of ice loads on a contemplated Caisson Island in the 60-foot water depth range in that area. The probabilistic analysis was developed on the basis of FGBAL in-house expertise, utilizing the statistical property inputs, and used to generate a series of probabilistic load spectra, including return period considerations, for the full load range scenarios envisioned for the island.
P8013 ARCTIC TANKER RISK ANALYSIS - PHASE II
CLIENT: Dome Petroleum Limited       DATE: 1980 
DESCRIPTION: Work consisted of a substantial update of a previously carried out Arctic Tanker Risk Analysis.  Design and operational information of the tanker system was assimilated and analyzed as well as information of relevant tanker accident statistics based on recent studies carried out by governments and classification agencies and other sources as applicable.  An analysis of various Northwest Passage routes utilizing FGBAL's tanker route software risk analysis fault tree packages was carried out.  Results included calculation of spill probabilities and expectations for each segment of the route for both Arctic and conventional tankers, execution of sensitivity calculations to determine the risk dependence on major constituent factors, including critical spill causal areas in the accident scenario, and a bound risk estimate on the basis of information on confidence limits of the critical parameters obtained.  All calculations were carried out utilizing the FGBAL software library with some probabilistic and statistical adjunct analyses. 
P8010 PRELIMINARY ENVIRONMENTAL IMPACT STATEMENT PREPARATION FOR ALBERTA OIL SANDS EXTRACTION PLAN
CLIENT: McLeay Geological Services Limited       DATE: 1980 
DESCRIPTION: The work included the outline of the requirements for the preparation of an Environmental Impact Statement associated with the development of an Athabasca Tar Sands Open Pit Mining Operation.  Description of application and approval procedure, environmental impact statement definition, and identification of additional work including field data gathering and analysis for support of the environmental impact statement was carried out.  In particular, data gaps and suitable field and laboratory programs associated with the hydrogeology of the area and the biophysical systems were reviewed.  Additional information requirements for generation of a total environmental assessment concept, including execution of individual environmental assessments, with consideration of all phases of the development from construction through operation, to abandonment, through development of mitigating measures which can be implemented by the proponent and identification of early residual impact was included. 
P8008 RISKS ASSOCIATED WITH HAZARDOUS WASTE TRANSPORT AND STORAGE
CLIENT: Environment Council of Alberta       DATE: 1980 
DESCRIPTION: Following a literature review, field studies, and the gathering from various public and private sources of accident data relating to hazardous materials incidents, an accident risk analysis was performed.  This analysis included the development of scenarios for the accidental release of hazardous waste during transportation, unloading, and storage; the probabilistic analysis of accident scenarios to discover the quantitative relationships between main risk parameters and the probabilities and expected severities of accidental releases; and sensitivity analyses that assessed the effect of selected risk parameters on accident probabilities.  Relative levels of risk were also evaluated for specific transportation routes and several configurations of gathering sites and disposal facilities. 
P8006 GENERAL ARCTIC RETAINERSHIP
CLIENT: Dome Petroleum Limited       DATE: 1980
DESCRIPTION: High level technical consultations to Dome in specific areas of Arctic engineering including the following:
(a) Optimal offshore structure program development for production structures.
(b) Development of ice load instrumentation system for a structure to serve for an exploration platform and as a basis for an instrumented platform giving large-scale ice measurements.
(c) Development of optimal ice management program associated with offshore production atoll to permit feasible shipping and logistics operations.
(d) Development of optimal Arctic environmental information retrieval system for operational support for exploratory and production operations.
P8005 ARCTIC MARINE ICE FIELD SAMPLING, LABORATORY TESTING, AND ANALYSIS
CLIENT: Sohio Petroleum Company       DATE: 1980
DESCRIPTION: The work included the recovery of ice blocks from the ice cover in the Prudhoe Bay area in areas adjacent to future drillsites, in locations expected to coincide with C-axis oriented ice. Strategic samples were prepared in the laboratory from the blocks taken in the field, evaluated for crystal orientation utilizing crystallographic methods, and tested for compressive strength at various strain rates and orthogonal directions in order to ascertain the effect of C-axis orientation on strength. A detailed statistical correlation analysis and development of strength functionals was carried out using as a basis the data generated through the program.

P8002

.01

ICE AND SEA MODEL FOR BAFFIN BAY AND LANCASTER SOUND
CLIENT: Petro-Canada        DATE: 1979/1980 
DESCRIPTION: Data on the general environment with specific emphasis on icebergs, ice floes, ice cover, and sea state were gathered for an extended history as well as for a representative severe year.  Statistical and probabilistic analysis of the data was carried out in order to extract relationships required for a basis for the stochastic generation of a synthetic environment.  A Monte Carlo model of the environment utilizing random draw probabilistic constraint techniques was developed, permitting outputting of detailed time sequence histories of the synthetic environment.  The model consisted of several submodels; namely, an iceberg tracking submodel, an ice floe tracking submodel, an ice cover predictor, an ice break-up predictor, and a sea state mode.  The sea state model was driven by a synthetically generated wind model based on empirical data.  The synthetic environmental generator produced is a rigorous stand-alone Monte Carlo Model capable of simulating environmental conditions including hundred year extremes based on statistical and probabilistic extrapolation of historical data. 

P8002

.02

MONTE CARLO SIMULATION OF DOWNTIME RISK ASSOCIATED WITH DRILLING OPERATIONS IN LANCASTER SOUND AND NORTH BAFFIN BAY
CLIENT: Petro-Canada        DATE: 1980-1981 
DESCRIPTION: Previous work by Bercha on the simulation of offshore operations was refined through the development of a Monte Carlo simulator ultimately generating a probability distribution of the downtime likely to be associated with drilling operations in the geographical study areas.  Included in the simulator were icebergs, ice cover, wind and wave effects, mechanical problems on both ship and drilling procedures, logistic failures, and other significant subsystems contributing to the risk of operational downtime.  The sub-study run concurrently with the Monte Carlo simulation involved the generation of accident probabilities and their cumulative distribution functions for the operations, to be fed into the Monte Carlo simulator. These accident probabilities were generated utilizing a modified fault tree approach which produced varied distributions associated with a range of accidents of different severity ratings, ranging from a catastrophic blowout to minor structural marine riser damage. 
P7913 AN ASSESSMENT OF THE RISKS ASSOCIATED WITH THE TRANSPORTATION AND STORAGE OF PCBs FOR DISPOSAL AT A CEMENT PLANT
CLIENT: Department of the Environment       DATE: 1979-1980 
DESCRIPTION: The work included the execution of a risk and hazard and consequence analysis of potential accidents associated with the transportation, storage, and disposal of polychlorinated biphenyls (PCB's).  Functional phases of the work included information gathering, fault tree network generation, statistical analysis, consequence scenario generation, and result generation and interpretation as well as determination of primary risk issues and generation of recommendations for system improvement.  Major fault trees included those associated with the truck tanker transport of the PCB liquids, their transfer from trucks to storage facilities, and their ultimate transfer from the storage facilities and disposal in a cement kiln.  A specific plant site was studied in order to permit better corroboration of some of the scenarios envisioned.
  Geomatics Projects (1980)
R8020 Acquisition and Interpretation of SLAR Ice Imagery in the Bering Sea Area
Joint Industry Project: Participants: Amoco, Arco, Exxon, Mobil, Phillips
R8015 SLAR Imagery Acquisition and Interpretation of the Yukon Delta
Amoco Production Company
R8012 Labrador Sea Ice Information Compilation and Review
Petro-Canada Resources
R8009

Acquisition and Interpretation of SLAR Ice Imagery in the Prudhoe Bay Area
Joint Industry Project: Participants: Arco, Chevron, Exxon, Mobil, Phillips, Sohio     Date completed: March 1981

DESCRIPTION:  An aerial remote sensing, interpretation, and analysis program was carried out in order to generate information on ice break-up in the Prudhoe Bay area (Figure 1) in the Spring of 1980. The acquisition program consisted of the utilization of SLAR and aerial cameras for the acquisition of strategic imagery in the study area. Ancillary programs were included for groundtruthing, visual aerial observation by expert observers, and 35 mm photography. The SLAR overflight program consisted of a series of 9 sequential overflights to gather SLAR imagery in a 50 mile wide strip adjacent to the coast from Point Barrow to Barter Island, and several other special overflights both seaward into the multi-year pack and over designated near-shore areas.

       The imagery output consisted of complete SLAR coverage prints, mosaics, 400 planimetric aerial strip photographs, and numerous 35 mm prints and slides. The information yield, in addition to the imagery itself, consisted of the results of several levels of interpretive work, ranging from descriptive pictorial outputs to rigorous numerical results. The general interpretation program consisted of the generation of descriptive overlays for all the SLAR imagery. Quantitative interpretation results were generated utilizing a Bercha Group software package, yielding ice morphology and dynamics parameters statistically describing floe and feature characteristics, velocity fields, and other statistical and probabilistic parameters for the ice cover. Results of the numerical work were summarized in tabular and graphical format, adequately characterizing many of the mesoscale ice morphology and dynamics characteristics and their distributions throughout the break-up period over the spatial field of the survey area. Additional
interpretation work was carried out to expand current capability to interpret radar signatures of various ice features, including multi-year floes, ridges, and deformed ice. The physical yield of the work included over 250,000 sq. mi. of multi-sensor imagery at various scales, dominated by complete coverage of SLAR at a 1:250,000 scale, the scale controlled SLAR mosaics, aerial colour photographs, 35 mm colour photographs and slides, and the final report described herein. Conclusions of the work were presented, including conclusions of the efficacy of the methodology utilized as well as specific conclusions on the character of the ice system studied. Recommendations for further work for additional information extraction from the present imagery as well as for other programs were presented. Some of the photographic images generated during this project are shown in Figures 2 and 3.

Figure 1: Study area

Click on image to view enlargement

Figure 2: Drill Site, Issungnak 061 Figure 3: Drill Ship
R8007 Assessment of Relative Merits of Microwave and Visual Spectrum Sensing Techniques for Evaluation of Environmental Impact Parameters
Berok Systems Limited
R8003 Comparative Study of Landsat, SLAR, and SAR Imagery for Quantitative Evaluation of Lineament Distributions and Gradients in the North Central Plains
Conoco Exploration Company
R8002 Acquisition and Interpretation of Multi-Sensor Imagery (SLAR, TIR, FCIR, MSS) For Assessment of Seasonal Variations in Rangeland Biomass
Department of Agriculture
1979

To Top of Page

P7913 AN ASSESSMENT OF THE RISKS ASSOCIATED WITH THE TRANSPORTATION AND STORAGE OF PCBs FOR DISPOSAL AT A CEMENT PLANT
CLIENT: Department of the Environment       DATE: 1979-1980 
DESCRIPTION: The work included the execution of a risk and hazard and consequence analysis of potential accidents associated with the transportation, storage, and disposal of polychlorinated biphenyls (PCB's).  Functional phases of the work included information gathering, fault tree network generation, statistical analysis, consequence scenario generation, and result generation and interpretation as well as determination of primary risk issues and generation of recommendations for system improvement.  Major fault trees included those associated with the truck tanker transport of the PCB liquids, their transfer from trucks to storage facilities, and their ultimate transfer from the storage facilities and disposal in a cement kiln.  A specific plant site was studied in order to permit better corroboration of some of the scenarios envisioned.
P7912 ANALYSIS AND SYNTHESIS OF EXXON CONE TEST DATA
CLIENT: Dome Petroleum Limited      DATE: 1979
DESCRIPTION: Raw and semi-processed data from a series of small prototype 30° monocone ice interaction tests were reviewed, processed, and applied to the development and verification of certain mathematical models of the interactions. These interactions involved sheets, consolidated ridges, and consolidated and unconsolidated rubble piles. A new mathematical model for the interactions of ice rubble with rigid structures was developed and corroborated with the model test data. Both prototype and full-scale predictions were generated on the basis of the work.
P7910 LNG TERMINAL DESIGN FOR ELLEF RINGNES ISLAND - PETRO-CANADA
CLIENT: Genstar Construction Limited       DATE: 1979
DESCRIPTION: Provision of Arctic expertise to a design consortium for evaluation of alternative LNG terminal schemes to be located at Ellef Ringnes Island. Navigational ice conditions evaluation, ice management at terminal, construction and operational logistics, and preliminary engineering of wharf and terminal structures were included. Ice conditions were obtained from review and interpretation of aerial photomosaics supplemented by black-and-white panchromatic imagery. Several alternate routes and terminal configurations were studied.
P7907 DESIGN CRITERIA FOR CAISSON ISLAND PLATFORM SYSTEM
CLIENT: Dome Petroleum Limited       DATE: 1979
DESCRIPTION: Deep water post-tensioned concrete vertical-sided cylindrical caisson island loadings for governing iceload conditions in the south Beaufort Sea were established. The work involved qualitative review of interactions, design philosophy recommendation, and generation of applicable load spectra for specific structures.
P7906 STUDY OF ICE LOADS ON ARTIFICIAL ISLANDS
CLIENT: Sohio Petroleum Company        DATE: 1979
DESCRIPTION: Establishment of design criteria for artificial islands for hydrocarbon wildcat and production drilling in shallow waters off the Alaskan north coast. Three types of islands were considered; namely, vertical-sided and slope-sided caissons, ice-reinforced gravel, and conventionally reinforced gravel islands. Remote sensing information for three consecutive winters covering the Prudhoe Bay lease area was analyzed to provide a basis for ice kinematics. A variety of ice formations, including sheets, rubble piles, ridges, and ice islands, as well as ice conditions ranging from landfast to dynamic states were considered. Output was in a form amenable to structural designers.
P7905 EVALUATION OF ARCTIC PLATFORM SYSTEMS
CLIENT: Chicago Bridge and Iron Company       DATE: 1979
DESCRIPTION: Provision of specialist consultant services for evaluation of various proprietary structural concepts for offshore structures in Arctic waters. Work involved concept review, calculations, and generation of ice properties and interaction loads for the concepts under consideration.
P7903 ICE-HULL DYNAMIC INTERACTION ANALYSIS
CLIENT: Melville Shipping Ltd.       DATE: 1979
DESCRIPTION: A theoretical and experimental investigation directed at improving predictions of dynamic ice-hull interaction
loads generated during ice-breaking transits by Class 7 Arctic LNG carriers through the Northwest Passage. The work emphasized time-dependent nonlinear dynamic Arctic marine ice action on hull, including consideration of scale effects, nonlinear velocity effects on constitutive law, and interaction dynamics. The experimental program included application of high-speed fracture mechanics photography and strain monitoring techniques.
P7902 DRILLSHIP OPERATION SIMULATION N. BAFFIN BAY AND LANCASTER SOUND
CLIENT: Petro-Canada       DATE: 1979 
DESCRIPTION: A system-discrete simulation study involving modeling of dynamically positioned drillship interacting with environment in order to evaluate downtime risk.  Work involved data interpretation and processing and development of environment and drillship simulator.  Remote sensing data including LANDSAT mosaics were used for ice condition information.  Environment simulator was based on a Monte Carlo approach, involving generation of historically based synthetic data giving weather and sea states, ice cover, and iceberg conditions for specific drilling locations.  Deterministic drilling curves were augmented with stochastic forms of well control and mechanical problems.  Work involved substantial data processing, synthetic data generation, probabilistic analysis, to serve as a basis for cost benefit and environmental impact evaluation of drilling operations in north Baffin Bay and Lancaster Sound Petro-Canada drillsites. 
P7901 CRUDE OIL TANKER RISK ANALYSIS
CLIENT: Department of Fisheries and Environment       DATE: 1979 
DESCRIPTION: Risk analysis including discrete simulation of several existing and proposed oil tanker operations in Canadian waters.  Work includes detailed analysis of tanker accident scenarios by fault tree decomposition in order to assess accident frequencies for different types of operations, terminals, routes, geographical locations, and environmental variables.  Model development and verification with well-documented case studies as well as risk projections for existing and proposed operations constitute part of the work.
1978

To Top of Page

P7829 SOUTH SASKATCHEWAN RIVER BASIN PLANNING PROGRAM PRELIMINARY HYDROLOGIC AND PLANNING MODELS
CLIENT: Alberta Environment       DATE: 1978 
DESCRIPTION: Preparation of specifications and methodology for the development and use of computer simulation models in the long-term planning program for the South Saskatchewan River Basin in Alberta.  A master hydrologic simulation model was defined to model streamflows in the Bow, Oldman, and Red Deer Rivers plus the irrigation projects and hydroelectric reservoirs.  The model uses stochastic hydrology representative of future natural water supply to the Basin to evaluate alternative management strategies for operation and development of water storage schemes, irrigation projects, and the Basin in general.  The hydrologic data was analyzed and methods for in-filing data gaps using correlation techniques were prepared.  Techniques to maintain control of data quality using spatial and temporal serial correlation of streamflows were defined. 
P7826 CRUDE OIL TANKER RISK ANALYSIS
CLIENT: Department of Fisheries       DATE: 1978 
DESCRIPTION: Risk analysis including discrete simulation of several existing and proposed oil tanker operations in Canadian waters.  Work includes detailed analysis of tanker accident scenarios by fault tree decomposition in order to assess accident frequencies for different types of operations, terminals, routes, geographical locations, and environmental variables.  Model development and verification with well-documented case studies as well as risk projections for existing and proposed operations constitute part of the work. 
P7825 LATERAL ICE PRESSURE ICEBREAKING RESISTANCE STUDY
CLIENT: Melville Shipping Ltd.      DATE: 1978
DESCRIPTION: Estimate of the added resistance to icebreaking LNG tanker movement on Arctic route due to wind- and current-induced ice pressure. The work involves the integration of ice pressure effects into the ice-ship interaction equations for a spectrum of conditions likely to be encountered along the route. Review of environmental data, including remote sensing, field sampling, and model test results, ship design parameters, route and schedule constraints was carried out to generate major inputs to the analysis.
P7823 THERMAL DISTRIBUTION ICE MANAGEMENT DRILLSHIP CANOPY
CLIENT: Canadian Marine Drilling Limited      DATE: 1978
DESCRIPTION: Preliminary engineering and logistics design, including structural, mechanical, and naval design and logistics
planning for structural canopy to be deployed at perimeter of drillship in order to maintain an ice-free area in the neighbourhood of the drillship during shorefast drilling operations in the south Beaufort Sea.
P7822 DAVIS STRAIT EXPLORATORY DRILLING EVALUATION
CLIENT: Department of Northern and Indian Affairs       DATE: 1978 
DESCRIPTION: Risk analysis of oil spill and general accident hazards associated with semi-submersible and dynamically positioned drillship wildcat drilling operations in Davis Strait, north of 62E.  The work included quantification of geological, environmental, hardware, and design and operator error factors and their consolidation into an appropriate fault tree analysis, modeled digitally.  A software package generating various risk levels associated with the proposed operations and hard number means and bounds of accident probability predictions was yielded.  Objective of the work was partially to assess Imperial Oil's drilling permit applications for the area in question. 
P7820 BULK PLANT RISK OPTIMIZATION
CLIENT: Department of Fisheries and Environment       DATE: 1978 
DESCRIPTION: Major risk investigation directed at assessing accident potential associated with liquid hydrocarbon storage and terminal facilities.  Following in-depth investigation of current status for two major bulk plants, one on the Atlantic and one on the Pacific coast, the investigation involved a fault tree analysis of accident probability, including spill, personnel, and property hazards.  Subsequently, different accident prevention measures, including maintenance programs, new safety devices, alternate operating procedures, and better trained staff were incorporated into the networks and subsequently analyzed by super-imposition of an optimization procedure in order to define an optimal accident prevention level.  Constraints included costs of loss of product, personnel injury or death, property damage, pollution, fines or penalties, and direct and implicit costs of accident prevention measures.
1977

To Top of Page

P7717 ARCTIC ICE CONTROL STRUCTURES SMALL-SCALE PROTOTYPE DESIGN AND SUPERVISION
CLIENT: Canadian Marine Drilling Ltd.       DATE: 1977
DESCRIPTION: Certain structural components associated with the small-scale prototype testing of ice control devices to be used in drillships were designed and integrated into an experimental program utilizing a 100 ft. long supply vessel in the Arctic Ocean. Work included design and supervision of portions of the experiment as well as specialist consulting on thermodynamic and ice mechanics aspects of the problems.
P7715 ARCTIC SINGLE-POINT MOORING (SPM) SYSTEM
CLIENT: Dome Petroleum Limited       DATE: 1977
DESCRIPTION: The work entailed the preliminary engineering, logistics, and cost estimates for an offshore Arctic single-point mooring system capable of operating at a water depth of 200 feet. An optimal steel structural form was developed and designed. The system had build into it integrally a quick disconnect capability and integrated ballasting facilities to permit mobility in the case of threat of ice islands.
P7712 ARCTIC OFFSHORE LNG TERMINAL
CLIENT: Dome Petroleum Limited       DATE: 1977 - 1978
DESCRIPTION: Utilization of a steel caisson contained artificial island for the purpose of an LNG plant and storage terminal was investigated. The work involved a preliminary design, logistics, and cost estimates for the construction of the primary island and transfer of a complex LNG barge facility from the ocean surface to a secure location within the island.
P7710 ARCTIC MARINE TERMINAL MODULATION
CLIENT: Dome Petroleum Limited       DATE: 1977
DESCRIPTION: Schedule and cost estimates associated with a feasible modularized construction procedure for Arctic marine terminals suitable for the 50 - 200 foot water depth were generated. A constant storage capacity of 3,000,000 barrels was prescribed. Modifications to previous preliminary designs to facilitate modularization of the ring and tank wall were carried out. The construction procedure evolved about fabrication of the modules in the south, barging of these modules to a sheltered Arctic assembly facility where they would be joined into the ring and tank walls, and a short tow to and installation at the ultimate site.
P7709 ICE-SHIP INTERACTIONS EXPERIMENT DESIGN AND MANAGEMENT
CLIENT: Canadian Marine Drilling Ltd.       DATE: 1977
DESCRIPTION: An analytical and field investigation directed at developing a better understanding of the interaction between a moored ship and stable ice cover was carried out. The analytical work entailed development of a mooring line response simulator, ice-ship interaction theory, and incorporation of the analysis into a computer program which generates mooring line tensions and ship motions for given impinging ice conditions. Numerical sensitivity studies of different eight-point mooring system configurations minimize ice tensions for all probable ice encounter directions. Field corroboration, utilizing a full-scale operating situation for certain parts of the analyses was carried out. Project activities included specialist consulting, experiment design and production of an experimental manual, procurement of equipment, experimental management and supervision, analysis of results, and production of a final report.
P7707 ARCTIC MARINE TERMINAL (150 - 200 FT. WATER DEPTH) PRELIMINARY DESIGN AND LOGISTICS
CLIENT: Dome Petroleum Limited       DATE: 1977
DESCRIPTION: A preliminary design and order-of-magnitude estimate of costs and schedule for a structural ring-enclosed island type oil storage and marine terminal for 150 and 200 ft. water depths in the Beaufort Sea. A variable storage requirement, from 0 to 3,000,000 barrels of crude oil, was investigated. The terminal can accommodate two million barrel capacity tankers with beams of 170 feet and drafts up to 90 feet. The analysis of the ice-soil-structure interaction carried out for PE7705 above was utilized. Novel forms were necessary in order to counteract the large moments and localized forces imposed upon the terminal structure by prevailing Arctic ice conditions. Conceptual design, cost estimating, and construction logistic aspects of the investigation were carried out in conjunction with appropriately qualified contractors.
P7706 UNDERWATER OIL CONTAINMENT VESSEL ANALYSIS INTEGRITY STRESS ANALYSIS
CLIENT: Canadian Marine Drilling Ltd.       DATE: 1977
DESCRIPTION: A design for large membrane vessel for containing oil blowout discharges was reviewed and analyzed for the deployment and in-service modes. Work involved the development and solution of submerged inflated membrane equations coupled with the effects of submerged drained sand masses. Practical design considerations were incorporated.
P7705 ARCTIC MARINE TERMINAL (50 - 90 FT. WATER DEPTH) PRELIMINARY DESIGN AND LOGISTICS
CLIENT: Dome Petroleum Limited       DATE: 1977
DESCRIPTION: A preliminary design and order-of-magnitude estimate of costs and schedule for a structural ring-enclosed island type oil storage and marine terminal for 60 and 90 ft. water depths in the Beaufort Sea. The basic storage requirement for the terminal is three million barrels of crude oil, however sensitivity to different storage capabilities was investigated. The terminal could accommodate two million barrel capacity tankers with beams of 170 feet and drafts up to the full water depth. One of the major problems addressed was the analysis of the soil structure interaction necessary to predict the response to loadings on the outside of the structure caused by various Arctic ice conditions. Conceptual design, cost estimating, and construction logistic aspects of the investigation were carried out in conjunction with appropriately qualified contractors.
P7702 DEVELOPMENT OF A COMPREHENSIVE THEORY FOR THE PREDICTION OF ICE FORCES ON CYLINDRICAL AND CONICAL OFFSHORE STRUCTURES
CLIENT: Transportation Development Agency       DATE: 1977
DESCRIPTION: The development of a comprehensive theory for selecting design ice forces acting on cylindrical and conical offshore structures is carried out utilizing deterministic, semiprobabilistic, and probabilistic analytical techniques and associated computation methods. Flexural and crushing ice sheet failure phenomena are fist described using extensions of customary deterministic theories. Based on the deterministic equations, a semi-probabilistic technique is utilized to investigate the flexure-crushing transitional failure region for which it provides a continuous bimodal transition function. Next, methods of probabilistic design are used to generate a set of probabilistic equations for describing the crushing and flexural interactions. These equations yield values of the mean force and the associated standard deviation, which permits the specification of a unique load spectrum. The probability of an ice load of any given magnitude can easily be obtained from the load spectra. Numerical results include tabulation of loads for both analytically and practically significant ranges of increments of all main interaction variables for all levels and types of analytical methods mentioned above. Salient cases of the tabulations are described and illustrated graphically and applications to current design practices are suggested.
1976

To Top of Page

P7619 STUDY OF SCALE EFFECTS OF ICE SHEET FAILURE AGAINST CONICAL OFFSHORE STRUCTURES
CLIENT: Ministry of Transport        DATE: 1976
DESCRIPTION: Non-dimensionalization of the flexural ice failure equations. Parametric computer tabulation and graphics to
identify trends in the force variables associated with changes in the scale of the interactions as measured by the aspect ratio. Results applicable to design of lighthouse and bridge piers in inland waters.

P7614

.01

FEASIBILITY OF USING DRILLSHIP WASTE HEAT FOR MAINTENANCE OF ICE-FREE AREA AROUND DRILLSHIP
CLIENT: Canadian Marine Drilling Ltd.        DATE: 1976
DESCRIPTION: One of the conditions necessary to keep a drillship on location in shorefast ice is the prevention of ice formation and impingement in the immediate neighbourhood of the ship. Methods of keeping the ice from forming by utilizing drillship engine exhaust heat were identified and reviewed. Following thermodynamic calculations to ascertain that sufficient heat may be available, several specific schemes for getting the exhaust heat to prevent ice formation were reviewed and evaluated. One of the schemes was selected and preliminary design and cost estimates were carried out. A small-scale prototype test program was developed.

P7614

.02

 

FEASIBILITY STUDY - METHODS FOR MAINTAINING ICE-FREE AREA AROUND DRILLSHIP
CLIENT: Canadian Marine Drilling Ltd.        DATE: 1976
DESCRIPTION: A feasibility study of methods of maintaining a 100-foot wide ice-free area around a drillship on location in the South Beaufort Sea was carried out. The methods considered included ones entailing use of structural systems, energy injection systems, and active systems. Among the structural systems considered were the following:
(a) Floating structural canopy
(b) Air cushion vehicle support canopy
(c) Air-supported canopy
(d) Air-inflated canopy
(e) Structural, air-inflated, or air-supported dome
(f) Flexible folding insulation
Each of the systems had to have the capability of preventing freezing in a 100 foot wide area around the drillship as well as
accommodating peripheral ice movements of up to 80 feet in that area.
P7610 ENGINEERING PROPERTIES OF ICE IN THE BEAUFORT SEA
CLIENT: Dome Petroleum Limited        DATE: 1976
DESCRIPTION: The work comprises review, documentation, compilation, and recommendations for the properties of ice in the south Beaufort Sea relevant to ice-structure interaction. Shapes, velocities, strengths, and surface characteristics of the pertinent ice types and formations for various seasonal and geographical zones constitute the major results presented from interpretation and analysis of existing remote sensing information. Geometric and kinematic properties are cast into probabilistic form to optimize use of the relative sparsity of relevant empirical data. Strength and other material properties are presented in mean and maximum ranges to permit realistic use by the designer. The work represents up-to-date compilation of engineering and scientific knowledge of ice properties for the south Beaufort Sea which should augment both the general understanding and state of design readiness of the user relative to offshore oil and gas facilities in the area. A small part of the study area is shown in Figure 1
 

Figure 1:  A Section of the Study Area

  Click on thumbnail to enlarge

 

P7602

.01

ICE MECHANICS RESEARCH AND DEVELOPMENT ICE FORCES ON CONICAL OFFSHORE STRUCTURES
CLIENT: Ministry of Transport       DATE: 1976
DESCRIPTION: Extension of work in P7501 to incorporate alternate failure modes. Computer regeneration of all tables and graphs in metric units.
1975

To Top of Page

P7501 PARAMETRIC INVESTIGATION - ICE FORCES ON A CONICAL OFFSHORE STRUCTURE
CLIENT: The Ministry of Transport       DATE: 1975
DESCRIPTION: An analytical investigation of the variation in force on a conical offshore structure such as a lighthouse, for a variation of system parameters through a wide range. Parameters varied, including pertinent mechanical ice properties, interface properties, and structure variables. Following the modification of flexural ice sheet failure theory developed by F.G. Bercha earlier, the investigation was carried out with the aid of a digital computer. Over eighty thousand force calculations for approximately forty thousand combinations of the variables were executed. The results were presented in a set of 264 tables and 32 graphs of 8 curves each. Graphics were all performed using the CDC 6400 Computer and CalComp 563 drum plotters.
 

 To Top of Page

 

 

 

[About Us]    [Services]    [Projects]    [Photo Gallery]    [Publications]    [Software]    [Links]    [Contact Us]

This page and all contents are Copyright © Bercha Group Limited.